Carries | Crosses | Location | Design | Status | Year Built | Year Recon. | Span Len. | Total Len. | Condition | Suff. Rating | ID | |
---|---|---|---|---|---|---|---|---|---|---|---|---|
NBI report Bridgehunter | CR 331 | REDMONT RAILROAD | SEC 2 T 3S R 8E | Wood Stringer/Multi-beam or girder (6 spans) | Closed | 1930 | -- | 20.0 | 120.1 | Poor | 16.1 | SA0200000000126 |
NBI report | US 45 | RELIEF | 6.7 MI N PRENTISS CL | Concrete Culvert | -- | 1937 | 1990 | 20.0 | 23.0 | Fair | 77.6 | 210004500226880 |
NBI report Bridgehunter | CR 601 | GOOSE POND CREEK | SEC 3 T 2S R 5E | Steel Stringer/Multi-beam or girder (9 spans) | -- | 1940 | -- | 40.0 | 200.1 | Poor | 35.5 | SA0200000000156 |
NBI report | US 72 | DITCH | 3.7 MI E US 45 | Concrete Culvert | -- | 1940 | 1988 | 20.0 | 20.0 | Good | 62.6 | 210007200206740 |
NBI report | US 72 | CHOATE CREEK | 1.5 MI W TISHOMINGO CL | Concrete Culvert (2 spans) | -- | 1940 | 1989 | 9.8 | 21.0 | Good | 97.5 | 21000720020731B |
NBI report | CR 427 | TUSCUMBIA RELIEF | SEC_12_T 3S_R 7E B | Wood Stringer/Multi-beam or girder (7 spans) | -- | 1948 | -- | 16.1 | 101.1 | Poor | 18.5 | SA0200000000119 |
NBI report | CR510 (OLD MS-455) | TUSCUMBIA RELIEF | SEC 28 T 2S R 7E B | Wood Stringer/Multi-beam or girder (6 spans) | -- | 1950 | -- | 19.0 | 113.2 | Poor | 16.6 | SA0200000000147 |
NBI report Bridgehunter | OLD HIGHWAY 72 | REDMONT RAILROAD | SEC 27 T 2S R 8E | Concrete Tee beam (5 spans) | -- | 1950 | -- | 40.0 | 160.1 | Poor | 31.8 | SA0200000000157 |
NBI report | CR 145 | REDMONT RAILROAD | SEC 36 T 1S R 7E | Steel Stringer/Multi-beam or girder (5 spans) | -- | 1955 | -- | 60.0 | 183.1 | Fair | 24.6 | SA0200000000017 |
NBI report | CR 655 | CODY CREEK | SEC 18 T 2S R 5E B | Concrete Culvert (2 spans) | -- | 1955 | -- | 9.8 | 25.9 | Good | 98.8 | SA0200000000043 |
NBI report | CR 145 | RELIEF OLD HWY 45 | SEC_14_T 2S_R 7E B | Steel Stringer/Multi-beam or girder (3 spans) | -- | 1958 | -- | 19.0 | 57.1 | Poor | 36.3 | SA0200000000075 |
NBI report | US 72 | BRIDGE CREEK | 2.3 MI E US 45 | Prestressed Stringer/Multi-beam or girder (6 spans) | -- | 1960 | -- | 40.0 | 242.1 | Good | 81.1 | 210007200206600 |
NBI report | FULTON DRIVE | TURNER CREEK COLEMAN ST | SEC 2 T 2S R 7E | Concrete Culvert (3 spans) | -- | 1962 | -- | 6.9 | 28.9 | Good | 99.2 | SA0200000000063 |
NBI report Bridgehunter | WEBSTER STREET | NORFOLK SOUTHERN RR | SEC 1 T 2S R 7E | Wood Stringer/Multi-beam or girder (14 spans) | Closed | 1962 | -- | 34.1 | 213.9 | -- | 36.0 | SA0200000000057 |
NBI report | HARPER ROAD | PHILLIPS CREEK | SEC 6 T 2S R 8E | Concrete Slab (7 spans) | -- | 1963 | -- | 21.3 | 149.9 | Fair | 79.5 | SA0200000000085 |
NBI report | CR 606 | TAREBREECHES CREEK | SEC 8 T 2S R 6E B | Steel Stringer/Multi-beam or girder | -- | 1964 | -- | 40.0 | 78.1 | Good | 77.0 | SA0200000000044 |
NBI report | CR 604 | EASTES CREEK BRANCH | SEC 12 T 2S R 6E B | Concrete Slab (3 spans) | -- | 1965 | -- | 19.0 | 57.1 | Fair | 57.0 | SA0200000000046 |
NBI report | CR 604 | EASTES CREEK | SEC 13 T 2S R 6E B | Steel Stringer/Multi-beam or girder | -- | 1965 | -- | 40.0 | 78.1 | Fair | 67.8 | SA0200000000049 |
NBI report | SMITH BRIDGE ROAD | US 45 | 0.5 MI N US 72 | Prestressed Stringer/Multi-beam or girder (4 spans) | -- | 1965 | -- | 60.0 | 244.1 | Good | 84.2 | 410004500227500 |
NBI report | US 45 | NORFOLK SOUTHERN R R | 1.1 MI N US 72 | Prestressed Stringer/Multi-beam or girder | -- | 1965 | -- | 51.5 | 212.9 | Fair | 78.3 | 21000450022756B |
NBI report | US 45 | WENASOGA ROAD | 1.6 MI N US 72 | Prestressed Stringer/Multi-beam or girder | -- | 1965 | -- | 70.9 | 185.4 | Good | 78.3 | 21000450022761A |
NBI report | US 45 | WENASOGA ROAD | 1.6 MI N US 72 | Prestressed Stringer/Multi-beam or girder | -- | 1965 | -- | 70.9 | 185.4 | Good | 79.3 | 21000450022761B |
NBI report | US 45 | KCS RR | 3.1 MI N US 72 | Steel Stringer/Multi-beam or girder (4 spans) | -- | 1965 | -- | 60.0 | 403.6 | Fair | 67.2 | 21000450022776B |
NBI report | SR 350 | CHAMBERS CREEK | 1.6 MI E SR 2 | Concrete Slab (4 spans) | -- | 1967 | -- | 20.0 | 80.1 | Fair | 74.0 | 310035000200160 |
NBI report | SR 350 | WARDLOW CREEK | 3.4 MI E SR 2 | Concrete Slab (5 spans) | -- | 1967 | -- | 20.0 | 100.1 | Fair | 69.8 | 310035000200340 |
NBI report | US 45 | DITCH | 3.2 MI N US 72 | Concrete Culvert | -- | 1967 | -- | 24.0 | 24.0 | Fair | 83.8 | 210004500227770 |
NBI report | SHILOH ROAD | BRIDGE CREEK | SEC 31 T 1S R 8E | Concrete Culvert (3 spans) | -- | 1969 | -- | 8.9 | 32.2 | Good | 99.1 | SA0200000000023 |
