Carries | Crosses | Location | Design | Status | Year Built | Year Recon. | Span Len. | Total Len. | Condition | Suff. Rating | ID | |
---|---|---|---|---|---|---|---|---|---|---|---|---|
NBI report | STATE ROUTE 1 | SAN GABRIEL RIVER | 07-LA-001-0.04-LBCH | Concrete Tee beam (7 spans) | -- | 1931 | 1962 | 57.1 | 399.0 | Good | 84.8 | 53 0060 |
NBI report Bridgehunter | ORNGE AV AND HILL | LBC BIKE PATH | 0.5MI S/O WILLOW ST | Stringer/Multi-beam or girder (6 spans) | -- | 1932 | -- | 55.1 | 131.9 | Poor | 50.4 | 53C0208 |
NBI report | STATE ROUTE 22 | SAN GABRIEL RIVER | 07-LA-022-1.42-LBCH | Concrete Slab (8 spans) | -- | 1941 | 2000 | 49.9 | 335.0 | Good | 71.8 | 53 0302R |
NBI report | CARSON ST | LOS CERRITOS DRN CHAN | 0.4MI W/O BELLFLOWER BLVD | Concrete Culvert (3 spans) | -- | 1942 | 1954 | 10.2 | 32.2 | Good | 93.5 | 53C0405 |
NBI report | ATLANTIC AVE | STORM DRN #130 | 0.3MI N/O DEL AMO BLVD | Concrete Culvert | -- | 1945 | -- | 23.3 | 23.3 | Good | 72.3 | 53C0240 |
NBI report Bridgehunter | LONG BCH BLVD | LOS ANGELES RIV | 0.1MI E/O I-710 FWY | Concrete Tee beam (12 spans) | -- | 1946 | -- | 86.9 | 1002.0 | Fair | 94.6 | 53C0020 |
NBI report | WILLOW ST | LOS ANGELES RIV | 0.1MI E/O I-710 FWY | Concrete Tee beam (10 spans) | -- | 1946 | -- | 65.9 | 622.1 | Good | 87.3 | 53C0019 |
NBI report | WILLOW STREET | INTERSTATE 710 | 07-LA-710-7.89-LBCH | Concrete Slab (4 spans) | -- | 1947 | -- | 61.0 | 175.9 | Good | 83.2 | 53 0726 |
NBI report | STATE ROUTE 1 | STATE ROUTE 103 | 07-LA-001-8.27-LBCH | Steel Stringer/Multi-beam or girder (4 spans) | -- | 1948 | -- | 51.8 | 204.1 | Good | 67.9 | 53 0145 |
NBI report | STATE ROUTE 1 | UP RR | 07-LA-001-8.34-LBCH | Steel Stringer/Multi-beam or girder (3 spans) | -- | 1948 | -- | 51.8 | 151.9 | Good | 70.9 | 53 0347 |
NBI report Bridgehunter | ARTESIA BLVD | LOS ANGELES RIV | 0.1MI E/O I-710 FWY | Concrete Tee beam (12 spans) | -- | 1949 | -- | 70.9 | 726.1 | Fair | 89.3 | 53C0575 |
NBI report | GARFORD ST | STORM DRN #133 | 30FT W/O CLARK AVE | Concrete Culvert (2 spans) | -- | 1949 | -- | 11.2 | 22.6 | Good | 96.9 | 53C1591 |
NBI report | LOS COYOTES DIAG | SDBI 133 | 20FT W/O CLARK AVE | Concrete Culvert (2 spans) | -- | 1949 | -- | 14.1 | 28.9 | Fair | 96.3 | 53C0235 |
NBI report | WARDLOW RD | INTERSTATE 710 | 07-LA-710-9.07-LBCH | Concrete Tee beam (4 spans) | -- | 1949 | -- | 71.9 | 224.1 | Fair | 76.7 | 53 0727 |
NBI report | CARSON ST | PALO VERDE STORM DN | 0.5MI E/O WOODRUFF AVE | Concrete Culvert (3 spans) | -- | 1950 | -- | 11.8 | 36.4 | Good | 76.2 | 53C0406 |
NBI report | WARDLOW RD E | LOS ANGELES RIV | 0.1MI E/O I-710 FWY | Concrete Tee beam (10 spans) | -- | 1950 | -- | 78.1 | 763.2 | Fair | 92.3 | 53C0610R |
NBI report | WARDLOW RD W | LOS ANGELES RIV | 0.1MI E/O I-710 FWY | Concrete Tee beam (10 spans) | -- | 1950 | -- | 78.1 | 764.1 | Fair | 57.4 | 53C0610L |
NBI report | ANAHEIM ST | LA RIV / DEFOREST AVE | 0.1MI E/O I-710 FWY | Steel Stringer/Multi-beam or girder (7 spans) | -- | 1952 | -- | 113.9 | 766.1 | Fair | 77.3 | 53C0018 |
NBI report | STATE ROUTE 1 | INTERSTATE 710 | 07-LA-001-7.29-LBCH | Concrete Box beam or girders - Multiple (3 spans) | -- | 1952 | 1957 | 64.0 | 162.1 | Good | 82.8 | 53 0725 |
NBI report | SPRING ST | SAN GABRIEL RIV | 0.5MI W/O I-605 FWY | Concrete Tee beam (4 spans) | -- | 1952 | 1972 | 74.2 | 237.9 | Good | 76.6 | 53C0089 |
NBI report | ARTESIA BLVD | INTERSTATE 710 | 07-LA-710-12.89-LBCH | Concrete Box beam or girders - Multiple (4 spans) | -- | 1953 | -- | 66.9 | 262.2 | Good | 92.5 | 53 0820 |
NBI report | CONANT ST | PALO VERDE DRN | 50FT W/O PALO VERDE AV | Wood Stringer/Multi-beam or girder | -- | 1953 | -- | 30.8 | 33.1 | Fair | 89.5 | 53C0219 |
NBI report | RAVENNA DR | RIVO ALTO CANAL | 0.1MI S/O 2ND ST | Concrete Tee beam (2 spans) | -- | 1953 | -- | 36.1 | 73.2 | Poor | 64.2 | 53C0024 |
NBI report | INTERSTATE 710 | COMPTON CREEK | 07-LA-710-10.59-LBCH | Concrete Box beam or girders - Multiple (3 spans) | -- | 1953 | 1966 | 97.1 | 295.9 | Good | 83.0 | 53 0817 |
