SR-76 over POPPOLTON CREEK

Map

Coordinates:
+27.18804, -80.25307
27°11'17" N, 80°15'11" W

Facts

Source: National Bridge Inventory. Information not verified; use at your own risk.
Name:SR-76 over POPPOLTON CREEK
Structure number:890048
Location:By Indian Grove Dr.
Purpose:Carries highway and pedestrian walkway over waterway
Route classification:Other Principal Arterial (Urban) [14]
Length of largest span:9.8 ft. [3.0 m]
Total length:20.7 ft. [6.3 m]
Owner:State Highway Agency [01]
Year built:1956
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18+Mod / HS 20+Mod [6]
Number of main spans:2
Main spans material:Concrete [1]
Main spans design:Culvert [19]
Deck type:Not applicable [N]

Latest Available Inspection: November 2018

Good/Fair/Poor Condition:Fair
Status:Open, no restriction [A]
Average daily traffic:32,500 [as of 2018]
Truck traffic:4% of total traffic
Structural appraisal:Equal to present minimum criteria [6]
Water adequacy appraisal:Superior to present desirable criteria [9]
Roadway alignment appraisal:Equal to present desirable criteria [8]
Channel protection:Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7]
Pier/abutment protection:Navigation protection not required [1]
Culvert condition:Deterioration or initial disintegration, minor chloride contamination, cracking with some leaching, or spalls on concrete or masonry walls and slabs. Local minor scouring at curtain walls, wingwalls or pipes. Metal culverts have a smooth curvature, non-symmetrical shape, significant corrosion or moderate pitting. [6]
Scour condition:Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Sufficiency rating:76.5

Previous Inspections

DateConditionCulvert ConditionADTSuff. Rating
November 2018Fair6 out of 103250076.5
November 2016Fair6 out of 103300076.4
November 2014Fair6 out of 103200076.5
November 2012Fair6 out of 102750078.9
November 2010Fair6 out of 102950078.6
November 2008Fair6 out of 103100078.5
November 2006Fair6 out of 102700078.9
November 2004Fair6 out of 103250078.3
April 2001Fair6 out of 102500079.2
January 1999Fair6 out of 102200082.5
April 1997Fair6 out of 102200078.2
June 1995Fair6 out of 102200078.0
April 1993Good7 out of 102002878.4
May 1991Good7 out of 102623977.2

Element Data

Source: National Bridge Elements dataset, 2019 edition. This feature is experimental.
ElementUnitsQuantity1-Good2-Fair3-Poor4-Serious
Culvert
Reinforced Concrete Culvertlinear ft.23095104310
Bridge Rail
Steel or Aluminum Bridge Raillinear ft.4242000
Steel Protective Coatingsq. ft.4242000