NBI report | 3RD STREET | PHILLIPS CREEK | SEC 6 T 2S R 8E | Concrete Channel beam | -- | 1970 | -- | 30.8 | 30.8 | Fair | 77.2 | SA0200000000084 |
NBI report Bridgehunter | CR 400 | TICK CREEK | SEC 32 T 2S R 8E B | Steel Stringer/Multi-beam or girder (3 spans) | -- | 1970 | -- | 60.0 | 120.1 | Fair | 28.1 | SA0200000000097 |
NBI report | OLD 145 TATE ST. | ELAM CREEK | SEC 2 T 2S R 7E | Concrete Channel beam | -- | 1970 | -- | 30.8 | 30.8 | Poor | 19.1 | SA0200000000062 |
NBI report | BELL SCHOOL ROAD | US 45 | 11.8 MI N PRENTISS CL | Prestressed Stringer/Multi-beam or girder | -- | 1972 | -- | 80.1 | 240.2 | Good | 94.9 | 410004500227400 |
NBI report | HARPER ROAD | US 45 | 10.8 MI N PRENTISS CL | Prestressed Stringer/Multi-beam or girder (2 spans) | -- | 1972 | -- | 80.1 | 240.2 | Good | 82.7 | 410004500227290 |
NBI report | KOSSUTH ROAD | US 45 | 12.1 MI N PRENTISS CL | Steel Stringer/Multi-beam or girder (2 spans) | -- | 1972 | -- | 109.9 | 382.9 | Good | 94.9 | 410004500227430 |
NBI report | POLK STREET | RELIEF OLD HWY 45 | SEC 1 T 2S R 7E | Concrete Culvert (2 spans) | -- | 1972 | -- | 7.9 | 26.9 | Good | 99.8 | SA0200000000058 |
NBI report | SHILOH ROAD | PHILLIPS CREEK | SEC 31 T 1S R 8E | Concrete Culvert (3 spans) | -- | 1972 | -- | 9.8 | 34.1 | Fair | 98.8 | SA0200000000024 |
NBI report | SR 2 | TUSCUMBIA RIVER | 14.9 MI E TIPPAH CL | Prestressed Stringer/Multi-beam or girder | -- | 1972 | -- | 100.1 | 180.1 | Fair | 91.3 | 310000200204560 |
NBI report | US 72 | US 45 | US 72 OVER US 45 | Prestressed Stringer/Multi-beam or girder (2 spans) | -- | 1972 | -- | 80.1 | 240.2 | Good | 94.9 | 210007200206270 |
NBI report | WALDRON STREET | ELAM CREEK | SEC 2 T 2S R 7E | Concrete Channel beam (3 spans) | -- | 1972 | -- | 30.8 | 68.9 | Fair | 99.9 | SA0200000000059 |
NBI report | CR 404 | KCS RAILROAD | SEC 13 T 2S R 7E B | Prestressed Stringer/Multi-beam or girder (3 spans) | -- | 1974 | -- | 60.0 | 180.1 | Good | 77.3 | SA0200000000072 |
NBI report | CR 404 | BRIDGE CREEK | SEC 13 T 2S R 7E B | Prestressed Stringer/Multi-beam or girder (3 spans) | -- | 1974 | -- | 60.0 | 180.1 | Good | 84.1 | SA0200000000073 |
NBI report Bridgehunter | ALLEN STREET | ELAM CREEK | SEC 12 T 2S R 7E | Concrete Channel beam (3 spans) | -- | 1975 | -- | 19.0 | 57.1 | Fair | 72.8 | SA0200000000069 |
NBI report | CR632-WILBANKS RD | HERMAN EASTES CREEK | SEC 12 T 2S R 6E | Wood Stringer/Multi-beam or girder (3 spans) | -- | 1975 | -- | 18.0 | 53.2 | Poor | 20.3 | SA0200000000048 |
NBI report | OLD KOSSUTH ROAD | CREEK | SEC 10 T 2S R 7E | Concrete Channel beam | -- | 1975 | -- | 30.8 | 30.8 | Good | 82.9 | SA0200000000068 |
NBI report | CR 220 | CLEAR CREEK | SEC 17 T 2S R 8E | Wood Stringer/Multi-beam or girder (3 spans) | -- | 1976 | -- | 14.1 | 29.9 | Fair | 19.0 | SA0200000000092 |
NBI report | CR 402 | BRIDGE CREEK RELIEF | SEC 23 T 2S R 7E B | Concrete Channel beam (4 spans) | -- | 1976 | -- | 30.8 | 111.9 | Good | 81.0 | SA0200000000079 |
NBI report | CR 540 | HINKLE CREEK TRIB | SEC 26 T 3S R 6E | Steel Stringer/Multi-beam or girder (2 spans) | -- | 1976 | -- | 14.1 | 26.9 | Poor | 14.8 | SA0200000000112 |
NBI report | CR 770 | OVERTON CREEK | SEC 29 T 1S R 5E B | Concrete Culvert (2 spans) | -- | 1976 | -- | 12.1 | 26.6 | Good | 99.9 | SA0200000000002 |
NBI report | US 45 | NORFOLK SOUTHERN R R | 1.1 MI N US 72 | Prestressed Stringer/Multi-beam or girder (4 spans) | -- | 1976 | -- | 51.5 | 215.6 | Fair | 93.5 | 21000450022756A |
NBI report | US 45 | KCS RR | 3.1 MI N US 72 | Prestressed Stringer/Multi-beam or girder (3 spans) | -- | 1976 | -- | 83.0 | 425.5 | Fair | 91.4 | 21000450022776A |
NBI report | US 72 | KCS RR | 1.7 MI E US 45 | Prestressed Stringer/Multi-beam or girder (5 spans) | -- | 1976 | -- | 82.0 | 413.1 | Fair | 90.2 | 210007200206440 |
NBI report | CR 218 | NORFOLK SOUTHERN RR | SEC 27 T 2S R 8E B | Prestressed Stringer/Multi-beam or girder (3 spans) | -- | 1978 | -- | 42.0 | 122.1 | Fair | 76.0 | SA0200000000094 |
NBI report | LINDEN STREET | ELAM CREEK | SEC 2 T 2S R 7E | Concrete Channel beam (3 spans) | -- | 1978 | -- | 30.8 | 68.9 | Fair | 82.2 | SA0200000000061 |
NBI report | SHILOH ROAD | ELAM CREEK KCS RAILROAD | SEC 2 T 2S R 7E | Prestressed Stringer/Multi-beam or girder (8 spans) | -- | 1978 | -- | 89.9 | 615.2 | Good | 95.1 | SA0200000000064 |
NBI report | SR 2 | STREAM | 10.2 MI E TIPPAH CL | Concrete Culvert | -- | 1978 | -- | 20.0 | 24.0 | Good | 97.4 | 310000200204190 |
NBI report | SR 2 | STREAM | 12.9 MI E TIPPAH CL | Concrete Culvert | -- | 1978 | -- | 16.1 | 34.1 | Good | 97.4 | 310000200204460 |
