Service Road over Big Thompson River
This bridge is no longer in the current National Bridge Inventory database, and has likely been demolished or abandoned.
Map
Coordinates:
+40.39444, -105.8000040°23'40" N, 105°47'60" W
Facts
Source: National Bridge Inventory. Information not verified; use at your own risk.
Name: | Service Road over Big Thompson River |
Structure number: | LOVCO-FAIRGRNDS |
Location: | In Larimer Co Fairgrounds |
Purpose: | Carries highway over waterway |
Route classification: | Local (Rural) [09] |
Length of largest span: | 95.1 ft. [29.0 m] |
Total length: | 97.8 ft. [29.8 m] |
Roadway width between curbs: | 14.8 ft. [4.5 m] |
Deck width edge-to-edge: | 16.1 ft. [4.9 m] |
Vertical clearance above deck: | 17.4 ft. [5.3 m] |
Owner: | City or Municipal Highway Agency [04] |
Year built: | 1915 |
Year reconstructed: | 1994 |
Historic significance: | Bridge is possibly eligible for the National Register of Historic Places [3] |
Main span material: | Steel [3] |
Main span design: | Truss - Thru [10] |
Deck type: | Wood or Timber [8] |
Wearing surface: | Wood or Timber [7] |
Latest Available Inspection: February 2009
Good/Fair/Poor Condition: | Poor |
Status: | Posted for load [P] |
Average daily traffic: | 22 [as of 2007] |
Deck condition: | Fair [5 out of 9] |
Superstructure condition: | Serious [3 out of 9] |
Substructure condition: | Fair [5 out of 9] |
Structural appraisal: | Basically intolerable requiring high priority of corrrective action [3] |
Deck geometry appraisal: | Equal to present minimum criteria [6] |
Water adequacy appraisal: | Equal to present desirable criteria [8] |
Roadway alignment appraisal: | Equal to present minimum criteria [6] |
Channel protection: | Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7] |
Scour condition: | Bridge foundations determined to be stable for assessed or calculated scour condition. [5] |
Sufficiency rating: | 27.5 |
Recommended work: | Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31] |
Estimated cost of work: | $1,227,000 |
Previous Inspections
Date | Condition | Deck | Superstructure | Substructure | ADT | Suff. Rating |
---|
February 2009 | Poor | Fair | Serious | Fair | 22 | 27.5 |