NBI report | INTERSTATE 710 | DEL AMO BLVD | 07-LA-710-10.82-LBCH | Concrete Tee beam | -- | 1953 | 1966 | 80.1 | 85.3 | Good | 68.5 | 53 0818 |
NBI report | ANAHEIM ST | LONG BEACH FREEWAY | 0.1MI W/O I-710 FWY | Steel Stringer/Multi-beam or girder (2 spans) | -- | 1954 | -- | 79.1 | 160.1 | Poor | 68.3 | 53C0885 |
NBI report | LOS COYOTES DIAG | LOS CERRITOS DRN CH | 150FT S/O SPRING ST | Concrete Slab (4 spans) | -- | 1954 | -- | 31.5 | 118.1 | Fair | 92.3 | 53C0214 |
NBI report | STEARNS ST | LOS CERRITOS DRA CHA | 0.3MI W/O STUDEBAKER RD | Concrete Slab (5 spans) | -- | 1954 | -- | 28.5 | 134.8 | Fair | 91.2 | 53C0634 |
NBI report | WILLOW ST | LOS CERITOS DRN | 400FT W/O PALO VERDE AVE | Concrete Slab (5 spans) | -- | 1954 | 1966 | 40.0 | 190.0 | Fair | 66.4 | 53C0215 |
NBI report | CLARK AVE | LOS CERRITOS DRN CHAN | 100FT S/O SPRING ST | Concrete Slab (3 spans) | -- | 1954 | 1977 | 28.2 | 75.8 | Fair | 74.1 | 53C0218 |
NBI report Bridgehunter | LACTC ACCESS RD | ROUTE 710 | 07-LA-710-10.31-LBCH | Steel Girder and floorbeam system (2 spans) | -- | 1954 | 1989 | 127.3 | 256.9 | Fair | 50.2 | 53 0815 |
NBI report | 2ND ST | MARINE STAD / APPIAN | 0.3MI W/O SR-1 HWY | Steel Stringer/Multi-beam or girder (7 spans) | -- | 1955 | -- | 125.0 | 799.9 | Poor | 64.8 | 53C0209 |
NBI report | BELLFLOWER BLVD | BOUTON CRK | 0.1MI S/O ATHERTON ST | Concrete Culvert (2 spans) | -- | 1955 | -- | 18.7 | 38.1 | Good | 89.4 | 53C0009 |
NBI report | LOS COYOTES DIAG | LOS CERRITOS LINE E CHAN | 0.3MI N/O SPRING ST | Concrete Slab (2 spans) | -- | 1955 | -- | 23.0 | 44.0 | Fair | 93.4 | 53C0630 |
NBI report | SPRING ST | LOS CERRITOS DRN CHANN | 0.3MI W/O BELLFLOWER BLVD | Concrete Culvert (5 spans) | -- | 1955 | -- | 13.1 | 68.2 | Good | 67.3 | 53C0728 |
NBI report | WARDLOW RD | COYOTE CRK | 0.8MI E/O I-605 FWY | Steel Stringer/Multi-beam or girder (4 spans) | -- | 1955 | -- | 70.9 | 294.0 | Fair | 89.5 | 53C0628 |
NBI report | STATE ROUTE 22 | LOS CERRITOS CHANNEL | 07-LA-022-1.09-LBCH | Concrete Tee beam (5 spans) | -- | 1955 | 2000 | 37.1 | 188.0 | Good | 71.5 | 53 0215R |
NBI report | 6TH ST OFF RAMP | SAN FRANCISCO / GOLDEN | 0.2MI W/O MAGNOLIA AVE | Steel Stringer/Multi-beam or girder (14 spans) | -- | 1956 | -- | 85.0 | 911.1 | Fair | 77.0 | 53C0934 |
NBI report | 7TH ST ON RAMP | RTD PARKING LOT UC | 0.4MI W/O MAGNOLIA AVE | Steel Stringer/Multi-beam or girder (2 spans) | -- | 1956 | -- | 70.9 | 137.1 | Poor | 79.3 | 53C0933 |
NBI report | ATHERTON ST | LOS CERRITOS CHAN | 0.3MI W/O STUDEBAKER RD | Concrete Tee beam (5 spans) | -- | 1956 | -- | 27.2 | 130.9 | Poor | 86.6 | 53C0211 |
NBI report | BELLFLOWER BLVD | LOS CERRITOS DR CHAN | 50FT S/O SPRING ST | Concrete Culvert (4 spans) | -- | 1956 | -- | 19.0 | 81.0 | Fair | 63.7 | 53C0452 |
NBI report | PALO VERDE AVE | LOS CERITOS DRN CHAN | 250FT S/O WILLOW ST | Concrete Slab (5 spans) | -- | 1956 | -- | 33.1 | 159.1 | Fair | 78.6 | 53C0216 |
NBI report | 10TH ST OFF RAMP | 710 FWY,HB SC DR,10TH ST | 0.3MI S/O ANAHEIM ST | Steel Stringer/Multi-beam or girder (20 spans) | -- | 1957 | -- | 127.0 | 1284.2 | Fair | 62.0 | 53C0931 |
NBI report | MRTN L KING JR AVE | SPTCO | 0.7MI N/O SR-1 HWY | Prestressed Stringer/Multi-beam or girder (2 spans) | -- | 1957 | -- | 53.2 | 110.9 | Poor | 79.5 | 53C0864 |
NBI report | STATE ROUTE 1 | LOS ANGELES RIVER | 07-LA-001-7.11-LBCH | Concrete Box beam or girders - Multiple (7 spans) | -- | 1957 | -- | 94.2 | 625.0 | Good | 87.1 | 53 0341 |
NBI report | STATE ROUTE 1 | DE FOREST AVENUE | 07-LA-001-7.08-LBCH | Concrete Box beam or girders - Multiple (2 spans) | -- | 1957 | -- | 59.1 | 113.9 | Good | 80.3 | 53 1047 |
NBI report | BROADWAY | SHORELINE DR | 0.3MI W/O MAGNOLIA | Prestressed Box beam or girders - Multiple (3 spans) | -- | 1958 | -- | 54.1 | 140.1 | Good | 91.3 | 53C0832 |
NBI report | DEL AMO BLVD | LOS ANGELES RIV | 0.1MI E/O I-710 FWY | Steel Stringer/Multi-beam or girder (6 spans) | -- | 1958 | -- | 69.9 | 421.9 | Fair | 85.8 | 53C0647 |
NBI report | WARDLOW RD | PALO VERDE DRN | 50FT W/O LOS COYOTES DIAG | Concrete Culvert (2 spans) | -- | 1958 | -- | 14.8 | 29.9 | Good | 75.3 | 53C0729 |
