Share:

TR 75 over DRAINAGE DITCH

Facts

Source: National Bridge Inventory. Information not verified; use at your own risk.
Name:TR 75 over DRAINAGE DITCH
Structure number:042315000000000
Old structure number:000042315045709 (from 1992 edition)
Location:0.5 M W NUTWOOD
Purpose:Carries highway over waterway
Route classification:Local (Rural) [09]
Length of largest span:39.0 ft. [11.9 m]
Total length:41.3 ft. [12.6 m]
Roadway width between curbs:24.3 ft. [7.4 m]
Deck width edge-to-edge:24.3 ft. [7.4 m]
Owner:Town or Township Highway Agency [03]
Year built:2011
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 22.5 / HS 25 [9]
Main span material:Prestressed concrete [5]
Main span design:Box beam or girders - Multiple [05]
Deck type:Concrete Precast Panels [2]
Wearing surface:Gravel [8]

Latest Available Inspection: March 2013

Good/Fair/Poor Condition:Good
Status:Open, no restriction [A]
Average daily traffic:25 [as of 2012]
Deck condition:Very Good [8 out of 9]
Superstructure condition:Very Good [8 out of 9]
Substructure condition:Very Good [8 out of 9]
Structural appraisal:Equal to present desirable criteria [8]
Deck geometry appraisal:Equal to present minimum criteria [6]
Water adequacy appraisal:Equal to present desirable criteria [8]
Roadway alignment appraisal:Equal to present desirable criteria [8]
Channel protection:Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. [8]
Scour condition:Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Operating rating:48.5 tons [44.1 metric tons]
Inventory rating:35.6 tons [32.4 metric tons]
Sufficiency rating:98.0

Previous Inspections

DateSuff. RatingConditionDeckSuperstructureSubstructureSD/FOADT
March 201398.0GoodVery GoodVery GoodVery Good-25