NBI report | SR 2 | STREAM | 13.5 MI E TIPPAH CL | Concrete Culvert | -- | 1978 | -- | 16.1 | 34.1 | Good | 97.4 | 310000200204520 |
NBI report | SR 2 | TUSCUMBIA RELIEF | 14.8 MI E TIPPAH CL | Concrete Culvert (2 spans) | -- | 1978 | -- | 18.0 | 43.0 | Fair | 97.4 | 310000200204550 |
NBI report | SR 2 | TUSCUMBIA RELIEF | 15.0 MI E TIPPAH CL | Prestressed Stringer/Multi-beam or girder (7 spans) | -- | 1978 | -- | 40.0 | 281.5 | Fair | 91.3 | 310000200204570 |
NBI report | SR 2 | TUSCUMBIA RIVER RELIEF | 15.1 MI E TIPPAH CL | Prestressed Stringer/Multi-beam or girder (5 spans) | -- | 1978 | -- | 40.0 | 202.1 | Fair | 91.3 | 310000200204580 |
NBI report | SR 2 | TUSCUMBIA RIVER RELIEF | 15.3 MI E TIPPAH CL | Concrete Culvert (2 spans) | -- | 1978 | -- | 16.1 | 32.2 | Good | 97.4 | 310000200204600 |
NBI report | 402 (FULTON DRIVE) | BRIDGE CREEK | SEC 23 T 2S R 7E B | Concrete Channel beam (3 spans) | -- | 1979 | -- | 30.8 | 92.9 | Good | 88.0 | SA0200000000081 |
NBI report | CR 100 | CHAMBERS CREEK | SEC 20 T 1S R 9E B | Concrete Channel beam (3 spans) | -- | 1980 | -- | 30.8 | 92.9 | Fair | 91.1 | SA0200000000030 |
NBI report | HARPER ROAD | NORFOLK SOUTHERN RR | SEC_ 7_T 2S_R 8E B | Prestressed Stringer/Multi-beam or girder (3 spans) | -- | 1980 | -- | 80.1 | 220.2 | Good | 92.9 | SA0200000000088 |
NBI report | SR 350 | RELIEF | 5.7 MI E SR 2 | Concrete Culvert (3 spans) | -- | 1980 | -- | 15.1 | 45.9 | Good | 97.1 | 310035000200570 |
NBI report | 100 KENDRICK | KCS RR | SEC 32 T 1S R 8E B | Prestressed Stringer/Multi-beam or girder (3 spans) | -- | 1982 | -- | 80.1 | 234.9 | Good | 81.9 | SA0200000000025 |
NBI report | CR 409 | PARMICHA CREEK | SEC 14 T 3S R 7E B | Concrete Slab (5 spans) | -- | 1983 | -- | 19.0 | 95.1 | Fair | 87.6 | SA0200000000122 |
NBI report | CR 200 | RELIEF | SEC 8 T 2S R 8E B | Concrete Channel beam (3 spans) | -- | 1984 | -- | 30.8 | 92.9 | Fair | 76.4 | SA0200000000089 |
NBI report | PROPER STREET | RELIEF | SEC 7 T 2S R 8E B | Concrete Slab (3 spans) | -- | 1984 | -- | 22.6 | 67.6 | Fair | 76.7 | SA0200000000086 |
NBI report | SR 2 | US 45 | SR 2 OVER US 45 | Prestressed Stringer/Multi-beam or girder (2 spans) | -- | 1984 | -- | 91.9 | 349.1 | Good | 99.6 | 310000200205140 |
NBI report | CR 345 | BAIN CREEK | SEC 18 T 3S R 9E | Concrete Channel beam (2 spans) | -- | 1985 | -- | 19.0 | 38.1 | Fair | 89.0 | SA0200000000139 |
NBI report | CR 500 | KOSSUTH CREEK | SEC 4 T 3S R 6E B | Concrete Channel beam (5 spans) | -- | 1985 | -- | 19.0 | 95.1 | Good | 98.8 | SA0200000000108 |
NBI report | SR 356 | TUSCUMBIA RIVER RELIEF | 2.4 MI E US 45 | Concrete Channel beam (5 spans) | -- | 1985 | -- | 30.8 | 154.9 | Fair | 74.3 | 310035600200560 |
NBI report | SR 356 | TUSCUMBIA RIVER | 2.5 MI E US 45 | Prestressed Slab | -- | 1985 | -- | 40.0 | 102.0 | Fair | 74.1 | 310035600200570 |
NBI report | CR 600 | HATCHIE TRIBUTARY | SEC 17 T 2S R 5E B | Concrete Slab (7 spans) | -- | 1986 | -- | 19.0 | 132.9 | Good | 99.8 | SA0200000000039 |
NBI report | CR 409 | PARMICHA CREEK | SEC 10 T 3S R 7E B | Prestressed Stringer/Multi-beam or girder (3 spans) | -- | 1988 | -- | 40.0 | 102.0 | Good | 98.7 | SA0200000000116 |
NBI report | US 72 | CLEAR CREEK | 3.5 MI E US 45 | Prestressed Stringer/Multi-beam or girder (3 spans) | -- | 1988 | -- | 40.0 | 121.7 | Fair | 86.7 | 210007200206720 |
NBI report | US 72 | REDMONT RR | 6.8 MI E US 45 | Prestressed Stringer/Multi-beam or girder (4 spans) | -- | 1988 | -- | 109.9 | 1087.3 | Fair | 85.8 | 21000720020695A |
NBI report | US 72 | REDMONT RR | 6.8 MI E US 45 | Prestressed Stringer/Multi-beam or girder (4 spans) | -- | 1988 | -- | 109.9 | 1087.3 | Fair | 83.8 | 21000720020695B |
NBI report | SR 2 | HATCHIE RIVER RELIEF | 1.7 MI E TIPPAH CL | Prestressed Stringer/Multi-beam or girder | -- | 1989 | -- | 89.9 | 171.9 | Good | 99.2 | 310000200203340 |
NBI report | SR 2 | HATCHIE RIVER | 1.8 MI E TIPPAH CL | Prestressed Stringer/Multi-beam or girder (3 spans) | -- | 1989 | -- | 40.0 | 122.1 | Good | 99.2 | 310000200203360 |
NBI report | SR 2 | HATCHIE RIVER | 1.9 MI E TIPPAH CL | Prestressed Stringer/Multi-beam or girder | -- | 1989 | -- | 89.9 | 192.3 | Good | 99.2 | 310000200203370 |
NBI report | SR 2 | MASON CREEK | 2.1 MI E TIPPAH CL | Prestressed Stringer/Multi-beam or girder | -- | 1989 | -- | 89.9 | 192.9 | Good | 99.2 | 310000200203390 |
NBI report | SR 2 | KOSSUTH CREEK | 6.1 MI E TIPPAH CL | Concrete Culvert (2 spans) | -- | 1989 | -- | 20.0 | 41.0 | Good | 99.2 | 310000200203780 |
