ROUTE 190 over CONN RIVER & AMTRAK RR
Map
Coordinates:
+41.98978, -72.6032441°59'23" N, 72°36'12" W
Facts
Source: National Bridge Inventory. Information not verified; use at your own risk.
Name: | ROUTE 190 over CONN RIVER & AMTRAK RR |
Structure number: | 03295 |
Location: | 0.41 MI E OF OVLP RTE 159 |
Purpose: | Carries highway and pedestrian walkway over railroad and waterway |
Route classification: | Other Principal Arterial (Urban) [14] |
Length of largest span: | 200.1 ft. [61.0 m] |
Total length: | 1345.2 ft. [410.0 m] |
Roadway width between curbs: | 49.9 ft. [15.2 m] |
Deck width edge-to-edge: | 62.7 ft. [19.1 m] |
Vertical clearance below bridge: | 16.4 ft. [5.0 m] |
Owner: | State Highway Agency [01] |
Year built: | 1966 |
Year reconstructed: | 2007 |
Historic significance: | Bridge is not eligible for the National Register of Historic Places [5] |
Design load: | M 18 / H 20 [4] |
Number of main spans: | 8 |
Main spans material: | Steel continuous [4] |
Main spans design: | Girder and floorbeam system [03] |
Deck type: | Concrete Cast-in-Place [1] |
Wearing surface: | Bituminous [6] |
Latest Available Inspection: October 2017
Good/Fair/Poor Condition: | Poor |
Status: | Open, no restriction [A] |
Average daily traffic: | 24,300 [as of 2015] |
Truck traffic: | 6% of total traffic |
Deck condition: | Satisfactory [6 out of 9] |
Superstructure condition: | Poor [4 out of 9] |
Substructure condition: | Satisfactory [6 out of 9] |
Structural appraisal: | Meets minimum tolerable limits to be left in place as is [4] |
Deck geometry appraisal: | Equal to present minimum criteria [6] |
Underclearances appraisal: | Basically intolerable requiring high priority of corrrective action [3] |
Water adequacy appraisal: | Equal to present desirable criteria [8] |
Roadway alignment appraisal: | Equal to present desirable criteria [8] |
Channel protection: | Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7] |
Scour condition: | Bridge foundations determined to be stable for the assessed or calculated scour condition. [8] |
Sufficiency rating: | 53.3 |
Recommended work: | Bridge rehabilitation because of general structure deterioration or inadequate strength. [35] |
Estimated cost of work: | $3,000,000 |
Previous Inspections
Date | Condition | Deck | Superstructure | Substructure | ADT | Suff. Rating |
---|
October 2017 | Poor | Satisfactory | Poor | Satisfactory | 24300 | 53.3 |
October 2015 | Fair | Satisfactory | Fair | Satisfactory | 24300 | 69.3 |
October 2013 | Fair | Satisfactory | Fair | Satisfactory | 23400 | 69.2 |
October 2011 | Fair | Satisfactory | Fair | Satisfactory | 25500 | 50.2 |
November 2009 | Fair | Satisfactory | Fair | Satisfactory | 25500 | 50.2 |
September 2009 | Fair | Satisfactory | Fair | Satisfactory | 25500 | 50.2 |
April 2007 | Fair | Satisfactory | Fair | Satisfactory | 25500 | 50.2 |
April 2005 | Fair | Satisfactory | Fair | Satisfactory | 25700 | 50.2 |
March 2003 | Fair | Satisfactory | Satisfactory | Satisfactory | 24100 | 58.2 |
March 2001 | Fair | Satisfactory | Satisfactory | Good | 23500 | 61.2 |
March 1999 | Fair | Satisfactory | Satisfactory | Satisfactory | 24100 | 58.2 |
March 1997 | Fair | Satisfactory | Satisfactory | Satisfactory | 25200 | 59.2 |
March 1995 | Fair | Satisfactory | Satisfactory | Satisfactory | 25400 | 60.0 |
April 1993 | Fair | Satisfactory | Satisfactory | Fair | 26900 | 49.0 |
April 1991 | Fair | Satisfactory | Satisfactory | Fair | 24700 | 49.0 |