NBI report | WOODRUFF AVE | LOS CERRITOS DRN CHANN | 0.4MI N/O I-405 FWY | Concrete Culvert (4 spans) | -- | 1958 | -- | 27.9 | 110.2 | Fair | 96.2 | 53C0820 |
NBI report | ATHERTON ST | STORM DRN ##133 | 30FT W/O CLARK AVE | Concrete Culvert (2 spans) | -- | 1959 | -- | 11.2 | 24.0 | Good | 95.0 | 53C0236 |
NBI report | CLARK AVE | BOUTON CRK | 0.1MI S/O ATHERTON ST | Concrete Culvert (3 spans) | -- | 1959 | -- | 11.2 | 34.5 | Good | 76.9 | 53C0237 |
NBI report | OCEAN BLVD | RR,HRB SC DR,LA RV,SHLND | 0.1MI E/O PICO AVE | Steel Stringer/Multi-beam or girder (10 spans) | -- | 1959 | -- | 146.0 | 1206.1 | Fair | 67.8 | 53C0927 |
NBI report | STUDEBAKER RD | ROUTE 22 | 07-LA-022-1.14-LBCH | Prestressed Stringer/Multi-beam or girder (2 spans) | -- | 1959 | -- | 68.2 | 245.4 | Good | 60.5 | 53 1427 |
NBI report | W SHORELINE DRIVE | LA RIV,UP,HARBOR SCENIC | 0.2MI S/O ANAHEIM ST | Steel Stringer/Multi-beam or girder (10 spans) | -- | 1959 | -- | 129.9 | 1073.2 | Fair | 71.5 | 53C0932 |
NBI report | STATE ROUTE 1 | ALAMITOS BAY | 07-LA-001-0.98-LBCH | Concrete Slab (19 spans) | -- | 1959 | 1967 | 42.0 | 404.9 | Good | 93.7 | 53 0064 |
NBI report | STATE ROUTE 22 | LOS CERRITOS CHANNEL | 07-LA-022-1.09-LBCH | Concrete Tee beam (5 spans) | -- | 1959 | 2000 | 37.1 | 188.0 | Good | 62.9 | 53 0215L |
NBI report | STATE ROUTE 22 | SAN GABRIEL RIVER | 07-LA-022-1.42-LBCH | Concrete Slab (8 spans) | -- | 1959 | 2000 | 49.9 | 334.0 | Good | 92.8 | 53 0302L |
NBI report | 9TH ST | 10ST RMP,10ST,HRB SC DR | 0.5MI E/O SANTA FE AVE | Steel Stringer/Multi-beam or girder (8 spans) | -- | 1960 | -- | 115.2 | 659.2 | Poor | 89.6 | 53C0930 |
NBI report | APPIAN WAY | ALAMITOS BAY | 0.2MI N/O 2ND ST | Steel Stringer/Multi-beam or girder (7 spans) | -- | 1960 | -- | 57.1 | 401.9 | Poor | 77.5 | 53C1589 |
NBI report | N405-LAKEWOOD OFF | LAKEWOOD BLVD | 07-LA-405-3.30-LBCH | Prestressed Stringer/Multi-beam or girder (2 spans) | -- | 1960 | -- | 69.9 | 198.2 | Good | 70.8 | 53 1196G |
NBI report | I 405 & COLLECTOR | ROUTE 710 & RAMPS | 07-LA-405-7.57-LBCH | Prestressed Tee beam (2 spans) | -- | 1961 | -- | 61.0 | 280.9 | Good | 81.0 | 53 1210 |
NBI report | I-710 FWY | 7TH ST W ON RAMP | 0.2MI N/O BROADWAY | Concrete Slab | -- | 1961 | -- | 42.7 | 55.1 | Good | 91.4 | 53C0903 |
NBI report | INTERSTATE 405 | CASPIAN AVE STORM DRAIN | 07-LA-405-7.95-LBCH | Concrete Culvert (4 spans) | -- | 1961 | -- | 7.9 | 36.1 | Good | 82.0 | 53 0361 |
NBI report | N405-S710 CONN OC | S405-S710 CONNECTOR RAMP | 07-LA-405-7.55-LBCH | Concrete Box beam or girders - Multiple (3 spans) | -- | 1961 | -- | 69.9 | 178.2 | Fair | 91.9 | 53 1420G |
NBI report | OCEAN BLVD | PICO AVE | 0.1MI W/O HARBOR SCENIC D | Steel Stringer/Multi-beam or girder | -- | 1961 | -- | 126.0 | 131.9 | Fair | 82.1 | 53C0884 |
NBI report | S405-N710 CONN | SANTA FE AVE | 07-LA-405-8.06-LBCH | Concrete Tee beam (4 spans) | -- | 1961 | -- | 60.0 | 202.1 | Good | 91.2 | 53 1212F |
NBI report | S405-N710/710 SEP | ROUTE 710 & CONNECTORS | 07-LA-405-7.66-LBCH | Concrete Box beam or girders - Multiple (6 spans) | -- | 1961 | -- | 117.1 | 605.0 | Good | 69.1 | 53 1422F |
NBI report | S710-S405 CONNECTR | ROUTE 710 & CONNECTORS | 07-LA-710-9.38-LBCH | Prestressed Stringer/Multi-beam or girder (2 spans) | -- | 1961 | -- | 58.1 | 276.9 | Good | 70.9 | 53 1284F |
NBI report | SANTA FE BLD-S405 | CASPIAN AVE STORM DRAIN | 07-LA-405-7.95-LBCH | Concrete Culvert (4 spans) | -- | 1961 | -- | 7.9 | 33.1 | Good | 92.7 | 53 0361F |
NBI report | WARDLOW RD-S405 | I 710 & CONNECTOR RAMPS | 07-LA-405-7.57-LBCH | Concrete Tee beam (6 spans) | -- | 1961 | -- | 59.1 | 274.0 | Good | 91.9 | 53 1210K |
NBI report | SPRING ST | PALO VERDE DRN | 50FT E/O WOODRUFF AVE | Concrete Culvert (2 spans) | -- | 1961 | 1976 | 27.2 | 33.1 | Good | 72.8 | 53C0835 |
NBI report | INTERSTATE 405 | 223RD STREET OH | 07-LA-405-8.19-LBCH | Prestressed Slab (3 spans) | -- | 1961 | 1998 | 46.9 | 143.1 | Good | 85.0 | 53 1165 |
NBI report | INTERSTATE 405 | MC HELEN AVE | 07-LA-405-8.45-LBCH | Concrete Tee beam (3 spans) | -- | 1961 | 1998 | 63.0 | 117.1 | Good | 79.0 | 53 1169 |
