Facts

Source: National Bridge Inventory. Information not verified; use at your own risk.
Name:Jim's Lake Rd over Spring Creek
Structure number:041180AA0381003
Location:2.0 Mi E of FM 280
Purpose:Carries highway over waterway
Route classification:Local (Rural) [09]
Length of largest span:9.8 ft. [3.0 m]
Total length:24.9 ft. [7.6 m]
Roadway width between curbs:23.6 ft. [7.2 m]
Deck width edge-to-edge:25.9 ft. [7.9 m]
Skew angle:30°
Owner:County Highway Agency [02]
Year built:2010
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18 / HS 20 [5]
Number of main spans:2
Main spans material:Concrete [1]
Main spans design:Culvert [19]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Gravel [8]

Latest Available Inspection: August 2018

Good/Fair/Poor Condition:Good
Status:Open, no restriction [A]
Average daily traffic:20 [as of 2010]
Structural appraisal:Better than present minimum criteria [7]
Deck geometry appraisal:Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Water adequacy appraisal:Better than present minimum criteria [7]
Roadway alignment appraisal:Equal to present minimum criteria [6]
Channel protection:Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. [8]
Culvert condition:Shrinkage cracks, light scaling and insignificant spalling which does not expose reinforcing steel. Insignificant damage caused by drift with no misalignment and not requiring corrective action. Some minor scouring has occured near curtain walls, wingwalls or pipes. Metal culverts have a smooth symmetrical curvature with superficial corrosion and no pitting. [7]
Scour condition:Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Sufficiency rating:93.9
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$235,000

Previous Inspections

DateConditionCulvert ConditionADTSuff. Rating
August 2018Good7 out of 102093.9
August 2016Good7 out of 102093.8
August 2014Good7 out of 102093.8
August 2012Good7 out of 102093.8