Carries | Crosses | Location | Design | Status | Year Built | Year Recon. | Span Len. | Total Len. | Condition | Suff. Rating | ID | |
---|---|---|---|---|---|---|---|---|---|---|---|---|
NBI report | CR 140 | ELM CREEK | 1.3 Mi. W. of CR. 107 | Concrete Girder and floorbeam system | -- | 1912 | -- | 49.9 | 54.5 | Poor | 51.7 | 242 |
NBI report | TWP 38 | ELM CREEK | 0.5 MI S OF JCT CSAH 44 | Concrete Girder and floorbeam system | NR eligible | 1913 | -- | 60.0 | 65.0 | Poor | 40.3 | 661 |
NBI report | TWP 69 | DITCH | 0.1 MI S OF JCT TH 4 | Concrete Girder and floorbeam system | -- | 1914 | -- | 29.9 | 33.1 | Fair | 47.3 | 932 |
NBI report Bridgehunter | PIONEER DR(MUN 36) | CHAN BTWN LAKES | 0.1 MI N OF JCT LAKE AVE | Concrete Slab (2 spans) | Closed | 1915 | -- | 21.7 | 44.9 | Poor | 32.4 | 1421 |
NBI report | TWP 67 | E FK DES MOINES RIVER | 0.1 MI N OF JCT CR. 122 | Concrete Girder and floorbeam system | -- | 1916 | -- | 49.9 | 54.1 | Fair | 63.1 | L7234 |
NBI report | TWP 165 | SOUTH CREEK | 0.3 MI S OF JCT CSAH 32 | Concrete Girder and floorbeam system | -- | 1918 | -- | 40.4 | 43.3 | Poor | 44.1 | L7227 |
NBI report | TWP 36 | ELM CREEK | 0.6 MI N OF JCT CR 142 | Concrete Girder and floorbeam system | -- | 1918 | -- | 49.9 | 55.1 | Fair | 65.4 | L7217 |
NBI report | TWP 40 | CENTER CREEK | 0.6 MI N OF JCT TH 90 | Concrete Girder and floorbeam system | -- | 1918 | -- | 40.0 | 44.0 | Poor | 32.3 | L7218 |
NBI report | TWP 58 | E FK DES MOINES RIVER | AT W CO LINE | Concrete Slab | -- | 1918 | -- | 24.0 | 25.9 | Good | 74.1 | L7229 |
NBI report | TWP 59 | STREAM | AT W CO LINE | Concrete Slab | -- | 1922 | -- | 24.0 | 25.6 | Poor | 54.1 | L7233 |
NBI report | CSAH 9 | S FK WATONWAN RIVER | 0.3 MI S OF JCT CSAH 54 | Concrete Girder and floorbeam system | -- | 1923 | -- | 29.9 | 33.1 | Fair | 74.2 | 4074 |
NBI report | TWP 329 | ELM CREEK | 2.8 MI W OF JCT CR. 107 | Concrete Girder and floorbeam system | -- | 1924 | -- | 29.5 | 32.5 | Poor | 30.1 | L7231 |
NBI report | TWP 329 | ELM CREEK | 2.3 MI W OF JCT CR. 107 | Concrete Girder and floorbeam system | -- | 1925 | -- | 35.4 | 39.4 | Poor | 55.3 | L7232 |
NBI report | CR 150 | CEDAR RUN | 1.6 MI W OF JCT CSAH 9 | Concrete Culvert (2 spans) | -- | 1927 | -- | 12.5 | 26.2 | Good | 97.0 | 89366 |
NBI report | CSAH 54 | S FK WATONWAN RIVER | 0.4 MI E OF JCT CSAH 9 | Concrete Culvert (3 spans) | -- | 1929 | -- | 10.5 | 33.1 | Fair | 92.8 | 90329 |
NBI report Bridgehunter | CSAH 53 | CENTER CREEK | 0.6 MI S OF GRANADA | Concrete Arch - Deck | -- | 1930 | -- | 45.9 | 63.0 | Poor | 62.5 | 1925 |
NBI report | TWP 200 | E FK DES MOINES RIVER | 0.9 MI E OF JCT CSAH 13 | Concrete Girder and floorbeam system | -- | 1931 | -- | 40.0 | 42.3 | Poor | 24.4 | L7275 |
NBI report | TH 4 | DITCH | 0.4 MI N OF IOWA ST LINE | Concrete Culvert (2 spans) | -- | 1937 | -- | 12.5 | 27.9 | Fair | 83.6 | 3572 |
NBI report | TWP 188 | CO DITCH # 1 | 1.5 MI E OF JCT CSAH 7 | Concrete Girder and floorbeam system (2 spans) | -- | 1938 | -- | 12.1 | 26.2 | Poor | 44.2 | 934 |
NBI report | CR 107 | STREAM | 1.5 MI N OF JCT CSAH 8 | Concrete Culvert (2 spans) | -- | 1940 | -- | 10.5 | 23.0 | Good | 94.8 | 89385 |