NBI report | INTERSTATE 405 | SANTA FE AVE | 07-LA-405-8.06-LBCH | Concrete Tee beam (4 spans) | -- | 1961 | 1998 | 60.0 | 202.1 | Fair | 62.4 | 53 1212 |
NBI report | SPRING STREET | INTERSTATE 405 | 07-LA-405-4.53-LBCH | Concrete Box beam or girders - Multiple (2 spans) | -- | 1962 | -- | 168.0 | 345.2 | Good | 91.9 | 53 1199 |
NBI report | WARDLOW RD | LOS CERRITOS DRN CH | 0.3MI E/O CLARK AVE | Concrete Culvert (4 spans) | -- | 1962 | -- | 11.5 | 47.9 | Good | 95.8 | 53C0221 |
NBI report | WILLOW ST | SAN GABRIEL RIV | 0.5MI W/O I-605 FWY | Prestressed Stringer/Multi-beam or girder (4 spans) | -- | 1962 | -- | 65.0 | 268.4 | Good | 93.3 | 53C0265 |
NBI report | WILLOW ST | COYOTE CRK | 0.1MI W/O I-605 FWY | Prestressed Stringer/Multi-beam or girder (4 spans) | -- | 1962 | -- | 66.9 | 270.0 | Fair | 92.3 | 53C0266 |
NBI report | WILLOW ST | W ACCESS RD UC | 0.5MI W/O I-605 FWY | Concrete Slab | -- | 1962 | -- | 40.0 | 43.3 | Poor | 63.9 | 53C0281 |
NBI report | WILLOW ST | EDISON ACCESS RD UC | 0.3MI W/O I-605 FWY | Concrete Slab | -- | 1962 | -- | 40.0 | 44.0 | Fair | 80.8 | 53C0282 |
NBI report | ARBOR RD | LOS CERRITOS DRN CHAN | 0.4MI W/O BELLFLOWER BLVD | Concrete Culvert (3 spans) | -- | 1963 | -- | 10.2 | 31.8 | Good | 96.9 | 53C0229 |
NBI report | ATLANTIC AVENUE | ROUTE 405 | 07-LA-405-6.08-LBCH | Concrete Box beam or girders - Multiple (4 spans) | -- | 1963 | -- | 90.9 | 253.0 | Good | 94.4 | 53 1204 |
NBI report | CENTRALIA ST | LOS CERITOS DRN | 0.4MI W/O BELLFLOWER BLVD | Concrete Culvert (2 spans) | -- | 1963 | -- | 12.1 | 24.9 | Good | 95.6 | 53C1588 |
NBI report | CLARK AVE | KEYNOTE ST LATERAL | 0.6MI S/O CARSON ST | Concrete Culvert (2 spans) | -- | 1963 | -- | 11.2 | 23.0 | Good | 94.9 | 53C0725 |
NBI report | CONANT ST | LOS CERRITOS DRN CH | 0.2MI W/O BELLFLOWER BLVD | Concrete Culvert (3 spans) | -- | 1963 | -- | 10.8 | 34.1 | Fair | 96.5 | 53C0220 |
NBI report | HARVEY WAY | LOS CERRITOS DRN CHAN | 0.4MI W/O BELLFLOWER BLVD | Concrete Culvert (2 spans) | -- | 1963 | -- | 12.1 | 24.9 | Good | 95.8 | 53C0227 |
NBI report | INTERSTATE 405 | BELLFLOWER BLVD | 07-LA-405-2.18-LBCH | Concrete Box beam or girders - Multiple (9 spans) | -- | 1963 | -- | 105.0 | 586.0 | Good | 82.0 | 53 1194 |
NBI report | INTERSTATE 405 | BLUE LINE LRT,PACIFIC PL | 07-LA-405-6.98-LBCH | Concrete Box beam or girders - Multiple (5 spans) | -- | 1963 | -- | 151.9 | 549.9 | Good | 85.0 | 53 1208 |
NBI report | INTERSTATE 405 | LOS ANGELES RIVER | 07-LA-405-7.40-LBCH | Steel Stringer/Multi-beam or girder (8 spans) | -- | 1963 | -- | 102.0 | 695.9 | Good | 68.0 | 53 1209 |
NBI report | INTERSTATE 405 | WILLOW STREET | 07-LA-405-3.01-LBCH | Concrete Box beam or girders - Multiple (4 spans) | -- | 1963 | -- | 102.0 | 315.0 | Good | 81.0 | 53 1480 |
NBI report | MONLACO RD | LOS CERRITOS DRN | 0.2MI W/O BELLFLOWER BLVD | Concrete Culvert (4 spans) | -- | 1963 | -- | 11.5 | 47.9 | Fair | 96.9 | 53C1587 |
NBI report | N&S710-S405 CONNEC | S405-PACIFIC PL OFF-RAMP | 07-LA-710-9.20-LBCH | Concrete Box beam or girders - Multiple (3 spans) | -- | 1963 | -- | 92.9 | 246.1 | Good | 92.7 | 53 1473H |
NBI report | N405 - N710 CONN | LOS ANGELES RIVER | 07-LA-405-7.40-LBCH | Steel Stringer/Multi-beam or girder (8 spans) | -- | 1963 | -- | 200.1 | 811.1 | Good | 69.5 | 53 1209G |
NBI report | N405-BELLFLOWER BL | LOS COYOTES DIAGONAL | 07-LA-405-2.16-LBCH | Concrete Box beam or girders - Multiple (6 spans) | -- | 1963 | -- | 102.0 | 446.9 | Good | 70.1 | 53 1193S |
NBI report | N405-N710 CONNECTO | APPIAN WAY-N405 ON-RAMP | 07-LA-405-7.20-LBCH | Concrete Box beam or girders - Multiple (3 spans) | -- | 1963 | -- | 60.0 | 129.9 | Good | 83.9 | 53 1476G |
NBI report | NB BELLFLOWER-N405 | BELLFLOWER UC | 07-LA-405-2.25-LBCH | Concrete Box beam or girders - Multiple (6 spans) | -- | 1963 | -- | 97.1 | 408.2 | Good | 74.9 | 53 1194S |
NBI report | RAMP/CONNECTOR 710 | LOS ANGELES RIVER | 07-LA-710-9.30-LBCH | Steel Stringer/Multi-beam or girder (8 spans) | -- | 1963 | -- | 107.0 | 779.2 | Fair | 70.5 | 53 1209H |
