Share:

State Highway 282 over Frog Bayou-Crawford Co.

Facts

Source: National Bridge Inventory. Information not verified; use at your own risk.
Name:State Highway 282 over Frog Bayou-Crawford Co.
Structure number:0000000000M2672
Location:3.06 MI N OF US71 & 15
Purpose:Carries highway over waterway
Route classification:Minor Collector (Rural) [08]
Length of largest span:15.1 ft. [4.6 m]
Total length:74.2 ft. [22.6 m]
Roadway width between curbs:20.0 ft. [6.1 m]
Deck width edge-to-edge:21.0 ft. [6.4 m]
Owner:State Highway Agency [01]
Year built:1935
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Number of main spans:5
Main spans material:Concrete [1]
Main spans design:Slab [01]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Monolithic Concrete (concurrently placed with structural deck) [1]

Latest Available Inspection: September 2017

Good/Fair/Poor Condition:Poor
Status:Open, no restriction [A]
Average daily traffic:240 [as of 2014]
Truck traffic:7% of total traffic
Deck condition:Fair [5 out of 9]
Superstructure condition:Poor [4 out of 9]
Substructure condition:Poor [4 out of 9]
Structural appraisal:Meets minimum tolerable limits to be left in place as is [4]
Deck geometry appraisal:Meets minimum tolerable limits to be left in place as is [4]
Water adequacy appraisal:Basically intolerable requiring high priority of corrrective action [3]
Roadway alignment appraisal:Meets minimum tolerable limits to be left in place as is [4]
Channel protection:Bank protection is being eroded. River control devices and/or embankment have major damage. Trees and rush restrict the channel. [5]
Pier/abutment protection:Navigation protection not required [1]
Scour condition:Bridge foundations determined to be stable for assessed or calculated scour condition. [5]
Sufficiency rating:32.7
Recommended work:Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Estimated cost of work:$76,000

Previous Inspections

DateConditionDeckSuperstructureSubstructureADTSuff. Rating
September 2017PoorFairPoorPoor24032.7
September 2015PoorFairPoorPoor18032.8
September 2014PoorFairPoorPoor18032.8
September 2013PoorFairPoorPoor18032.8
December 2011PoorFairPoorPoor18032.8
December 2010PoorFairFairPoor18032.8
December 2009PoorFairFairPoor18032.8
January 2009PoorFairFairPoor18032.8
February 2007FairFairFairFair30057.0
March 2005FairFairFairFair26057.0
April 2003FairFairFairFair20058.3
May 2001FairFairFairFair22058.3
May 1999FairFairFairFair22058.3
May 1997FairFairFairFair66054.7
February 1995FairFairFairFair66051.0
January 1994FairFairFairFair66051.0
May 1992FairSatisfactorySatisfactoryFair66051.0
June 1991FairFairFairFair70249.8

Element Data

Source: National Bridge Elements dataset, 2019 edition. This feature is experimental.
ElementUnitsQuantity1-Good2-Fair3-Poor4-Serious
Substructure
Masonry Pier Walllinear ft.1153564160
Masonry Abutmentlinear ft.46182134
Deck
Reinforced Concrete Slabsq. ft.1,4801,33281670