NBI report | MEM PK DR (MUN 36) | CENTER CREEK | 0.5 MI NW OF JCT NORTH A | Wood Slab (2 spans) | -- | 1945 | -- | 21.3 | 44.0 | Poor | 39.7 | 89381 |
NBI report | TH 4 | CEDAR RUN | 0.8 MI N OF TRIMONT | Concrete Culvert (2 spans) | -- | 1946 | -- | 12.5 | 25.9 | Fair | 85.7 | 8567 |
NBI report | TH 4 | ELM CREEK | 3.0 MI N OF JCT TH 90 | Steel Stringer/Multi-beam or girder (3 spans) | -- | 1948 | -- | 53.2 | 120.1 | Fair | 98.8 | 6504 |
NBI report | CSAH 54 | PERCH CREEK | 1.0 MI E OF JCT CSAH 39 | Wood Slab (2 spans) | -- | 1952 | -- | 19.0 | 40.4 | Fair | 76.9 | 89498 |
NBI report | TWP 107 | SOUTH CREEK | 0.6 MI N OF JCT CSAH 26 | Wood Slab (2 spans) | -- | 1952 | -- | 19.0 | 38.1 | Fair | 97.0 | 89493 |
NBI report | CSAH 21 | ELM CREEK | 1.1 MI S OF JCT CSAH 38 | Wood Slab (3 spans) | -- | 1953 | -- | 22.0 | 65.9 | Fair | 91.5 | 89354 |
NBI report | TWP 110 | WILLOW CREEK | 0.4 MI E OF JCT CSAH 27 | Wood Slab | -- | 1953 | -- | 24.0 | 26.2 | Poor | 55.8 | L7251 |
NBI report | TWP 6 | CEDAR RUN | 0.3 MI N OF JCT CSAH 44 | Wood Slab (2 spans) | -- | 1953 | -- | 23.0 | 48.6 | Poor | 52.4 | L7206 |
NBI report | CSAH 9 | CEDAR RUN | 1.3 MI N OF JCT CSAH 44 | Wood Stringer/Multi-beam or girder (3 spans) | -- | 1957 | -- | 21.0 | 65.6 | Fair | 69.9 | 7196 |
NBI report | CSAH 8 | TUTTLE LAKE OUTLET | 1.5 MI W OF JCT CR 133 | Wood Stringer/Multi-beam or girder (3 spans) | -- | 1959 | -- | 44.9 | 89.6 | Poor | 34.9 | 46501 |
NBI report | CSAH 22 | CO DITCH # 11 | 0.9 MI. E. OF CSAH 19 | Prestressed Stringer/Multi-beam or girder | -- | 1963 | -- | 26.2 | 31.2 | Fair | 91.9 | 46502 |
NBI report | CSAH 38 | ELM CREEK | 0.5 MI E OF JCT CSAH 21 | Prestressed Stringer/Multi-beam or girder (3 spans) | -- | 1964 | -- | 30.8 | 93.5 | Fair | 57.8 | 46504 |
NBI report | CSAH 53 | ELM CREEK | 1.1 MI S OF JCT CSAH 44 | Prestressed Stringer/Multi-beam or girder (3 spans) | -- | 1964 | -- | 30.8 | 93.2 | Fair | 91.5 | 46503 |
NBI report | CSAH 33 | ELM CREEK | 1.3 MI N OF JCT CSAH 38 | Prestressed Stringer/Multi-beam or girder (3 spans) | -- | 1965 | -- | 31.2 | 93.2 | Good | 92.0 | 46505 |
NBI report | TWNS 355 | CENTER CREEK | 0.2 MI S OF JCT CR 134 | Prestressed Stringer/Multi-beam or girder (3 spans) | -- | 1965 | -- | 31.2 | 81.0 | Good | 92.0 | 46506 |
NBI report | CR. 122 | OVER E FK DES MO | 1.9 MI W OF JCT TH 4 | Prestressed Stringer/Multi-beam or girder (3 spans) | -- | 1966 | -- | 31.2 | 81.0 | Good | 97.0 | 46507 |
NBI report | CSAH 39 | ELM CREEK | 0.5 MI S OF JCT CR 142 | Prestressed Stringer/Multi-beam or girder (3 spans) | -- | 1966 | -- | 31.2 | 93.2 | Fair | 76.5 | 46508 |
NBI report | TWP 77 | C.S.A.H. 23 OVER E. FK. | 2.0 MI N OF JCT CSAH 8 | Prestressed Stringer/Multi-beam or girder (3 spans) | -- | 1966 | -- | 31.2 | 92.9 | Fair | 92.0 | 46509 |
NBI report | CSAH 27 | WILLOW CREEK | 0.8 MI N OF JCT CSAH 50 | Prestressed Stringer/Multi-beam or girder | -- | 1968 | -- | 28.5 | 30.8 | Fair | 77.5 | 46510 |
NBI report | CSAH 39 | DUTCH CREEK | 2.1 MI N OF JCT CSAH 20 | Prestressed Stringer/Multi-beam or girder | -- | 1969 | -- | 28.9 | 30.8 | Good | 96.2 | 46511 |