NBI report | ROUTE 405 | PALO VERDE AVE | 07-LA-405-1.11-LBCH | Concrete Box beam or girders - Multiple (4 spans) | -- | 1963 | -- | 90.9 | 257.9 | Good | 81.0 | 53 1190 |
NBI report | ROUTE 405 | WOODRUFF AVE | 07-LA-405-1.64-LBCH | Concrete Box beam or girders - Multiple (3 spans) | -- | 1963 | -- | 74.2 | 160.1 | Good | 83.0 | 53 1191 |
NBI report | ROUTE 405 | CLARK AVE | 07-LA-405-2.76-LBCH | Prestressed Stringer/Multi-beam or girder (2 spans) | -- | 1963 | -- | 53.2 | 173.9 | Good | 58.6 | 53 1195 |
NBI report | WARDLOW RD | SAN GABRIEL RIV | 0.8MI W/O I-605 FWY | Prestressed Stringer/Multi-beam or girder (2 spans) | -- | 1963 | -- | 73.2 | 155.2 | Fair | 93.3 | 53C0726 |
NBI report | WARDLOW RD | EL DORADO PARK E ACSS RD | 0.8MI W/O I-605 FWY | Prestressed Slab | -- | 1963 | -- | 36.1 | 39.0 | Fair | 89.0 | 53C0727 |
NBI report | WARDLOW RD | NORWALK DRN CHAN | 0.5MI S/O I-605 FWY | Concrete Culvert (3 spans) | -- | 1963 | -- | 12.1 | 38.4 | Good | 95.3 | 53C0818 |
NBI report | INTERSTATE 405 | STUDEBAKER ROAD | 07-LA-405-0.45-LBCH | Concrete Box beam or girders - Multiple (4 spans) | -- | 1963 | 1992 | 81.0 | 257.9 | Good | 83.0 | 53 1187 |
NBI report | INTERSTATE 405 | LOS CERRITOS CHANNEL | 07-LA-405-0.78-LBCH | Concrete Tee beam (5 spans) | -- | 1963 | 1992 | 38.1 | 214.9 | Good | 78.0 | 53 1188 |
NBI report | INTERSTATE 405 | STEARNS STREET | 07-LA-405-0.96-LBCH | Concrete Tee beam (4 spans) | -- | 1963 | 1996 | 63.0 | 230.0 | Good | 75.3 | 53 1189 |
NBI report | INTERSTATE 405 | LONG BEACH BLVD | 07-LA-405-6.34-LBCH | Concrete Box beam or girders - Multiple (4 spans) | -- | 1963 | 1996 | 69.9 | 233.0 | Good | 92.0 | 53 1205 |
NBI report | INTERSTATE 405 | WARDLOW ROAD | 07-LA-405-6.50-LBCH | Concrete Box beam or girders - Multiple (2 spans) | -- | 1963 | 1996 | 55.1 | 113.9 | Good | 62.0 | 53 1206 |
NBI report | INTERSTATE 405 | PACIFIC AVENUE | 07-LA-405-6.70-LBCH | Concrete Box beam or girders - Multiple (3 spans) | -- | 1963 | 1996 | 111.9 | 204.1 | Good | 85.0 | 53 1207 |
NBI report | 2ND ST (EB) | SAN GABRIEL RIV | 0.8MI E/O SR-1 HWY | Prestressed Stringer/Multi-beam or girder (5 spans) | -- | 1964 | -- | 71.9 | 255.9 | Poor | 87.5 | 53C0283R |
NBI report | 2ND ST (EB) | HAYNES STEAM PLANT CH | 0.9MI E/O SR-1 HWY | Prestressed Stringer/Multi-beam or girder (4 spans) | -- | 1964 | -- | 63.0 | 255.9 | Poor | 87.4 | 53C0284R |
NBI report | 2ND ST (WB) | SAN GABRIEL RIV | 0.8MI E/O SR-1 HWY | Prestressed Stringer/Multi-beam or girder (5 spans) | -- | 1964 | -- | 71.9 | 360.9 | Poor | 87.9 | 53C0283L |
NBI report | 2ND ST (WB) | HAYNES STEAM PLANT CH | 0.9MI E/O SR-1 HWY | Prestressed Stringer/Multi-beam or girder (4 spans) | -- | 1964 | -- | 255.9 | 255.9 | Poor | 87.4 | 53C0284L |
NBI report | CHERRY AVE OFF RMP | ROUTE 405 NB ON-RAMP | 07-LA-405-5.01-LBCH | Concrete Box beam or girders - Multiple (4 spans) | -- | 1964 | -- | 95.1 | 310.1 | Poor | 72.0 | 53 1573K |
NBI report | CHERRY AVENUE | ROUTE 405 | 07-LA-405-4.88-LBCH | Concrete Box beam or girders - Multiple (4 spans) | -- | 1964 | -- | 107.0 | 373.0 | Good | 94.0 | 53 1200 |
NBI report | COLLEGE PARK DR | SAN GABRIEL RIV | 0.3MI E/O STUDEBAKER RD | Concrete Tee beam (8 spans) | -- | 1964 | -- | 49.9 | 360.9 | Fair | 61.4 | 53C0139 |
NBI report | INTERSTATE 405 | SAN GABRIEL RIVER | 07-LA-405-0.03-LBCH | Concrete Box beam or girders - Multiple (5 spans) | -- | 1964 | -- | 83.0 | 390.1 | Good | 66.0 | 53 1185 |
NBI report | INTERSTATE 405 | LAKEWOOD BLVD | 07-LA-405-3.30-LBCH | Prestressed Stringer/Multi-beam or girder (4 spans) | -- | 1964 | -- | 66.9 | 235.9 | Good | 82.0 | 53 1196 |
NBI report | LAKEWOOD-N405 ON | N405-LAKEWOOD BL OFFRAMP | 07-LA-405-3.20-LBCH | Concrete Tee beam (3 spans) | -- | 1964 | -- | 54.1 | 136.2 | Good | 88.0 | 53 1481G |
NBI report | N405-SB N LAKEWOOD | WILLOW STREET | 07-LA-405-2.30-LBCH | Concrete Box beam or girders - Multiple (3 spans) | -- | 1964 | -- | 110.9 | 241.2 | Fair | 88.1 | 53 1577S |
NBI report | ORANGE AVE OFF RMP | RTE 405 ON-RAMP | 07-LA-405-4.99-LBCH | Concrete Box beam or girders - Multiple (4 spans) | -- | 1964 | -- | 87.9 | 293.0 | Good | 72.6 | 53 1574S |