NBI report | SR 2 | MILLS CREEK | 8.0 MI E TIPPAH CL | Concrete Culvert (2 spans) | -- | 1989 | -- | 12.1 | 35.1 | Good | 99.2 | 310000200203970 |
NBI report | SR 2 | WALLACE BRANCH | 8.7 MI E TIPPAH CL | Concrete Culvert (2 spans) | -- | 1989 | -- | 12.1 | 24.9 | Good | 98.3 | 310000200204040 |
NBI report | US 72 | CHOATE CREEK | 1.5 MI W TISHOMINGO CL | Concrete Culvert (2 spans) | -- | 1989 | -- | 9.8 | 22.0 | Good | 97.5 | 21000720020731A |
NBI report | US 45 | MAYS CREEK | 6.5 MI N PRENTISS CL | Prestressed Stringer/Multi-beam or girder | -- | 1990 | -- | 60.0 | 141.7 | Good | 99.3 | 21000450022686B |
NBI report | US 45 | MAYS CREEK RELIEF | 6.6 MI N PRENTISS CL | Prestressed Stringer/Multi-beam or girder (3 spans) | -- | 1990 | -- | 29.9 | 91.5 | Good | 99.3 | 21000450022687B |
NBI report | US 45 | RELIEF | 8.1 MI N PRENTISS CL | Prestressed Stringer/Multi-beam or girder (3 spans) | -- | 1990 | -- | 40.0 | 121.4 | Good | 99.3 | 21000450022702B |
NBI report | US 45 | TUSCUMBIA RIVER | 8.3 MI N PRENTISS CL | Prestressed Stringer/Multi-beam or girder | -- | 1990 | -- | 100.1 | 342.5 | Good | 99.3 | 21000450022704B |
NBI report | US 45 | DRY SLOUGH | 8.5 MI N PRENTISS CL | Prestressed Stringer/Multi-beam or girder (4 spans) | -- | 1990 | -- | 40.0 | 161.4 | Good | 99.3 | 21000450022706B |
NBI report | US 45 | STREAM | 8.7 MI N PRENTISS CL | Prestressed Stringer/Multi-beam or girder (4 spans) | -- | 1990 | -- | 40.0 | 161.4 | Good | 99.3 | 21000450022708A |
NBI report | US 45 | BRIDGE CREEK CHANNEL | 9.5 MI N PRENTISS CL | Prestressed Stringer/Multi-beam or girder | -- | 1990 | -- | 80.1 | 482.3 | Good | 99.2 | 21000450022716A |
NBI report | US 45 | BRIDGE CREEK CHANNEL | 9.5 MI N PRENTISS CL | Prestressed Stringer/Multi-beam or girder | -- | 1990 | -- | 80.1 | 482.3 | Good | 99.2 | 21000450022716B |
NBI report | CR 100 | SEVEN MILE CREEK | SEC 34 T 1S R 8E B | Concrete Slab (5 spans) | -- | 1991 | -- | 19.0 | 95.1 | Good | 99.0 | SA0200000000026 |
NBI report | CR 427 | TUSCUMBIA RELIEF | SEC_ 1_T 3S_R 7E B | Wood Stringer/Multi-beam or girder (3 spans) | -- | 1991 | -- | 15.1 | 45.6 | Fair | 31.5 | SA0200000000114 |
NBI report | CR 755 | HATCHIE RIVER | SEC_29_T 1S_R 5E | Steel Truss - Thru | Closed | 1991 | -- | 59.7 | 345.2 | Fair | 28.0 | SA0200000000001 |
NBI report Bridgehunter | CR750 SMTH BRDG RD | TUSCUMBIA RIVER CANAL | SEC 31 T 1S R 7E B | Steel Stringer/Multi-beam or girder | -- | 1991 | -- | 56.1 | 88.9 | Fair | 20.9 | SA0200000000015 |
NBI report | US 45 | HINKLE CREEK RELIEF | 1.1 MI N PRENTISS CI | Prestressed Stringer/Multi-beam or girder (3 spans) | -- | 1991 | -- | 40.0 | 121.4 | Good | 99.3 | 21000450022632A |
NBI report | US 45 | HINKLE CREEK RELIEF | 1.1 MI N PRENTISS CL | Prestressed Stringer/Multi-beam or girder (3 spans) | -- | 1991 | -- | 40.0 | 121.4 | Good | 99.3 | 21000450022632B |
NBI report | US 45 | HINKLE CREEK | 1.2 MI N PRENTISS CL | Prestressed Stringer/Multi-beam or girder (2 spans) | -- | 1991 | -- | 60.0 | 161.8 | Good | 99.3 | 21000450022633A |
NBI report | US 45 | HINKLE CREEK | 1.2 MI N PRENTISS CL | Prestressed Stringer/Multi-beam or girder (2 spans) | -- | 1991 | -- | 60.0 | 161.8 | Good | 99.3 | 21000450022633B |
NBI report | US 45 | BYNUM CREEK | 2.7 MI N PRENTISS CL | Prestressed Stringer/Multi-beam or girder (3 spans) | -- | 1991 | -- | 29.9 | 91.5 | Good | 99.3 | 21000450022648A |
NBI report | US 45 | BYNUM CREEK | 2.7 MI N PRENTISS CL | Prestressed Stringer/Multi-beam or girder (3 spans) | -- | 1991 | -- | 29.9 | 91.9 | Good | 99.3 | 21000450022648B |
NBI report | US 45 | PARMICHA CREEK RELIEF | 4.1 MI N PRENTISS CL | Prestressed Stringer/Multi-beam or girder (3 spans) | -- | 1991 | -- | 40.0 | 101.7 | Good | 99.3 | 21000450022662A |
NBI report | US 45 | PARMICHA CREEK RELIEF | 4.1 MI N PRENTISS CL | Prestressed Stringer/Multi-beam or girder (3 spans) | -- | 1991 | -- | 40.0 | 101.7 | Good | 99.3 | 21000450022662B |
NBI report | US 45 | PARMICHA CREEK | 4.3 MI N PRENTISS CL | Prestressed Stringer/Multi-beam or girder (3 spans) | -- | 1991 | -- | 55.1 | 168.0 | Good | 99.3 | 21000450022664A |
NBI report | US 45 | PARMICHA CREEK | 4.3 MI N PRENTISS CL | Prestressed Stringer/Multi-beam or girder (3 spans) | -- | 1991 | -- | 55.1 | 168.0 | Good | 99.3 | 21000450022664B |
NBI report | US 45 | PARMICHA RELIEF | 4.4 MI N PRENTISS CL | Prestressed Stringer/Multi-beam or girder (3 spans) | -- | 1991 | -- | 29.9 | 91.9 | Good | 99.3 | 21000450022665A |
