Bridges of Cherry Hills Village, Colorado
| Carries | Crosses | Location | Design | Status | Year Built | Year Recon. | Span Len. | Total Len. | Condition | Suff. Rating | ID |
NBI report | QUINCY AVE | HIGHLINE CANAL | 0.26 MI E OF COLO BLVD | Steel Stringer/Multi-beam or girder | -- | 1935 | 1983 | 53.2 | 61.0 | Fair | 77.0 | CHRY-02-0.26-02 |
NBI report | SH 88 ML | LITTLE DRY CREEK | GREENWOOD VILLAGE | Concrete Culvert (3 spans) | -- | 1959 | 1965 | 27.2 | 74.8 | Fair | 62.5 | F-17-J |
NBI report | QUINCY AVE | LITTLE DRY CREEK | 0.40 MI W OF UNIV BLVD | Prestressed Box Beam or girders - Single or Spread | -- | 1975 | -- | 56.4 | 62.0 | Fair | 79.5 | CHRY-02-0.40-01 |
NBI report | COLORADO BLVD | HIGHLINE CANAL | 0.30 MI N OF QUINCY AVE | Concrete Slab | -- | 1981 | -- | 23.0 | 24.9 | Good | 78.4 | CHRY-01-0.30-1A |
NBI report | SH 88 ML | HIGHLINE CANAL | AT BELLEVIEW AND BIRCH | Concrete Culvert | -- | 1982 | 1989 | 19.7 | 21.0 | Good | 77.1 | F-17-HH |
NBI report | SH 88 (BELLEVIEW) | GREENWOOD GULCH | 2.1 MI W. OF JCT I25 | Concrete Slab (2 spans) | -- | 1991 | -- | 24.0 | 49.2 | Good | 90.3 | F-17-LZ |