NBI report | S405-LAKEWOOD-S405 | VEHICLE ACCESS | 07-LA-405-3.46-LBCH | Concrete Box beam or girders - Multiple | -- | 1964 | -- | 16.1 | 20.0 | Good | 87.7 | 53 1619E |
NBI report | TEMPLE AVE | INTERSTATE 405 | 07-LA-405-4.33-LBCH | Concrete Box beam or girders - Multiple (2 spans) | -- | 1964 | -- | 106.0 | 195.9 | Good | 87.4 | 53 1198 |
NBI report | WALNUT AVENUE | ROUTE 405 | 07-LA-405-5.14-LBCH | Concrete Box beam or girders - Multiple (4 spans) | -- | 1964 | -- | 95.1 | 328.1 | Poor | 84.1 | 53 1201 |
NBI report | INTERSTATE 405 | ATHERTON STREET | 07-LA-405-0.27-LBCH | Concrete Box beam or girders - Multiple (3 spans) | -- | 1964 | 1992 | 101.1 | 199.2 | Good | 84.0 | 53 1186 |
NBI report | INTERSTATE 405 | REDONDO AVENUE | 07-LA-405-3.82-LBCH | Concrete Box beam or girders - Multiple (3 spans) | -- | 1964 | 1995 | 84.0 | 160.1 | Good | 81.0 | 53 1197 |
NBI report | SPRING STREET | INTERSTATE 605 | 07-LA-605-R0.29-LBCH | Concrete Box beam or girders - Multiple (4 spans) | -- | 1965 | -- | 95.8 | 253.9 | Good | 85.3 | 53 1723 |
NBI report | LOYNES DR | LOS CERRITOS DRA CHA | 300FT W/O STUDEBAKER RD | Prestressed Stringer/Multi-beam or girder (3 spans) | -- | 1966 | -- | 85.0 | 265.1 | Fair | 79.1 | 53C0730 |
NBI report | RAMP/CONNECTOR 405 | SAN GABRIEL RIVER | 07-LA-405-0.02-LBCH | Concrete Box beam or girders - Multiple (5 spans) | -- | 1966 | -- | 78.1 | 372.1 | Fair | 55.8 | 53 1737H |
NBI report | STUDEBAKER RD N/B | S C EDISON N CHAN | 350FT N/O LOYNES DRIVE | Prestressed Stringer/Multi-beam or girder (2 spans) | -- | 1966 | -- | 69.9 | 145.0 | Poor | 82.8 | 53C0801R |
NBI report | STUDEBAKER RD N/B | S CAL EDISON S CHAN | 300FT S/O LOYNES DRIVE | Prestressed Stringer/Multi-beam or girder (2 spans) | -- | 1966 | -- | 84.0 | 171.9 | Fair | 74.5 | 53C0802R |
NBI report | STUDEBAKER RD S/B | S C EDISON N CHAN | 350FT N/O LOYNES DRIVE | Prestressed Stringer/Multi-beam or girder (2 spans) | -- | 1966 | -- | 69.9 | 145.0 | Fair | 86.9 | 53C0801L |
NBI report | STUDEBAKER RD S/B | S C EDISON S CHAN | 300FT S/O LOYNES DRIVE | Prestressed Stringer/Multi-beam or girder (2 spans) | -- | 1966 | -- | 84.0 | 171.9 | Fair | 86.9 | 53C0802L |
NBI report | WARDLOW RD | INTERSTATE 605 | 07-LA-605-R0.79-LBCH | Prestressed Stringer/Multi-beam or girder (2 spans) | -- | 1966 | -- | 92.5 | 185.0 | Good | 87.7 | 53 1850 |
NBI report | 2ND ST | ALAMITOS BAY CHAN | 1.3MI W/O SR-1 HWY | Prestressed Stringer/Multi-beam or girder (7 spans) | -- | 1967 | -- | 51.8 | 337.0 | Poor | 74.1 | 53C0028 |
NBI report | QUEENS WAY NB | HARBOR SCENIC DR | 0.1MI E/O HARBOR PLZ | Concrete Box Beam or girders - Single or Spread (4 spans) | -- | 1967 | -- | 109.9 | 392.1 | Fair | 83.2 | 53C0889 |
NBI report | QUEENS WAY NBND | SHORELN DR / SEASIDE P | 0.1MI S/O OCEAN BLVD | Concrete Box Beam or girders - Single or Spread (10 spans) | -- | 1967 | -- | 101.1 | 679.5 | Good | 77.0 | 53C0892R |
NBI report | QUEENS WAY SBND | SHORELN DR / SEASIDE P | 0.1MI S/O OCEAN BLVD | Concrete Box Beam or girders - Single or Spread (10 spans) | -- | 1967 | -- | 101.1 | 659.5 | Good | 89.5 | 53C0892L |
NBI report | QUEENS WAY-SBND | HARBOR SCENIC DR | 0.6MI S/O OCEAN BLVD | Concrete Box Beam or girders - Single or Spread (5 spans) | -- | 1967 | -- | 115.2 | 439.0 | Good | 76.2 | 53C0890L |
NBI report | QUEENS WAY-SBND | HARBOR SCENIC DR | 0.6MI S/O OCEAN BLVD | Concrete Box Beam or girders - Single or Spread (4 spans) | -- | 1967 | -- | 115.2 | 421.9 | Fair | 76.2 | 53C0890R |
NBI report | THE TOLEDO E | RIVO ALTO CANAL | 0.1MI E/O RAVENNA DR | Concrete Tee beam | -- | 1967 | -- | 66.9 | 75.1 | Fair | 58.3 | 53C0022 |
NBI report | THE TOLEDO, W | RIVO ALTO CANAL | 0.2MI W/O RAVENNA DR | Concrete Tee beam | -- | 1967 | -- | 68.9 | 76.1 | Fair | 58.2 | 53C0023 |
NBI report | NEOPOLITAN LN E | RIVO ALTO CANAL | 400FT S/O THE TOLEDO E | Concrete Tee beam | -- | 1968 | -- | 67.9 | 76.1 | Fair | 63.0 | 53C0025 |
NBI report Bridgehunter | OCEAN BLVD | ENTRANCE CHAN, SPTCO | 0.9MI E/O SR-47 FWY | Steel Arch - Thru (3 spans) | -- | 1968 | -- | 526.9 | 6074.8 | Fair | 50.6 | 53C0065 |