NBI report | US 45 | PARMICHA RELIEF | 4.4 MI N PRENTISS CL | Prestressed Stringer/Multi-beam or girder (3 spans) | -- | 1991 | -- | 29.9 | 91.9 | Good | 99.3 | 21000450022665B |
NBI report | US 45 | MAYS CREEK | 6.5 MI N PRENTISS CL | Prestressed Stringer/Multi-beam or girder (3 spans) | -- | 1991 | -- | 40.0 | 121.4 | Good | 99.3 | 21000450022686A |
NBI report | US 45 | MAYS CREEK RELIEF | 6.6 MI N PRENTISS CL | Prestressed Stringer/Multi-beam or girder (3 spans) | -- | 1991 | -- | 29.9 | 91.5 | Good | 99.3 | 21000450022687A |
NBI report | US 45 | RELIEF | 8.1 MI N PRENTISS CL | Prestressed Stringer/Multi-beam or girder (3 spans) | -- | 1991 | -- | 40.0 | 121.4 | Good | 99.3 | 21000450022702A |
NBI report | US 45 | TUSCUMBIA RIVER | 8.3 MI N PRENTISS CL | Prestressed Stringer/Multi-beam or girder | -- | 1991 | -- | 100.1 | 342.5 | Good | 99.3 | 21000450022704A |
NBI report | US 45 | DRY SLOUGH | 8.5 MI N PRENTISS CL | Prestressed Stringer/Multi-beam or girder (4 spans) | -- | 1991 | -- | 40.0 | 161.4 | Good | 99.3 | 21000450022706A |
NBI report | US 45 | STREAM | 8.7 MI N PRENTISS CL | Prestressed Stringer/Multi-beam or girder (4 spans) | -- | 1991 | -- | 40.0 | 161.4 | Good | 99.3 | 21000450022708B |
NBI report | 100 KENDRICK ROAD | BRIDGE CREEK KENDRICK RD | SEC 31 T 1S R 8E B | Concrete Slab (4 spans) | -- | 1992 | -- | 19.0 | 76.1 | Good | 99.3 | SA0200000000022 |
NBI report | CR 400 | TAYLOR CREEK | SEC 21 T 3S R 8E B | Concrete Channel beam (3 spans) | -- | 1992 | -- | 30.8 | 92.5 | Good | 98.7 | SA0200000000130 |
NBI report | CR 400 | BROWDERS CREEK | SEC 21 T 3S R 8E B | Concrete Channel beam (4 spans) | -- | 1992 | -- | 30.8 | 123.4 | Good | 98.6 | SA0200000000131 |
NBI report | CR 435 | HURRICANE CREEK | SEC 28 T 3S R 8E | Concrete Channel beam (3 spans) | -- | 1992 | -- | 30.8 | 92.5 | Good | 99.0 | SA0200000000133 |
NBI report | 512 WHEELER GROVE | KOSSUTH CREEK | SEC 35 T 2S R 6E B | Prestressed Stringer/Multi-beam or girder (3 spans) | -- | 1993 | -- | 40.0 | 120.1 | Good | 94.5 | SA0200000000055 |
NBI report | CR 745 | GOOSE POND CREEK | SEC 4 T 2S R 5E B | Concrete Channel beam (3 spans) | -- | 1993 | -- | 40.0 | 120.1 | Good | 99.9 | SA0200000000035 |
NBI report | DRIVEWAY | UNNAMED CREEK | SEC 4 T 2S R 5E | Concrete Channel beam (3 spans) | -- | 1993 | -- | 30.8 | 92.9 | Good | 87.4 | SA0200000000032 |
NBI report | CR 430 | HURRICANE CREEK | SEC 19 T 3S R 8E B | Prestressed Stringer/Multi-beam or girder (3 spans) | -- | 1994 | -- | 80.1 | 160.1 | Good | 98.9 | SA0200000000129 |
NBI report | CR 618 | UNDERWOOD CREEK | SEC 22 T 2S R 6E B | Prestressed Stringer/Multi-beam or girder (3 spans) | -- | 1995 | -- | 40.0 | 102.0 | Good | 99.9 | SA0200000000053 |
NBI report | US 72 | HATCHIE RIVER | 1.8 MI E TIPPAH CL | Prestressed Stringer/Multi-beam or girder | -- | 1995 | -- | 80.1 | 522.3 | Good | 97.6 | 21000720020482A |
NBI report | US 72 | HATCHIE RIVER | 1.8 MI E TIPPAH CL | Prestressed Stringer/Multi-beam or girder | -- | 1995 | -- | 80.1 | 522.3 | Good | 97.6 | 21000720020482B |
NBI report | US 72 | HATCHIE RELIEF CANAL | 2.2 MI E TIPPAH CL | Prestressed Stringer/Multi-beam or girder (2 spans) | -- | 1995 | -- | 80.1 | 382.2 | Good | 97.6 | 21000720020486A |
NBI report | US 72 | HATCHIE RELIEFCANAL | 2.2 MI E TIPPAH CL | Prestressed Stringer/Multi-beam or girder (2 spans) | -- | 1995 | -- | 80.1 | 382.2 | Good | 97.6 | 21000720020486B |
NBI report | US 72 | STREAM | 2.8 MI E TIPPAH CL | Concrete Culvert (2 spans) | -- | 1995 | -- | 11.2 | 23.6 | Good | 82.0 | 210007200204910 |
NBI report | CR 409 | HINKLE CREEK | SEC 35 T 3S R 7E B | Prestressed Stringer/Multi-beam or girder (3 spans) | -- | 1996 | -- | 60.0 | 140.1 | Good | 98.5 | SA0200000000124 |
NBI report | CR 409 | BYNUM CR | SEC 35 T 3S R 7E B | Prestressed Stringer/Multi-beam or girder (3 spans) | -- | 1996 | -- | 60.0 | 140.1 | Good | 98.5 | SA0200000000125 |
NBI report | US 72 | GOOSE POND CREEK | 3.6 MI E TIPPAH CL | Prestressed Stringer/Multi-beam or girder (2 spans) | -- | 1996 | -- | 80.1 | 342.9 | Good | 92.5 | 21000720020499A |
NBI report | US 72 | GOOSE POND CREEK | 3.6 MI E TIPPAH CL | Prestressed Stringer/Multi-beam or girder (2 spans) | -- | 1996 | -- | 80.1 | 342.9 | Good | 92.5 | 21000720020499B |
NBI report | US 72 | GOOSE POND | 5.2 MI E TIPPAH CL | Concrete Culvert (2 spans) | -- | 1996 | -- | 12.1 | 36.1 | Good | 97.5 | 21000720020515A |
NBI report | US 72 | GOOSE POND | 5.2 MI E TIPPAH CL | Concrete Culvert (2 spans) | -- | 1996 | -- | 12.1 | 36.1 | Good | 97.5 | 21000720020515B |
NBI report | US 72 | GOOSE POND | 5.4 MI E TIPPAH CL | Concrete Culvert (2 spans) | -- | 1996 | -- | 12.1 | 36.1 | Good | 69.7 | 210007200205170 |
