OLD MADISON PIKE over INDIAN CREEK

This bridge is no longer in the current National Bridge Inventory database, and has likely been demolished or abandoned.

Map

Coordinates:
+34.70000, -86.70000
34°42'00" N, 86°42'00" W

Facts

Source: National Bridge Inventory. Information not verified; use at your own risk.
Name:OLD MADISON PIKE over INDIAN CREEK
Structure number:018741
Location:0.5 MILE EAST OF SLAUGHER
Purpose:Carries highway over waterway
Route classification:Local (Urban) [19]
Length of largest span:36.1 ft. [11.0 m]
Total length:118.4 ft. [36.1 m]
Roadway width between curbs:20.0 ft. [6.1 m]
Deck width edge-to-edge:22.0 ft. [6.7 m]
Owner:City or Municipal Highway Agency [04]
Year built:1936
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Number of main spans:4
Main spans material:Concrete [1]
Main spans design:Girder and floorbeam system [03]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Bituminous [6]

Latest Available Inspection: February 2013

Good/Fair/Poor Condition:Fair
Status:Posted for load [P]
Average daily traffic:16,600 [as of 2011]
Truck traffic:5% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Structural appraisal:Basically intolerable requiring high priority of replacement [2]
Deck geometry appraisal:Basically intolerable requiring high priority of replacement [2]
Water adequacy appraisal:Better than present minimum criteria [7]
Roadway alignment appraisal:Equal to present minimum criteria [6]
Channel protection:Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. [6]
Scour condition:Bridge foundations determined to be stable for assessed or calculated scour condition. [5]
Sufficiency rating:38.2
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$1,021,000

Previous Inspections

DateConditionDeckSuperstructureSubstructureADTSuff. Rating
February 2013FairSatisfactorySatisfactorySatisfactory1660038.2
February 2012FairSatisfactorySatisfactorySatisfactory1540039.2
February 2011FairSatisfactorySatisfactorySatisfactory1540029.6
February 2010FairSatisfactorySatisfactorySatisfactory1540029.6
March 2008FairFairSatisfactoryFair1670018.6
August 2006FairFairSatisfactoryFair1280018.6
August 2004FairSatisfactorySatisfactorySatisfactory1280030.8
August 2002FairSatisfactorySatisfactoryGood1280030.8