NBI report | 100 AVE | CO DITCH # 11 | 1.0 MI S OF JCT CSAH 22 | Prestressed Stringer/Multi-beam or girder (2 spans) | -- | 1970 | -- | 21.0 | 42.0 | Good | 96.0 | L9344 |
NBI report | CSAH 18 | JUDICIAL DITCH #14 | 0.2 MI S OF JCT CSAH 18 | Wood Stringer/Multi-beam or girder | -- | 1970 | -- | 33.5 | 36.1 | Good | 95.8 | 22517 |
NBI report | TWP 298 | LILY CREEK | 0.3 MI E OF JCT CSAH 33 | Prestressed Stringer/Multi-beam or girder (3 spans) | -- | 1970 | -- | 24.9 | 63.0 | Fair | 97.0 | 46514 |
NBI report | TWP 49 | ELM CREEK | 0.9 MI S OF JCT CSAH 44 | Prestressed Stringer/Multi-beam or girder (3 spans) | -- | 1970 | -- | 30.8 | 93.2 | Good | 91.0 | L9299 |
NBI report | CSAH 18 | SOUTH CREEK | 0.9 MI W OF JCT CR 151 | Prestressed Stringer/Multi-beam or girder (3 spans) | -- | 1971 | -- | 31.2 | 81.4 | Fair | 83.2 | 46515 |
NBI report | CSAH 7 | I 90 | 3.2 MI W OF JCT TH 4 | Prestressed Stringer/Multi-beam or girder (4 spans) | -- | 1971 | -- | 85.6 | 279.2 | Fair | 95.0 | 46801 |
NBI report | CR 125 | E FK DES MOINES RIVER | 2.8 MI S OF JCT CSAH 22 | Prestressed Stringer/Multi-beam or girder (3 spans) | -- | 1972 | -- | 30.8 | 94.2 | Fair | 91.0 | 46513 |
NBI report | CSAH 33 | LILY CREEK | 1.1 MI N OF JCT CSAH 32 | Prestressed Stringer/Multi-beam or girder (3 spans) | -- | 1972 | -- | 25.3 | 63.3 | Fair | 92.0 | 46516 |
NBI report | CSAH 53 | I 90 | AT THE JCT TH 262 | Prestressed Stringer/Multi-beam or girder (4 spans) | -- | 1972 | -- | 85.6 | 307.8 | Fair | 96.8 | 46823 |
NBI report | I 90 | SOUTH CREEK | 3.6 MI E OF JCT TH 262 | Concrete Culvert (3 spans) | -- | 1972 | -- | 14.1 | 37.1 | Fair | 75.0 | 91136 |
NBI report | I 90 | E FK DES MOINES RIVER | 5.1 MI W OF JCT TH 4 | Concrete Culvert (3 spans) | -- | 1972 | -- | 9.8 | 33.1 | Good | 75.4 | 91217 |
NBI report | I 90 | STREAM | 6.1 MI W OF JCT TH 4 | Concrete Culvert (2 spans) | -- | 1972 | -- | 12.8 | 30.8 | Good | 75.4 | 91315 |
NBI report | I 90 EB | TWP 318 | 0.1 MI W OF JCT TH 4 | Prestressed Stringer/Multi-beam or girder (3 spans) | -- | 1972 | -- | 47.6 | 143.7 | Good | 96.8 | 46804 |
NBI report | I 90 EB | TH 4 | AT THE JCT TH 4 | Prestressed Stringer/Multi-beam or girder (3 spans) | -- | 1972 | -- | 89.2 | 187.3 | Fair | 96.8 | 46806 |
NBI report | I 90 WB | TWP 318 | 0.1 MI W OF JCT TH 4 | Prestressed Stringer/Multi-beam or girder (3 spans) | -- | 1972 | -- | 47.6 | 143.7 | Fair | 95.6 | 46803 |
NBI report | I 90 WB | TH 4 | AT THE JCT TH 4 | Prestressed Stringer/Multi-beam or girder (3 spans) | -- | 1972 | -- | 89.2 | 187.3 | Fair | 91.8 | 46805 |
NBI report | TWP 40 | I 90 | 2.1 MI E OF JCT TH 15 | Prestressed Stringer/Multi-beam or girder (4 spans) | -- | 1972 | -- | 85.6 | 304.1 | Good | 96.4 | 46831 |
NBI report | CSAH 130 | I 90 | 5.3 MI W OF JCT TH 15 | Prestressed Stringer/Multi-beam or girder (4 spans) | -- | 1973 | -- | 85.6 | 279.5 | Good | 92.0 | 46813 |
NBI report | CSAH 23 | I 90 | 3.9 MI E OF JCT TH 4 | Prestressed Stringer/Multi-beam or girder (4 spans) | -- | 1973 | -- | 85.3 | 278.6 | Fair | 95.6 | 46832 |
NBI report | CSAH 39 | I 90 | 1.8 MI W OF JCT TH 15 | Prestressed Stringer/Multi-beam or girder (4 spans) | -- | 1973 | -- | 86.6 | 321.9 | Good | 99.0 | 46814 |