NBI report | US 72 | TAREBREECHES CREEK | 6.0 MI W US 45 | Prestressed Stringer/Multi-beam or girder (5 spans) | -- | 1996 | -- | 60.0 | 242.8 | Good | 97.5 | 21000720020567A |
NBI report | US 72 | TUSCUMBIA RELIEF | 3.1 MI W US 45 | Prestressed Stringer/Multi-beam or girder (6 spans) | -- | 1996 | -- | 40.0 | 242.5 | Good | 97.5 | 21000720020596A |
NBI report | US 72 | TUSCUMBIA CANAL | 2.9 MI W US 45 | Prestressed Stringer/Multi-beam or girder (7 spans) | -- | 1996 | -- | 109.9 | 462.9 | Good | 95.0 | 21000720020598A |
NBI report | US 72 | RELIEF | 2.5 MI W US 45 | Prestressed Stringer/Multi-beam or girder (9 spans) | -- | 1996 | -- | 40.0 | 362.2 | Good | 97.5 | 21000720020602A |
NBI report | US 72 | CANE CREEK | 1.9 MI W US 45 | Prestressed Stringer/Multi-beam or girder (3 spans) | -- | 1996 | -- | 60.0 | 182.4 | Good | 97.5 | 21000720020608A |
NBI report | CR 177 | SEVEN MILE CREEK | SEC 30 T 1S R 9E | Prestressed Stringer/Multi-beam or girder (5 spans) | -- | 1997 | -- | 40.0 | 200.1 | Good | 97.5 | SA0200000000031 |
NBI report | CR 334 | HOLLY BRANCH | SEC 21 T 3S R 8E | Concrete Channel beam (3 spans) | -- | 1997 | -- | 30.8 | 81.0 | Good | 100.0 | SA0200000000155 |
NBI report | CR 560 | HATCHIE RELIEF | SEC 24 T 3S R 5E B | Steel Girder and floorbeam system | -- | 1997 | -- | 40.7 | 51.5 | Fair | 31.7 | SA0200000000104 |
NBI report | CR 560 | HATCHIE RELIEF | SEC 19 T 3S R 6E B | Steel Girder and floorbeam system | -- | 1997 | -- | 41.0 | 50.9 | Poor | 24.6 | SA0200000000110 |
NBI report | CR 560 | ELLIOTT CREEK | SEC 19 T 3S R 6E B | Steel Girder and floorbeam system | -- | 1997 | -- | 49.9 | 50.9 | Poor | 23.0 | SA0200000000111 |
NBI report | LINDEN STREET | TURNER CREEK | SEC 2 T 2S R 7E | Concrete Culvert | -- | 1997 | -- | 25.6 | 25.6 | Good | 99.2 | SA0200000000060 |
NBI report | UNION CHURCH ROAD | MASON CREEK | SEC 17 T 3S R 6E B | Concrete Channel beam (3 spans) | -- | 1997 | -- | 19.0 | 57.1 | Good | 89.8 | SA0200000000109 |
NBI report | CR 264 | COKE CREEK | SEC 31 T 2S R 9E | Concrete Channel beam (4 spans) | -- | 1998 | -- | 30.8 | 123.4 | Good | 98.0 | SA0200000000100 |
NBI report | CR 301 | CLEAR CREEK | SEC 29 T 2S R 8E | Concrete Channel beam (5 spans) | -- | 1998 | -- | 30.8 | 154.2 | Good | 97.9 | SA0200000000096 |
NBI report | CR 420 | BRANCH | SEC 10 T 3S R 7E | Wood Stringer/Multi-beam or girder (3 spans) | -- | 1998 | -- | 16.1 | 42.0 | Fair | 25.0 | SA0200000000115 |
NBI report | CR 505 | MCELROY CREEK | SEC 20 T 2S R 7E | Prestressed Stringer/Multi-beam or girder (3 spans) | -- | 1998 | -- | 80.1 | 160.1 | Good | 99.9 | SA0200000000078 |
NBI report | CR 550 | OLD DANVILLE CREEK | SEC 6 T 4S R 6E | Prestressed Stringer/Multi-beam or girder (3 spans) | -- | 1998 | -- | 60.0 | 130.9 | Good | 98.0 | SA0200000000141 |
NBI report | CR 605 | TAREBREECHES CREEK | SEC 9 T 2S R 6E B | Prestressed Stringer/Multi-beam or girder (3 spans) | -- | 1998 | -- | 99.7 | 179.8 | Good | 99.9 | SA0200000000045 |
NBI report | US 72 | TAREBREECHES CREEK | 6.0 MI W US 45 | Prestressed Stringer/Multi-beam or girder (5 spans) | -- | 1998 | -- | 60.0 | 242.8 | Good | 97.5 | 21000720020567B |
NBI report | US 72 | TUSCUMBIA RELIEF | 3.1 MI W US 45 | Prestressed Stringer/Multi-beam or girder (6 spans) | -- | 1998 | -- | 40.0 | 242.5 | Good | 97.5 | 21000720020596B |
NBI report | US 72 | TUSCUMBIA CANAL | 2.9 MI W US 45 | Prestressed Stringer/Multi-beam or girder (7 spans) | -- | 1998 | -- | 109.9 | 462.9 | Good | 94.9 | 21000720020598B |
NBI report | US 72 | RELIEF | 2.5 MI W US 45 | Prestressed Stringer/Multi-beam or girder (9 spans) | -- | 1998 | -- | 40.0 | 362.2 | Good | 97.5 | 21000720020602B |
NBI report | US 72 | CANE CREEK | 1.9 MI W US 45 | Prestressed Stringer/Multi-beam or girder (3 spans) | -- | 1998 | -- | 60.0 | 182.4 | Good | 97.5 | 21000720020608B |
NBI report | WENASOGA ROAD | CANE CREEK BRANCH | SEC 28 T 1S R 7E B | Concrete Channel beam (4 spans) | -- | 1998 | -- | 30.8 | 111.6 | Good | 94.5 | SA0200000000011 |
NBI report | WENASOGA ROAD | CANE CREEK BRANCH | SEC 28 T 1S R 7E B | Concrete Channel beam (4 spans) | -- | 1998 | -- | 30.8 | 111.6 | Good | 97.0 | SA0200000000012 |
NBI report | 750 (SMITHBRDG RD) | TAREBREECHES CREEK | SEC 35 T 1S R 6E | Concrete Channel beam (5 spans) | -- | 1999 | -- | 30.8 | 154.2 | Good | 100.0 | SA0200000000007 |
NBI report | CR 352 | LITTLE YELLOW CREEK | SEC 8 T 3S R 9E | Concrete Culvert (2 spans) | -- | 1999 | -- | 17.7 | 39.7 | Good | 99.9 | SA0200000000137 |
