Facts

Source: National Bridge Inventory. Information not verified; use at your own risk.
Name:ROADWAY over INTERMITTENT STRM
Structure number:001001800700604
Location:TMK:7-5-11 HIENALOLI CUL
Purpose:Carries highway over relief for waterway
Route classification:Minor Arterial (Rural) [06]
Length of largest span:8.9 ft. [2.7 m]
Total length:24.0 ft. [7.3 m]
Roadway width between curbs:22.6 ft. [6.9 m]
Deck width edge-to-edge:24.0 ft. [7.3 m]
Skew angle:19°
Owner:County Highway Agency [02]
Year built:1972
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18 / HS 20 [5]
Number of main spans:2
Main spans material:Concrete continuous [2]
Main spans design:Culvert [19]
Deck type:Not applicable [N]

Latest Available Inspection: February 2018

Good/Fair/Poor Condition:Good
Status:Open, no restriction [A]
Average daily traffic:1,728 [as of 1984]
Structural appraisal:Equal to present minimum criteria [6]
Deck geometry appraisal:Basically intolerable requiring high priority of corrrective action [3]
Water adequacy appraisal:Superior to present desirable criteria [9]
Roadway alignment appraisal:Equal to present desirable criteria [8]
Channel protection:Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7]
Culvert condition:Shrinkage cracks, light scaling and insignificant spalling which does not expose reinforcing steel. Insignificant damage caused by drift with no misalignment and not requiring corrective action. Some minor scouring has occured near curtain walls, wingwalls or pipes. Metal culverts have a smooth symmetrical curvature with superficial corrosion and no pitting. [7]
Scour condition:Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Sufficiency rating:66.6
Recommended work:Other structural work, including hydraulic replacements. [38]
Estimated cost of work:$166,000

Previous Inspections

DateConditionCulvert ConditionADTSuff. Rating
February 2018Good7 out of 10172866.6
February 2016Good7 out of 10172866.6

Element Data

Source: National Bridge Elements dataset, 2019 edition. This feature is experimental.
ElementUnitsQuantity1-Good2-Fair3-Poor4-Serious
Culvert
Reinforced Concrete Culvertlinear ft.48341310
Bridge Rail
Steel or Aluminum Bridge Raillinear ft.2002000
Reinforced Concrete Bridge Raillinear ft.2020000