Share:

COUNTY ROAD 3 over CRYSTAL RIVER

Map

Coordinates:
+39.18086, -107.24089
39°10'51" N, 107°14'27" W

Facts

Source: National Bridge Inventory. Information not verified; use at your own risk.
Name:COUNTY ROAD 3 over CRYSTAL RIVER
Structure number:PIT-003-00.1
Location:E SH133 REDSTONE/MP51.4
Purpose:Carries highway and pedestrian walkway over waterway
Route classification:Minor Collector (Rural) [08]
Length of largest span:38.1 ft. [11.6 m]
Total length:82.7 ft. [25.2 m]
Roadway width between curbs:24.3 ft. [7.4 m]
Deck width edge-to-edge:29.9 ft. [9.1 m]
Owner:County Highway Agency [02]
Year built:1947
Historic significance:Historical significance is not determinable at this time [4]
Number of main spans:2
Main spans material:Steel [3]
Main spans design:Stringer/Multi-beam or girder [02]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Monolithic Concrete (concurrently placed with structural deck) [1]

Latest Available Inspection: May 2018

Good/Fair/Poor Condition:Fair
Status:Open, no restriction [A]
Average daily traffic:528 [as of 2018]
Truck traffic:2% of total traffic
Deck condition:Fair [5 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Fair [5 out of 9]
Structural appraisal:Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck geometry appraisal:Meets minimum tolerable limits to be left in place as is [4]
Water adequacy appraisal:Better than present minimum criteria [7]
Roadway alignment appraisal:Equal to present desirable criteria [8]
Channel protection:Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. [8]
Scour condition:Bridge foundations determined to be stable for assessed or calculated scour conditions; field review indicates action is required. [4]
Sufficiency rating:60.4

Previous Inspections

DateConditionDeckSuperstructureSubstructureADTSuff. Rating
May 2018FairFairSatisfactoryFair52860.4
May 2016FairFairSatisfactoryFair52860.4
May 2014FairFairSatisfactoryFair52860.4
May 2012FairFairSatisfactoryFair33361.4
May 2010FairFairSatisfactoryFair33361.4
May 2008FairFairGoodFair75854.3
May 2006FairFairGoodSatisfactory75864.4
May 2004FairFairGoodSatisfactory75864.4
August 2001FairFairGoodSatisfactory75863.3
July 1999FairFairGoodFair75853.3
July 1997FairSatisfactoryGoodFair75854.3
August 1995FairSatisfactoryVery GoodFair107454.3
August 1993FairSatisfactoryVery GoodFair107466.4
September 1991FairSatisfactoryVery GoodSatisfactory107477.5

Element Data

Source: National Bridge Elements dataset, 2019 edition. This feature is experimental.
ElementUnitsQuantity1-Good2-Fair3-Poor4-Serious
Superstructure
Steel Girder/Beamlinear ft.414041400
Steel Protective Coatingsq. ft.414041400
Deck
Reinforced Concrete Decksq. ft.2,484002,4840
Substructure
Reinforced Concrete Columneach21100
Reinforced Concrete Abutmentlinear ft.6059010
Reinforced Concrete Pier Caplinear ft.6049650
Joints
Open Jointlinear ft.3002406
Bearings
Movable Bearingeach1001000
Steel Protective Coatingsq. ft.108002
Fixed Bearingeach1001000
Steel Protective Coatingsq. ft.100640
Bridge Rail
Reinforced Concrete Bridge Raillinear ft.166083830