NBI report | CR 428 | TICK CREEK | SEC 6 T 3S R 8E | Concrete Channel beam (5 spans) | -- | 1999 | -- | 30.8 | 154.2 | Good | 92.7 | SA0200000000127 |
NBI report | CR 544 | MCDOUGAL CREEK | SEC 30 T 3S R 7E | Stringer/Multi-beam or girder (3 spans) | -- | 1999 | -- | 19.0 | 57.1 | Fair | 41.2 | SA0200000000151 |
NBI report | CR 561 | LITTLE CLEAR CREEK | SEC 35 T 3S R 5E | Concrete Channel beam (4 spans) | -- | 1999 | -- | 30.8 | 124.0 | Good | 97.9 | SA0200000000105 |
NBI report | CR 750 | CANE CREEK | SEC 4 T 2S R 7E B | Prestressed Stringer/Multi-beam or girder (3 spans) | -- | 1999 | -- | 79.7 | 150.6 | Good | 91.2 | SA0200000000065 |
NBI report | GOLDING DRIVE | BRIDGE CREEK | SEC 14 T 2S R 7E B | Concrete Channel beam (3 spans) | -- | 1999 | -- | 30.8 | 92.9 | Good | 98.5 | SA0200000000074 |
NBI report | MATHIS STORE ROAD | JONES CREEK | SEC 5 T 2S R 5E B | Concrete Culvert (2 spans) | -- | 1999 | -- | 16.1 | 35.4 | Good | 99.8 | SA0200000000034 |
NBI report | CR 534 | PARMICHA CREEK | SEC 24 T 3S R 6E | Concrete Culvert (2 spans) | -- | 2000 | -- | 14.1 | 33.5 | Good | 95.7 | SA0200000000149 |
NBI report | SR 356 | MOORES CREEK TRIB | 2.7 MI E US 45 | Prestressed Stringer/Multi-beam or girder (3 spans) | -- | 2000 | -- | 39.4 | 119.8 | Good | 99.6 | 310035600200590 |
NBI report | SR 356 | MOORES CREEK TRIB | 2.8 MI E US 45 | Prestressed Stringer/Multi-beam or girder (3 spans) | -- | 2000 | -- | 39.4 | 119.8 | Good | 99.6 | 310035600200600 |
NBI report | SR 356 | MOORES CREEK | 3.0 MI E US 45 | Prestressed Stringer/Multi-beam or girder (3 spans) | -- | 2000 | -- | 39.4 | 119.8 | Good | 99.6 | 310035600200620 |
NBI report | CR 519 | KOSSUTH CREEK | SEC 36 T 2S R 6E | Concrete Channel beam (5 spans) | -- | 2001 | -- | 30.8 | 130.6 | Good | 100.0 | SA0200000000056 |
NBI report | CR 560 | HATCHIE RELIEF | SEC 24 T 3S R 5E B | Concrete Channel beam (4 spans) | -- | 2001 | -- | 19.0 | 76.1 | Good | 88.9 | SA0200000000102 |
NBI report | CR 718 | LITTLE CANE CREEK | SEC 30 T 1S R 7E | Concrete Channel beam (3 spans) | -- | 2001 | -- | 30.8 | 68.9 | Good | 99.9 | SA0200000000014 |
NBI report | 558 | ELLIOTT CREEK | SEC_29_T 3S_R 6E | Steel Girder and floorbeam system | -- | 2002 | -- | 40.7 | 52.8 | Fair | 68.1 | SA0200000000150 |
NBI report | CR 400 | RIDER CREEK | SEC 34 T 3S R 8E B | Concrete Channel beam (4 spans) | -- | 2002 | -- | 30.8 | 111.6 | Good | 98.6 | SA0200000000135 |
NBI report | CR 518 | HINKLE CREEK | SEC 36 T 3S R 6E B | Concrete Channel beam (5 spans) | -- | 2002 | -- | 30.8 | 154.9 | Fair | 99.9 | SA0200000000113 |
NBI report | CR 550 | HATCHIE RIVER | SEC 36 T 3S R 5E | Prestressed Stringer/Multi-beam or girder (7 spans) | -- | 2002 | -- | 80.1 | 265.1 | Good | 98.0 | SA0200000000107 |
NBI report | CR 152 | SEVEN MILE CREEK | SEC 28 T 1S R 8E | Concrete Channel beam (3 spans) | -- | 2003 | -- | 30.8 | 92.9 | Good | 100.0 | SA0200000000021 |
NBI report Bridgehunter | CR 427 | TUSCUMBIA RIVER CANAL | SEC 12 T 3S R 7E B | Steel Box beam or girders - Multiple (4 spans) | -- | 2003 | -- | 63.3 | 211.0 | Poor | 15.2 | SA0200000000120 |
NBI report | CR 560 | HATCHIE RIVER | SEC 24 T 3S R 5E B | Prestressed Stringer/Multi-beam or girder (7 spans) | -- | 2003 | -- | 80.1 | 266.1 | Good | 91.8 | SA0200000000103 |
NBI report | CR 753 | TAREBREECHES CREEK | SEC 35 T 1S R 6E B | Concrete Channel beam (5 spans) | -- | 2003 | -- | 30.8 | 154.2 | Good | 100.0 | SA0200000000006 |
NBI report | 632 (WILBANKS RD) | HERMAN CREEK | SEC_15_T 2S_R 6E | Steel Box beam or girders - Multiple | Closed | 2004 | -- | 63.3 | 67.6 | Fair | 21.6 | SA0200000000052 |
NBI report | 510 | TUSCUMBIA RIVER | SEC 28 T 2S R 7E B | Steel Box beam or girders - Multiple (3 spans) | -- | 2005 | -- | 63.3 | 89.2 | Fair | 24.8 | SA0200000000082 |
NBI report | CR 100 | UNNAMED CREEK | SEC 20 T 1S R 9E B | Prestressed Stringer/Multi-beam or girder (3 spans) | -- | 2005 | -- | 40.0 | 120.1 | Good | 91.1 | SA0200000000029 |
NBI report | CR 253 | CHOATE CREEK | SEC 14 T 2S R 8E | Concrete Culvert (2 spans) | -- | 2005 | -- | 16.1 | 35.4 | Good | 99.9 | SA0200000000090 |
NBI report | CR 602 | EASTES CREEK | SEC 12 T 2S R 6E | Prestressed Stringer/Multi-beam or girder (3 spans) | -- | 2005 | -- | 60.0 | 140.1 | Good | 100.0 | SA0200000000047 |
NBI report | CR 757 | COON CREEK | SEC 28 T 1S R 6E | Concrete Culvert (2 spans) | -- | 2006 | -- | 16.1 | 39.7 | Good | 100.0 | SA0200000000004 |
NBI report | CR 408 | PARMICHA CREEK | SEC 11 T 3S R 7E | Prestressed Stringer/Multi-beam or girder (3 spans) | -- | 2007 | -- | 40.0 | 120.1 | Good | 100.0 | SA0200000000118 |