NBI report | CSAH 39 | LILY CREEK | 0.2 MI S OF JCT TH 90 | Concrete Culvert (2 spans) | -- | 1973 | -- | 12.8 | 28.9 | Good | 97.3 | 93013 |
NBI report | CSAH 41 | I 90 | 0.7 MI W OF JCT TH 15 | Prestressed Stringer/Multi-beam or girder (4 spans) | -- | 1973 | -- | 85.6 | 307.8 | Good | 94.5 | 46829 |
NBI report | CSAH 59 | I 90 | 8.2 MI E OF JCT TH 15 | Prestressed Stringer/Multi-beam or girder (4 spans) | -- | 1973 | -- | 86.0 | 304.5 | Fair | 91.9 | 46824 |
NBI report | CSAH 59 | SOUTH CREEK | 0.6 MI N OF JCT CSAH 26 | Concrete Culvert (3 spans) | -- | 1973 | -- | 14.1 | 38.1 | Good | 98.0 | 91209 |
NBI report | I 90 | E FK DES MOINES RIVER | 6.0 MI W OF JCT TH 4 | Concrete Culvert (2 spans) | -- | 1973 | -- | 9.8 | 22.3 | Good | 75.4 | 91216 |
NBI report | I 90 | E FK DES MOINES RIVER | 5.5 MI W OF JCT TH 4 | Concrete Culvert (2 spans) | -- | 1973 | -- | 14.1 | 32.5 | Good | 75.4 | 91316 |
NBI report | I 90 EB | IM RAIL | 1.5 MI E OF JCT TH 4 | Prestressed Stringer/Multi-beam or girder (3 spans) | -- | 1973 | -- | 47.2 | 144.7 | Fair | 95.7 | 46808 |
NBI report | I 90 EB | TH 263 | 6.3 MI E OF JCT TH 4 | Prestressed Stringer/Multi-beam or girder (3 spans) | -- | 1973 | -- | 86.9 | 203.1 | Fair | 98.0 | 46812 |
NBI report | I 90 EB | LILY CREEK | 3.4 MI W OF JCT TH 15 | Prestressed Stringer/Multi-beam or girder | -- | 1973 | -- | 64.0 | 65.6 | Good | 98.0 | 46816 |
NBI report | I 90 EB | CNW RY (ABAN) | 0.1 MI W OF JCT TH 15 | Prestressed Stringer/Multi-beam or girder (3 spans) | -- | 1973 | -- | 48.6 | 149.6 | Fair | 98.0 | 46818 |
NBI report | I 90 EB | IM RAIL | 1.6 MI E OF JCT TH 15 | Prestressed Stringer/Multi-beam or girder (3 spans) | -- | 1973 | -- | 63.3 | 195.9 | Fair | 98.0 | 46822 |
NBI report | I 90 EB | TH 15 | AT THE JCT TH 15 | Prestressed Stringer/Multi-beam or girder (2 spans) | -- | 1973 | -- | 96.8 | 193.6 | Fair | 92.1 | 46834 |
NBI report | I 90 EB | CENTER CREEK | 1.3 MI E OF JCT TH 15 | Prestressed Stringer/Multi-beam or girder (3 spans) | -- | 1973 | -- | 50.9 | 152.6 | Fair | 90.6 | 46836 |
NBI report | I 90 WB | IM RAIL | 1.5 MI E OF JCT TH 4 | Prestressed Stringer/Multi-beam or girder (3 spans) | -- | 1973 | -- | 47.2 | 144.7 | Good | 95.7 | 46807 |
NBI report | I 90 WB | TH 263 | 6.3 MI E OF JCT TH 4 | Prestressed Stringer/Multi-beam or girder (3 spans) | -- | 1973 | -- | 86.9 | 203.1 | Good | 98.0 | 46811 |
NBI report | I 90 WB | LILY CREEK | 3.4 MI W OF JCT TH 15 | Prestressed Stringer/Multi-beam or girder | -- | 1973 | -- | 64.0 | 65.6 | Good | 98.0 | 46815 |
NBI report | I 90 WB | CNW RY (ABAN) | 0.1 MI W OF JCT TH 15 | Prestressed Stringer/Multi-beam or girder (3 spans) | -- | 1973 | -- | 48.6 | 149.6 | Fair | 98.0 | 46817 |
NBI report | I 90 WB | IM RAIL | 1.6 MI E OF JCT TH 15 | Prestressed Stringer/Multi-beam or girder (3 spans) | -- | 1973 | -- | 63.3 | 195.9 | Fair | 98.0 | 46821 |
NBI report | I 90 WB | TH 15 | AT THE JCT TH 15 | Prestressed Stringer/Multi-beam or girder (2 spans) | -- | 1973 | -- | 96.8 | 193.6 | Good | 91.3 | 46833 |
NBI report | I 90 WB | CENTER CREEK | 1.3 MI E OF JCT TH 15 | Prestressed Stringer/Multi-beam or girder (3 spans) | -- | 1973 | -- | 50.9 | 152.6 | Fair | 93.0 | 46835 |