NBI report | HARBOR SCENIC DR | OIL PIPELINES | 0.1MI S/O PANORAMA DR | Steel Arch - Deck | -- | 1969 | -- | 24.0 | 24.9 | Good | 83.3 | 53C1943 |
NBI report | QUEENS HWY S | HARBOR PLAZA | 0.7MI W/O PICO AVE | Concrete Box Beam or girders - Single or Spread (3 spans) | -- | 1969 | -- | 98.1 | 183.1 | Fair | 90.8 | 53C1590 |
NBI report | QUEENS WAY N | QUEENSWAY DR / LA RIV | 0.6MI S/O OCEAN BLVD | Steel Box Beam or girders - Single or Spread (3 spans) | -- | 1969 | -- | 500.0 | 1310.1 | Fair | 63.5 | 53C0551R |
NBI report | QUEENS WAY S | QUEENSWAY DR / LA RIV | 0.6MI S/O OCEAN BLVD | Steel Box Beam or girders - Single or Spread (3 spans) | -- | 1969 | -- | 500.0 | 1310.1 | Fair | 78.9 | 53C0551L |
NBI report | WINDSOR WAY | QUEEN MARY PRK LOT EXIT | 0.3MI S/O HARBOR PLZ | Concrete Frame (2 spans) | -- | 1969 | -- | 19.7 | 38.7 | Fair | 95.7 | 53C1592 |
NBI report | GOLDEN SHORE BLVD | SHORELINE DR | 0.1MI S/O OCEAN BLVD | Concrete Box beam or girders - Multiple (3 spans) | -- | 1970 | -- | 74.2 | 200.1 | Good | 93.6 | 53C0817 |
NBI report | HARBOR SCENIC DR | VACANT LAND | 07-LA-710-5.95-LBCH | Concrete Box beam or girders - Multiple (7 spans) | -- | 1970 | -- | 76.1 | 388.1 | Fair | 87.8 | 53 2934 |
NBI report | HARBOR SCENIC DR S | HARBOR SCENIC DR NB RAMP | 1.0MI S/O OCEAN BLVD | Concrete Box Beam or girders - Single or Spread (4 spans) | -- | 1970 | -- | 64.0 | 203.1 | Poor | 73.2 | 53C0823 |
NBI report | STATE ROUTE 91 | DOWNEY AVE | 07-LA-091-R14.10-LBCH | Prestressed Box beam or girders - Multiple | -- | 1970 | -- | 153.9 | 153.9 | Good | 84.0 | 53 1761 |
NBI report | STATE ROUTE 91 | UP RR | 07-LA-091-R13.35-LBCH | Concrete Box beam or girders - Multiple (3 spans) | -- | 1970 | -- | 63.0 | 137.1 | Good | 84.3 | 53 2101 |
NBI report | STATE ROUTE 91 | MYRTLE AVE | 07-LA-091-R12.34-LBCH | Prestressed Box beam or girders - Multiple | -- | 1970 | -- | 106.0 | 106.0 | Good | 85.0 | 53 2121 |
NBI report | STATE ROUTE 91 | ORANGE AVE | 07-LA-091-R12.59-LBCH | Prestressed Box beam or girders - Multiple | -- | 1970 | -- | 120.1 | 120.1 | Good | 85.0 | 53 2122 |
NBI report | STATE ROUTE 91 | CHERRY AVE | 07-LA-091-R13.09-LBCH | Prestressed Box beam or girders - Multiple (2 spans) | -- | 1970 | -- | 90.2 | 180.1 | Good | 82.0 | 53 2123 |
NBI report | STATE ROUTE 91 | ATLANTIC AVE | 07-LA-091-R12.09-LBCH | Concrete Box beam or girders - Multiple (2 spans) | -- | 1970 | -- | 78.1 | 158.1 | Good | 84.0 | 53 2124 |
NBI report | STATE ROUTE 91 | WALNUT AVE | 07-LA-091-R12.84-LBCH | Prestressed Box beam or girders - Multiple | -- | 1970 | -- | 113.9 | 113.9 | Good | 85.0 | 53 2127 |
NBI report | STATE ROUTE 91 | OBISPO AVE | 07-LA-091-R13.86-LBCH | Prestressed Box beam or girders - Multiple | -- | 1970 | -- | 111.9 | 115.2 | Good | 85.0 | 53 2128 |
NBI report | STATE ROUTE 91 | PARAMOUNT BLVD | 07-LA-091-R13.59-LBCH | Concrete Box beam or girders - Multiple (2 spans) | -- | 1970 | -- | 94.2 | 188.0 | Good | 82.0 | 53 2129 |
NBI report | ATLANTIC TO N71O | LOS ANGELES RIVER | 07-LA-710-13.09-LBCH | Prestressed Stringer/Multi-beam or girder (8 spans) | -- | 1971 | -- | 118.1 | 797.0 | Good | 72.7 | 53 2145S |
NBI report | ATLANTIC-W91 ONRMP | LOS ANGELES RIV,E91-N710 | 07-LA-091-R11.82-LBCH | Prestressed Box beam or girders - Multiple (10 spans) | -- | 1971 | -- | 119.4 | 1038.1 | Good | 75.0 | 53 2144K |
NBI report | S710-E91 CONNECTOR | ROUTES 710 & 91, L A RIV | 07-LA-710-13.03-LBCH | Prestressed Box beam or girders - Multiple (6 spans) | -- | 1971 | -- | 186.0 | 3349.9 | Good | 91.1 | 53 2142F |
NBI report | STATE ROUTE 91 | LOS ANGELES RIV,E91-N710 | 07-LA-091-R11.81-LBCH | Prestressed Stringer/Multi-beam or girder (9 spans) | -- | 1971 | -- | 124.7 | 940.0 | Good | 81.0 | 53 2142 |
NBI report | W91-S710, W91-N710 | I 710,N710-W91,E91-N710 | 07-LA-091-R11.70-LBCH | Steel Stringer/Multi-beam or girder (15 spans) | -- | 1971 | -- | 154.9 | 2114.6 | Good | 92.1 | 53 2143F |
NBI report | E91-N710 CONNECTOR | I 710, W91-S710,N710-E91 | 07-LA-091-R11.65-LBCH | Prestressed Stringer/Multi-beam or girder (4 spans) | -- | 1974 | -- | 103.0 | 379.9 | Good | 61.8 | 53 2241G |