NBI report | CR 427 | CLEAR CREEK | SEC 12 T 3S R 7E B | Steel Girder and floorbeam system (5 spans) | -- | 2007 | -- | 30.2 | 144.4 | Fair | 19.8 | SA0200000000121 |
NBI report | CR 611 | RAY CREEK | SEC_18_T 2S_R 5E B | Concrete Channel beam (3 spans) | -- | 2007 | -- | 30.8 | 68.9 | Good | 98.8 | SA0200000000158 |
NBI report Bridgehunter | CR 306 | REDMONT RAILROAD | SEC 27 T 2S R 8E | Concrete Channel beam (3 spans) | -- | 2008 | -- | 40.0 | 120.1 | Good | 95.9 | SA0200000000095 |
NBI report Bridgehunter | CR 309 | REDMONT RAILROAD | SEC 35 T 2S R 8E | Concrete Channel beam (3 spans) | -- | 2008 | -- | 40.0 | 120.1 | Good | 100.0 | SA0200000000099 |
NBI report | CR 518 | BOONE CREEK | SEC 1 T 4S R 6E | Concrete Culvert (2 spans) | -- | 2008 | -- | 16.1 | 39.7 | Good | 99.5 | SA0200000000153 |
NBI report | CR 655 | FOURTH CREEK | SEC 18 T 2S R 5E B | Prestressed Stringer/Multi-beam or girder (5 spans) | -- | 2008 | -- | 30.8 | 154.2 | Good | 99.9 | SA0200000000144 |
NBI report Bridgehunter | CR 343 | REDMONT RAILROAD | SEC 12 T 3S R 8E B | Prestressed Stringer/Multi-beam or girder (3 spans) | -- | 2009 | -- | 80.1 | 160.1 | Good | 94.8 | SA0200000000128 |
NBI report | CR 376 | RIDER CREEK | SEC 35 T 3S R 8E | Steel Other (3 spans) | -- | 2009 | -- | 41.0 | 50.5 | Fair | 47.0 | SA0200000000136 |
NBI report | CR 614 | UNDERWOOD CREEK | SEC 14 T 2S R 6E | Concrete Channel beam (3 spans) | -- | 2009 | -- | 40.0 | 78.1 | Good | 99.9 | SA0200000000050 |
NBI report | DRIVEWAY | GOOSE POND CREEK | SEC 10 T 2S R 5E | Steel Other (3 spans) | -- | 2009 | -- | 39.7 | 49.9 | Fair | 22.0 | SA0200000000036 |
NBI report | DRIVEWAY OFF I-72 | DITCH | SEC 10 T 2S R 5E | Steel Other (3 spans) | -- | 2009 | -- | 24.0 | 41.0 | Good | 39.7 | SA0200000000038 |
NBI report | CR 163 | CHAMBERS CREEK | SEC 19 T 1S R 9E | Concrete Channel beam (3 spans) | -- | 2010 | -- | 40.0 | 77.8 | Good | 100.0 | SA0200000000028 |
NBI report | CR 325 | TICK CREEK | SEC 32 T 2S R 8E | Concrete Channel beam (3 spans) | -- | 2010 | -- | 30.8 | 68.9 | Good | 100.0 | SA0200000000098 |
NBI report | CR 213 | NORFOLK SOUTHERN RR | SEC 17 T 2S R 8E B | Concrete Channel beam (3 spans) | -- | 2011 | -- | 40.0 | 110.9 | Good | 93.4 | SA0200000000091 |
NBI report | K.C. RD | REDMONT RAILROAD | SEC 17 T 2S R 8E | Prestressed Stringer/Multi-beam or girder (3 spans) | -- | 2012 | -- | 80.1 | 160.1 | Good | 96.6 | SA0200000000159 |
NBI report | K.C. RD | CREEK | SEC_ 9_T 2S_R 8E | Concrete Culvert | -- | 2012 | -- | 24.9 | 24.9 | Good | 99.8 | SA0200000000162 |
NBI report | K.C. ROAD | NORFOLK SOUTHERN RR | SEC 17 T 2S R 8E | Prestressed Stringer/Multi-beam or girder (3 spans) | -- | 2012 | -- | 100.1 | 180.1 | Good | 96.2 | SA0200000000160 |
NBI report | K.C. ROAD | CREEK | SEC 9 T 2S R 8E | Concrete Culvert | -- | 2012 | -- | 25.3 | 25.3 | Good | 99.8 | SA0200000000161 |
NBI report | CR 600 | HATCHIE TRIBUTARY | SEC_17_T 2S_R 5E B | Prestressed Stringer/Multi-beam or girder (3 spans) | -- | 2014 | -- | 80.1 | 160.1 | Good | 99.8 | SA020000000A040 |
NBI report | CR 600 | HATCHIE RIVER | SEC_17_T 2S_R 5E B | Prestressed Stringer/Multi-beam or girder (5 spans) | -- | 2014 | -- | 100.1 | 224.1 | Good | 99.8 | SA020000000A041 |
NBI report | CR 600 | HATCHIE RIVER | SEC_17_T 2S_R 5E B | Prestressed Stringer/Multi-beam or girder (3 spans) | -- | 2014 | -- | 80.1 | 160.1 | Good | 99.8 | SA020000000A042 |
NBI report Bridgehunter | CR 609 | GOOSE POND CREEK | SEC 10 T 2S R 5E | Steel Truss - Thru (100 spans) | -- | 2014 | -- | 60.0 | 60.0 | Poor | 34.0 | SA0200000000163 |
NBI report | CR 100 | WALDROP CREEK | SEC 17 T 1S R 9E B | Concrete Culvert (2 spans) | -- | 2015 | -- | 16.1 | 34.5 | Good | 99.2 | SA020000000A027 |
NBI report | CR 346 | REDMONT RAILROAD | SEC 19 T 3S R 9E | Concrete Channel beam (3 spans) | -- | 2015 | -- | 40.0 | 119.8 | Good | 94.0 | SA020000000A140 |
NBI report | CR 655 | BRIDGE CREEK | SEC_31_T2S_R5E | Concrete Channel beam (3 spans) | -- | 2015 | -- | 40.0 | 120.1 | Good | 99.9 | SA020000000A145 |
NBI report | CR 711 | LITTLE CANE CREEK | SEC 30 T 1S R 7E B | Concrete Channel beam (3 spans) | -- | 2016 | -- | 30.8 | 68.9 | Good | 100.0 | SA020000000A013 |
NBI report | CR 201 | PHILLIPS CREEK | SEC 7 T 2S R 8E | Steel Box beam or girders - Multiple | -- | 2017 | -- | 65.9 | 68.2 | Fair | 62.1 | SA020000000A087 |
NBI report | CR 510 | KOSSUTH CREEK | SEC 25 T 2S R 6E B | Concrete Channel beam (3 spans) | -- | 2017 | -- | 40.0 | 110.9 | Good | 98.9 | SA020000000A054 |