SH 27 over Prairie Creek
Facts
Source: National Bridge Inventory. Information not verified; use at your own risk.
Name: | SH 27 over Prairie Creek |
Structure number: | 000000000002950 |
Location: | 2.98 MI NE JCT OF SH 10 |
Purpose: | Carries highway over waterway |
Route classification: | Minor Arterial (Rural) [06] |
Length of largest span: | 27.9 ft. [8.5 m] |
Total length: | 84.0 ft. [25.6 m] |
Roadway width between curbs: | 24.0 ft. [7.3 m] |
Deck width edge-to-edge: | 28.5 ft. [8.7 m] |
Owner: | State Highway Agency [01] |
Year built: | 1955 |
Historic significance: | Bridge is not eligible for the National Register of Historic Places [5] |
Design load: | M 13.5 / H 15 [2] |
Number of main spans: | 3 |
Main spans material: | Concrete [1] |
Main spans design: | Slab [01] |
Deck type: | Concrete Cast-in-Place [1] |
Wearing surface: | Bituminous [6] |
Latest Available Inspection: May 2017
Good/Fair/Poor Condition: | Fair |
Status: | Open, no restriction [A] |
Average daily traffic: | 4,700 [as of 2014] |
Truck traffic: | 1% of total traffic |
Deck condition: | Good [7 out of 9] |
Superstructure condition: | Good [7 out of 9] |
Substructure condition: | Satisfactory [6 out of 9] |
Structural appraisal: | Equal to present minimum criteria [6] |
Deck geometry appraisal: | Basically intolerable requiring high priority of replacement [2] |
Water adequacy appraisal: | Equal to present desirable criteria [8] |
Roadway alignment appraisal: | Equal to present desirable criteria [8] |
Channel protection: | Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. [8] |
Pier/abutment protection: | Navigation protection not required [1] |
Scour condition: | Bridge foundations determined to be stable for assessed or calculated scour condition. [5] |
Sufficiency rating: | 64.3 |
Recommended work: | Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31] |
Estimated cost of work: | $711,000 |
Previous Inspections
Date | Condition | Deck | Superstructure | Substructure | ADT | Suff. Rating |
---|
May 2017 | Fair | Good | Good | Satisfactory | 4700 | 64.3 |
May 2015 | Fair | Good | Good | Satisfactory | 4100 | 65.0 |
May 2013 | Fair | Good | Good | Satisfactory | 4100 | 50.9 |
May 2011 | Fair | Good | Good | Satisfactory | 5200 | 49.3 |
April 2009 | Fair | Good | Good | Satisfactory | 5200 | 49.3 |
April 2007 | Fair | Good | Good | Satisfactory | 5400 | 49.0 |
April 2005 | Fair | Good | Good | Satisfactory | 5200 | 49.3 |
April 2003 | Good | Very Good | Very Good | Very Good | 5500 | 48.7 |
June 2001 | Good | Very Good | Very Good | Very Good | 4500 | 50.1 |
May 1999 | Good | Very Good | Very Good | Very Good | 4500 | 50.1 |
June 1997 | Fair | Very Good | Very Good | Satisfactory | 1855 | 56.0 |
June 1996 | Good | Very Good | Very Good | Good | 1855 | 56.0 |
June 1994 | Good | Very Good | Very Good | Good | 1855 | 56.0 |
June 1992 | Good | Very Good | Very Good | Good | 1855 | 56.0 |
May 1990 | Good | Very Good | Very Good | Very Good | 3218 | 51.9 |
Element Data
Source: National Bridge Elements dataset, 2019 edition. This feature is experimental.
Element | Units | Quantity | 1-Good | 2-Fair | 3-Poor | 4-Serious |
---|
Substructure |
Steel Column | each | 8 | 0 | 5 | 3 | 0 |
Reinforced Concrete Abutment | linear ft. | 58 | 58 | 0 | 0 | 0 |
Reinforced Concrete Pier Cap | linear ft. | 58 | 29 | 29 | 0 | 0 |
Bridge Rail |
Other Material Bridge Rail | linear ft. | 168 | 168 | 0 | 0 | 0 |
Deck |
Reinforced Concrete Slab | sq. ft. | 2,394 | 2,394 | 0 | 0 | 0 |