NBI report | TH 15 | CENTER CREEK | 0.3 MI S OF JCT TH 90 | Prestressed Stringer/Multi-beam or girder | -- | 1973 | -- | 74.2 | 76.4 | Fair | 83.1 | 46002 |
NBI report | TWP 298 | LILY CREEK | 0.6 MI W OF JCT CSAH 33 | Prestressed Stringer/Multi-beam or girder (3 spans) | -- | 1973 | -- | 30.8 | 69.2 | Fair | 97.0 | 46517 |
NBI report | UP RR | I 90 | 4.5 MI E OF JCT TH 4 | Steel Girder and floorbeam system | -- | 1973 | -- | 87.9 | -- | -- | -- | 46830 |
NBI report | CR 103 | ELM CREEK | 1.2 MI S OF JCT CSAH 44 | Prestressed Stringer/Multi-beam or girder | -- | 1975 | -- | 54.5 | 57.4 | Good | 84.3 | 46520 |
NBI report | CR107 | CR.107 OVER ELM CREEK | 1.9 MI N OF JCT CSAH 36 | Prestressed Stringer/Multi-beam or girder (3 spans) | -- | 1975 | -- | 31.2 | 69.2 | Good | 97.0 | 46519 |
NBI report | TWP 171 | CEDAR RUN | 1.5 MI W OF JCT CSAH 9 | Prestressed Stringer/Multi-beam or girder | -- | 1975 | -- | 28.9 | 30.8 | Good | 96.9 | L5974 |
NBI report | TWP 3 | CEDAR RUN | 1.9 MI N OF JCT CSAH 44 | Prestressed Stringer/Multi-beam or girder | -- | 1975 | -- | 28.9 | 30.8 | Fair | 96.9 | L9577 |
NBI report | CSAH 14 | JUD DITCH # 36 | 1.9 MI E OF JCT TH 263 | Prestressed Stringer/Multi-beam or girder | -- | 1976 | -- | 28.9 | 30.8 | Fair | 98.0 | 46524 |
NBI report | TWP 126 | SOUTH CREEK | 0.4 MI E OF JCT CSAH 59 | Wood Slab (3 spans) | -- | 1976 | -- | 26.2 | 78.1 | Fair | 97.0 | 46525 |
NBI report | TWP 18 | ELM CREEK | 1.2 MI E OF JCT CSAH 38 | Wood Slab (3 spans) | -- | 1976 | -- | 32.2 | 84.0 | Fair | 97.0 | 46528 |
NBI report | TWP 193 | E FK DES MOINES RIVER | 0.8 MI W OF JCT CR 107 | Prestressed Stringer/Multi-beam or girder | -- | 1976 | -- | 56.4 | 57.4 | Good | 92.7 | 46521 |
NBI report | TWP 197 | E FK DES MOINES RIVER | 1.2 MI W OF JCT TH 4 | Prestressed Stringer/Multi-beam or girder | -- | 1976 | -- | 56.1 | 57.4 | Good | 92.7 | 46522 |
NBI report | TWP 295 | CENTER CREEK | 0.6 MI N OF JCT CSAH 32 | Prestressed Stringer/Multi-beam or girder (3 spans) | -- | 1976 | -- | 24.9 | 75.1 | Fair | 98.0 | 46523 |
NBI report | 100 AVE | CO DITCH # 11 | 2.3 MI N OF JCT CSAH 8 | Wood Slab (3 spans) | -- | 1977 | -- | 31.8 | 67.3 | Good | 97.0 | 46534 |
NBI report | CR 107 | E FK DES MOINES RIVER | 1.1 MI S OF JCT CR. 122 | Prestressed Stringer/Multi-beam or girder (3 spans) | -- | 1977 | -- | 25.3 | 63.3 | Good | 98.0 | 46530 |
NBI report | CR 132 | LILY CREEK | 0.8 MI E OF JCT CSAH 27 | Concrete Culvert (2 spans) | -- | 1977 | -- | 11.5 | 29.5 | Fair | 98.0 | 91710 |
NBI report | CSAH 13 | JUD DITCH # 50 | 1.5 MI S OF JCT TH 4 | Prestressed Stringer/Multi-beam or girder | -- | 1977 | -- | 54.1 | 59.7 | Good | 88.3 | 46540 |
NBI report | CSAH 19 | E FK DES MOINES RIVER | 0.2 MI N OF JCT CSAH 8 | Prestressed Stringer/Multi-beam or girder (3 spans) | -- | 1977 | -- | 31.2 | 69.2 | Fair | 98.0 | 46529 |
NBI report | CSAH 27 | ELM CREEK | 1.2 MI S OF JCT CSAH 44 | Prestressed Stringer/Multi-beam or girder (3 spans) | -- | 1977 | -- | 31.2 | 93.2 | Fair | 95.7 | 46518 |
NBI report | TH 4 | CO DITCH # 1 | 1.5 MI W OF SHERBURN | Prestressed Stringer/Multi-beam or girder (2 spans) | -- | 1977 | -- | 54.1 | 111.6 | Good | 98.8 | 46003 |
