Share:

US 82 over MISSISSIPPI RIVER

This bridge is no longer in the current National Bridge Inventory database, and has likely been demolished or abandoned.

Map

Coordinates:
+33.29511, -91.15721
33°17'42" N, 91°09'26" W

Facts

Source: National Bridge Inventory. Information not verified; use at your own risk.
Name:US 82 over MISSISSIPPI RIVER
Structure number:0000000000M1536
Location:10 MI E LAKE VILLAGE
Purpose:Carries highway over waterway
Route classification:Principal Arterial - Other (Rural) [02]
Length of largest span:839.9 ft. [256.0 m]
Total length:9967.3 ft. [3037.9 m]
Roadway width between curbs:24.0 ft. [7.3 m]
Deck width edge-to-edge:24.0 ft. [7.3 m]
Vertical clearance above deck:18.0 ft. [5.5 m]
Vertical clearance below bridge:65.0 ft. [19.8 m]
Owner:State Highway Agency [01]
Year built:1940
Historic significance:Bridge is on the National Register of Historic Places [1]
Design load:M 13.5 / H 15 [2]
Number of main spans:3
Main spans material:Steel [3]
Main spans design:Truss - Thru [10]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Monolithic Concrete (concurrently placed with structural deck) [1]

Latest Available Inspection: November 2008

Good/Fair/Poor Condition:Poor
Status:Open, no restriction [A]
Average daily traffic:6,100 [as of 2008]
Truck traffic:14% of total traffic
Deck condition:Fair [5 out of 9]
Superstructure condition:Poor [4 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Structural appraisal:Meets minimum tolerable limits to be left in place as is [4]
Deck geometry appraisal:Basically intolerable requiring high priority of replacement [2]
Water adequacy appraisal:Equal to present desirable criteria [8]
Roadway alignment appraisal:Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Channel protection:Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. [6]
Pier/abutment protection:None present but re-evaluation suggested [5]
Scour condition:Bridge is scour critical; bridge foundations determined to be unstable. [3]
Sufficiency rating:25.8
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$32,000

Previous Inspections

DateConditionDeckSuperstructureSubstructureADTSuff. Rating
November 2008PoorFairPoorSatisfactory610025.8
July 1999FairSatisfactorySatisfactoryGood720043.5
January 1991GoodGoodGoodGood529044.5