NBI report | LONG BEACH BLVD | ROUTE 710 | 07-LA-710-12.01-LBCH | Prestressed Box beam or girders - Multiple (2 spans) | -- | 1974 | -- | 224.1 | 394.0 | Fair | 83.0 | 53 0819 |
NBI report | STATE ROUTE 91 | ARTESIA BL, BUTLER AV | 07-LA-091-R11.43-LBCH | Prestressed Box beam or girders - Multiple (10 spans) | -- | 1974 | -- | 172.9 | 521.0 | Good | 83.0 | 53 2169 |
NBI report | STATE ROUTE 91 | I 710, W91-S710,N710-W91 | 07-LA-091-R11.64-LBCH | Prestressed Stringer/Multi-beam or girder (3 spans) | -- | 1974 | -- | 122.1 | 364.2 | Good | 68.0 | 53 2240 |
NBI report | STATE ROUTE 91 | LONG BEACH BLVD | 07-LA-091-R11.10-LBCH | Prestressed Box beam or girders - Multiple | -- | 1974 | -- | 201.1 | 201.1 | Good | 82.0 | 53 2373 |
NBI report | NEOPOLITAN LN W | RIVO ALTO CANAL | 400FT S/O THE TOLEDO W | Concrete Tee beam | -- | 1976 | -- | 69.9 | 77.1 | Fair | 48.7 | 53C0026 |
NBI report | HARBOR PLZ DR W | UPRR | 200FT W/O PICO AVE | Prestressed Box beam or girders - Multiple (3 spans) | -- | 1981 | -- | 63.0 | 191.0 | Fair | 97.0 | 53C1727 |
NBI report | ANAHEIM RD | LOS CERRITOS DRN | 300FT W/O STUDEBAKER RD | Prestressed Slab (5 spans) | -- | 1984 | -- | 27.9 | 153.9 | Good | 72.5 | 53C0210 |
NBI report | E-N CONNECTOR | PICO AVE / OCEAN BLVD | 1.7MI E/O SR-103 FWY | Prestressed Box Beam or girders - Single or Spread (12 spans) | -- | 1990 | -- | 149.9 | 1641.2 | Poor | 90.9 | 53C2049 |
NBI report | INTERSTATE 405 SB | SB 405-STUDEBAKER OFFRMP | 07-LA-405-0.46-LBCH | Concrete Slab | -- | 1993 | -- | 15.1 | 261.5 | Good | 71.3 | 53 2768R |
NBI report | SB 405-STUDEBAKER | WOODRUFF AVE | 07-LA-405-0.66-LBCH | Concrete Slab (7 spans) | -- | 1993 | -- | 27.9 | 189.3 | Good | 78.4 | 53 2769K |
NBI report | HARBOR PLZ DR E | UPRR | 200FT W/O PICO AVE | Concrete Box Beam or girders - Single or Spread (3 spans) | -- | 1994 | -- | 87.6 | 240.2 | Fair | 91.0 | 53C2161 |
NBI report | INTERSTATE 405 | WARDLOW ROAD | 07-LA-405-6.50-LBCH | Concrete Stringer/Multi-beam or girder (4 spans) | -- | 1994 | -- | 84.0 | 164.1 | Good | 62.0 | 53 2784K |
NBI report | LONG BCH BLVD | SDBI 130 | 0.2MI S/O DEL AMO BLVD | Concrete Culvert (2 spans) | -- | 1994 | -- | 14.4 | 30.5 | Good | 94.9 | 53C2029 |
NBI report | PICO AV OFF-RMP OH | PICO AVE & UP RR | 07-LA-710-6.00-LBCH | Concrete Box beam or girders - Multiple | -- | 1994 | -- | 162.4 | 933.1 | Good | 95.5 | 53 2786K |
NBI report | PICO AV ON-RAMP OH | UP RR, I 710, PICO, 7TH | 07-LA-710-5.98-LBCH | Prestressed Box beam or girders - Multiple (10 spans) | -- | 1994 | -- | 171.9 | 1445.0 | Good | 97.5 | 53 2785S |
NBI report | PIER G AVE | UPRR | 250FT S/O HARBOR PLZ DR | Concrete Box Beam or girders - Single or Spread (3 spans) | -- | 1994 | -- | 71.9 | 183.7 | Fair | 99.0 | 53C2159 |
NBI report | PICO AVE | UPRR / HARBOR RR | 0.2MI S/O OCEAN BLVD | Prestressed Box Beam or girders - Single or Spread (5 spans) | -- | 1997 | -- | 213.9 | 1006.0 | Fair | 98.6 | 53C2172 |
NBI report | PIER J AVE E | S HARBOR SCENIC DR | 0.4MI S/O HARBOR PLZ | Concrete Box Beam or girders - Single or Spread (13 spans) | -- | 1997 | -- | 161.8 | 1607.0 | Fair | 93.0 | 53C2162 |
NBI report | S405-N710 CONN | I 405 & CONNECTORS | 07-LA-405-7.79-LBCH | Prestressed Box beam or girders - Multiple (4 spans) | -- | 1997 | -- | 184.1 | 588.0 | Good | 93.0 | 53 2780F |
NBI report | QUEENS WAY NB | QUEENS WAY S ON-RAMP | 0.1MI S/O SHORELINE DR | Concrete Box Beam or girders - Single or Spread (3 spans) | -- | 1998 | -- | 105.0 | 262.5 | Fair | 98.6 | 53C2160 |
NBI report | CARSON ST-N605 | N605-CARSON ST OFF-RAMP | 07-LA-605-R1.63-LBCH | Concrete Box beam or girders - Multiple (2 spans) | -- | 2001 | -- | 98.1 | 170.3 | Good | 97.0 | 53 2883S |
NBI report | SANTA FE AVE-S405 | S405-S710 RAMP | 07-LA-405-7.71-LBCH | Prestressed Box Beam or girders - Single or Spread | -- | 2001 | -- | 131.2 | 131.2 | Good | 96.6 | 53 2810K |
NBI report | MARINA DR | SAN GABRIEL RIV | 0.6MI S/O 2ND ST | Prestressed Box beam or girders - Multiple (4 spans) | -- | 2005 | -- | 105.0 | 393.7 | Fair | 90.6 | 53C1998 |