NBI report | TWP 113 | ELM CREEK | 0.6 MI W OF JCT CSAH 53 | Prestressed Stringer/Multi-beam or girder (3 spans) | -- | 1977 | -- | 43.3 | 131.2 | Good | 98.0 | 46535 |
NBI report | TWP 176 | ELM CREEK | 0.2 MI W OF JCT CR. 107 | Wood Slab (3 spans) | -- | 1977 | -- | 32.2 | 67.9 | Good | 97.0 | 46541 |
NBI report | TWP 193 | JUD DITCH # 50 | 0.3 MI W OF JCT CSAH 13 | Concrete Culvert (2 spans) | -- | 1977 | -- | 11.5 | 27.9 | Good | 98.0 | 91434 |
NBI report | TWP 48 | CENTER CREEK | 0.1 MI N OF JCT CSAH 32 | Wood Slab (3 spans) | -- | 1977 | -- | 32.2 | 84.0 | Fair | 97.0 | 46536 |
NBI report | TWP 67 | E FK DES MOINES RIVER | 0.6 MI S OF JCT CSAH 26 | Wood Slab (3 spans) | -- | 1977 | -- | 31.8 | 67.3 | Fair | 97.0 | 46537 |
NBI report | TWP 67 | E FK DES MOINES RIVER | 0.5 MI N OF JCT CR 122 | Wood Slab (3 spans) | -- | 1977 | -- | 24.0 | 60.0 | Good | 97.0 | 46538 |
NBI report | TWP 69 | E FK DES MOINES RIVER | 1.5 MI S OF JCT CR. 122 | Wood Slab (3 spans) | -- | 1977 | -- | 24.0 | 71.9 | Good | 97.0 | 46539 |
NBI report | CR 103 | BR CEDAR RUN | 0.3 MI N OF JCT CR 150 | Concrete Culvert (2 spans) | -- | 1978 | -- | 8.5 | 23.6 | Good | 98.0 | 91409 |
NBI report | CR 103 | CEDAR RUN | 0.6 MI S OF N. CO. LINE | Concrete Culvert (2 spans) | -- | 1978 | -- | 11.5 | 27.9 | Fair | 98.0 | 91410 |
NBI report | CSAH 19 | CEDAR RUN | 0.2 MI N OF JCT CSAH 38 | Prestressed Stringer/Multi-beam or girder (2 spans) | -- | 1978 | -- | 43.6 | 89.9 | Good | 95.4 | 46531 |
NBI report | CSAH 19 | JUD DITCH # 50 | 0.6 MI N OF JCT CSAH 22 | Concrete Culvert (2 spans) | -- | 1978 | -- | 14.1 | 33.1 | Good | 98.0 | 91404 |
NBI report | TWP 243 | SOUTH CREEK | 2.1 MI E OF JCT TH 15 | Concrete Culvert (2 spans) | -- | 1978 | -- | 9.5 | 24.3 | Good | 98.0 | 91559 |
NBI report | CSAH 12 | SOUTH CREEK | 0.6 MI W OF JCT CSAH 51 | Concrete Culvert (3 spans) | -- | 1979 | -- | 9.8 | 40.0 | Good | 97.7 | 91827 |
NBI report | CSAH 13 | E FK DES MOINES RIVER | 1.1 MI N OF JCT CSAH 8 | Prestressed Stringer/Multi-beam or girder (2 spans) | -- | 1979 | -- | 36.7 | 76.1 | Good | 97.9 | 46552 |
NBI report | CSAH 32 | LILY CREEK | 1.2 MI W OF JCT CSAH 39 | Prestressed Stringer/Multi-beam or girder (3 spans) | -- | 1979 | -- | 30.2 | 90.9 | Good | 95.9 | 46532 |
NBI report | TWP 11 | ELM CREEK | 1.4 MI S OF JCT CR 138 | Wood Slab (3 spans) | -- | 1979 | -- | 29.9 | 89.9 | Fair | 97.0 | 46551 |
NBI report | TWP 12 | ELM CREEK | 1.5 MI S OF JCT CR 138 | Wood Slab (4 spans) | -- | 1979 | -- | 29.9 | 119.1 | Fair | 97.0 | 46542 |
NBI report | TWP 174 | CEDAR RUN | 0.5 MI E OF JCT CSAH 9 | Wood Slab (3 spans) | -- | 1979 | -- | 24.0 | 71.9 | Good | 97.0 | 46546 |
NBI report | TWP 199 | FOUR MILE CRK (JD #105) | 0.8 MI W OF JCT CR 107 | Concrete Culvert (2 spans) | -- | 1979 | -- | 9.8 | 25.9 | Good | 98.0 | 91808 |
NBI report | TWP 198 | CO DITCH # 11 | 0.8 MI E OF JCT CSAH 19 | Wood Slab (3 spans) | -- | 1980 | -- | 25.9 | 62.0 | Good | 97.0 | 46548 |
NBI report | CR 142 | ELM CREEK | 1.0 MI E OF JCT CSAH 39 | Prestressed Stringer/Multi-beam or girder (3 spans) | -- | 1981 | -- | 43.3 | 129.9 | Good | 93.7 | 46533 |
NBI report | CSAH 26 | E FK DES MOINES RIVER | 1.2 MI E OF W CO LINE | Prestressed Stringer/Multi-beam or girder | -- | 1981 | -- | 61.4 | 66.6 | Good | 92.4 | 46560 |
NBI report | CSAH 26 | STREAM | 1.0 MI E OF W CO LINE | Concrete Culvert (2 spans) | -- | 1981 | -- | 16.7 | 37.1 | Good | 97.5 | 95311 |
NBI report | TWP 200 | CO DITCH # 11 | 0.9 MI E OF JCT CSAH 19 | Wood Slab (3 spans) | -- | 1981 | -- | 25.6 | 77.4 | Good | 96.7 | 46549 |
NBI report | TH 15 | ELM CREEK | 4.0 MI S OF TRUMAN | Prestressed Stringer/Multi-beam or girder (2 spans) | -- | 1982 | -- | 76.4 | 157.5 | Good | 96.5 | 46004 |
NBI report | TWP 180 | ELM CREEK | 0.7 MI NE OF JCT CSAH 36 | Wood Slab (3 spans) | -- | 1982 | -- | 32.2 | 96.1 | Good | 90.6 | 46547 |
NBI report | WOODLAND AVE | CHAN BTWN LAKES | 1.0 MI E OF JCT CSAH 39 | Prestressed Stringer/Multi-beam or girder | -- | 1982 | -- | 73.8 | 77.1 | Good | 97.3 | 46543 |
NBI report | TWP 329 | ELM CREEK | 0.4 MI S OF JCT CSAH 44 | Wood Slab (3 spans) | -- | 1983 | -- | 24.0 | 60.0 | Good | 97.0 | 46554 |
NBI report | TWP 109 | CEDAR RUN | 0.8 MI E OF JCT CR 103 | Concrete Culvert (2 spans) | -- | 1985 | -- | 10.2 | 27.2 | Good | 98.0 | 95258 |
NBI report | TWP 2 | CEDAR RUN | 0.9 MI N OF JCT CR 150 | Concrete Culvert (2 spans) | -- | 1985 | -- | 16.1 | 44.3 | Good | 98.0 | 95257 |
NBI report | TWP 63 | ELM CREEK | 0.9 MI S OF JCT CSAH 40 | Wood Slab (3 spans) | -- | 1986 | -- | 24.0 | 71.9 | Good | 97.0 | 46557 |
NBI report | CR 159 | ELM CREEK | 1.2 MI SE OF JCT CSAH 44 | Prestressed Stringer/Multi-beam or girder (3 spans) | -- | 1988 | -- | 39.4 | 118.1 | Good | 97.9 | 46564 |
NBI report | MUN 127(LAIR RD) | DUTCH CREEK | 0.1 MI E OF JCT CSAH 39 | Prestressed Stringer/Multi-beam or girder | -- | 1991 | -- | 44.9 | 47.6 | Good | 99.0 | 46561 |
NBI report | TWP 14 | CEDAR RUN | 0.5 MI N OF JCT CSAH 38 | Concrete Culvert (2 spans) | -- | 1991 | -- | 12.1 | 36.1 | Fair | 97.0 | 96893 |
NBI report | TH 263 | E FK DES MOINES RIVER | 2.8 MI N OF CEYLON | Prestressed Stringer/Multi-beam or girder (3 spans) | -- | 1992 | -- | 39.7 | 122.4 | Good | 98.8 | 46010 |
NBI report | TWP 135 | SOUTH CREEK | 3.0 MI E OF JCT TH 15 | Prestressed Stringer/Multi-beam or girder | -- | 1992 | -- | 52.2 | 53.2 | Good | 98.0 | 46563 |
NBI report | TWP 205 | ELM CREEK | 0.6 MI S OF JCT CSAH 44 | Prestressed Stringer/Multi-beam or girder (3 spans) | -- | 1992 | -- | 42.3 | 127.3 | Good | 98.0 | 46553 |
NBI report | TWP 298 | LILY CREEK (CD # 52) | 1.6 MI W OF JCT CSAH 33 | Concrete Culvert (2 spans) | -- | 1994 | -- | 12.1 | 27.6 | Good | 98.0 | 97887 |
NBI report | CSAH 53 | SOUTH CREEK | 1.5 MI S OF JCT CSAH 26 | Prestressed Stringer/Multi-beam or girder (3 spans) | -- | 1995 | -- | 49.2 | 129.9 | Good | 97.1 | 46565 |
NBI report | TWP 291 | CO DITCH # 53 | 1.3 MI S OF JCT CR. 106 | Concrete Culvert (2 spans) | -- | 1995 | -- | 12.1 | 27.6 | Good | 98.0 | 91809 |
NBI report | TWP 20 | LILY CREEK (CD #52) | 1.9 MI S OF JCT CSAH 38 | Concrete Culvert (2 spans) | -- | 1997 | -- | 12.1 | 27.6 | Good | 98.0 | 46J01 |
NBI report | TWP 54 | ELM CREEK | 1.4 MI S OF JCT CSAH 44 | Wood Stringer/Multi-beam or girder | -- | 1997 | -- | 67.9 | 124.0 | Good | 94.8 | 46566 |
NBI report | TWP 329 | CO DITCH # 53 | 1.4 MI W OF JCT CSAH 19 | Concrete Culvert (2 spans) | -- | 1998 | -- | 13.8 | 32.2 | Good | 98.0 | 46J03 |
NBI report | CSAH 18 | JUD DITCH # 14 | 1.8 MI E OF JCT CSAH 59 | Concrete Culvert (2 spans) | -- | 1999 | -- | 10.5 | 24.9 | Good | 98.0 | 46J02 |
NBI report | TWP 22 | LILY CREEK (CO DITCH #52 | 0.5 MI N OF JCT CR 132 | Concrete Culvert (2 spans) | -- | 1999 | -- | 12.1 | 29.5 | Good | 98.0 | 46J05 |
NBI report | CSAH 26 | SOUTH CREEK | 1.2 MI E OF JCT CSAH 53 | Concrete Culvert (3 spans) | -- | 2000 | -- | 14.4 | 48.2 | Good | 97.3 | 46J09 |
NBI report | CSAH 44 | CEDAR LAKE | 1.7 MI E OF JCT CSAH 9 | Concrete Slab | -- | 2000 | -- | 33.8 | 36.1 | Good | 97.3 | 46569 |
NBI report | TWP 22 | ELM CREEK | 0.8 MI N OF JCT CSAH 38 | Prestressed Stringer/Multi-beam or girder (3 spans) | -- | 2000 | -- | 27.2 | 82.0 | Good | 98.0 | 46571 |
NBI report | TWP 70 | CO DITCH # 53 | 2.6 MI W OF JCT CSAH 19 | Concrete Culvert (2 spans) | -- | 2000 | -- | 10.2 | 26.6 | Good | 98.0 | 46J08 |
NBI report | TWP 72 | JUD DITCH # 50 | 0.9 MI N OF JCT CSAH 22 | Concrete Culvert (2 spans) | -- | 2000 | -- | 19.7 | 47.6 | Good | 98.0 | 46J07 |
NBI report | CSAH 32 | South Creek | 1.0 mi E of jct CSAH 59 | Concrete Slab (3 spans) | -- | 2001 | -- | 32.2 | 85.6 | Good | 99.0 | 46573 |
NBI report | 100 AVE | E Fk Des Moines R | 2.2 mi N of jct CSAH 8 | Prestressed Tee beam (3 spans) | -- | 2002 | -- | 25.3 | 76.1 | Good | 99.0 | 46570 |
NBI report | Lake Ave | Channel btwn Lakes | 1.3 mi W of jct TH 15 | Concrete Slab (3 spans) | -- | 2002 | -- | 40.0 | 92.2 | Good | 98.6 | 46572 |
NBI report | twp 101 | South Creek | 0.1 mi S of jct CR 124 | Concrete Culvert (2 spans) | -- | 2002 | -- | 19.7 | 44.0 | Good | 100.0 | 46J06 |
NBI report | TWP 31 | ELM CREEK | 1.8 MI N OF JCT CSAH 38 | Concrete Slab (3 spans) | -- | 2003 | -- | 40.0 | 106.6 | Good | 98.0 | 46550 |
NBI report | CSAH 36 | ELM CREEK | 1.6 MI W OF JCT TH 4 | Prestressed Stringer/Multi-beam or girder | -- | 2005 | -- | 95.1 | 100.1 | Good | 98.0 | 46559 |
NBI report | 235th AVE (TWP 300 | JUD DITCH # 98 | 0.7 MI N OF JCT CSAH 18 | Concrete Culvert (2 spans) | -- | 2006 | -- | 12.5 | 21.7 | Good | 100.0 | 46J14 |
NBI report | NORTH AV(MSAS 101) | CENTER CREEK | 0.4 MI N JCT MSAS 105 | Concrete Slab (3 spans) | -- | 2007 | -- | 24.9 | 67.6 | Good | 97.7 | 46575 |
NBI report | 110TH AVE | CEDAR RUN | 0.9 MI S OF JCT CSAH 44 | Concrete Culvert (2 spans) | -- | 2010 | -- | 9.8 | 21.7 | Good | 98.0 | 46J28 |
NBI report | LAIR RD | HALL LAKE CHANNEL | 0.3 MI W OF JCT MSAS 110 | Concrete Slab (2 spans) | -- | 2012 | -- | 43.3 | 81.7 | Good | 91.4 | 46574 |
NBI report | TH 4 | FOUR MILE CREEK | 1.5 MI N OF DUNNELL | Concrete Culvert (2 spans) | -- | 2014 | -- | 16.1 | 34.5 | Fair | 99.5 | 46X01 |
NBI report | TH 4 | E FK DES MOINES RIVER | 1.9 MI N OF JCT CSAH 8 | Prestressed Stringer/Multi-beam or girder | -- | 2015 | -- | 97.8 | 100.1 | Good | 99.5 | 46001 |
NBI report | 100TH ST | STREAM | 0.9 MI W OF JCT CR 103 | Concrete Culvert (2 spans) | -- | 2016 | -- | 12.1 | 25.9 | Good | 98.0 | 46J18 |