Facts

Source: National Bridge Inventory. Information not verified; use at your own risk.
Name:BANDY ROAD over EAST CHICKAMAUGA CREEK
Structure number:000000004700550
Location:4 MI SOUTH OF RINGGOLD
Purpose:Carries highway over waterway
Route classification:Major Collector (Rural) [07]
Length of largest span:36.1 ft. [11.0 m]
Total length:144.0 ft. [43.9 m]
Roadway width between curbs:28.5 ft. [8.7 m]
Deck width edge-to-edge:31.8 ft. [9.7 m]
Skew angle:35°
Owner:County Highway Agency [02]
Year built:1976
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18+Mod / HS 20+Mod [6]
Number of main spans:4
Main spans material:Concrete [1]
Main spans design:Tee beam [04]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Monolithic Concrete (concurrently placed with structural deck) [1]

Latest Available Inspection: December 2017

Good/Fair/Poor Condition:Good
Status:Open, no restriction [A]
Average daily traffic:1,030 [as of 2011]
Truck traffic:1% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Structural appraisal:Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck geometry appraisal:Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Water adequacy appraisal:Superior to present desirable criteria [9]
Roadway alignment appraisal:Equal to present desirable criteria [8]
Channel protection:Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7]
Scour condition:Bridge with "unknown" foundation that has not been evaluated for scour. [U]
Sufficiency rating:76.8
Estimated cost of work:$844,000

Previous Inspections

DateConditionDeckSuperstructureSubstructureADTSuff. Rating
December 2017GoodGoodGoodGood103076.8
December 2016GoodGoodGoodGood103076.8
December 2014GoodGoodGoodGood103076.8
December 2012GoodGoodGoodGood103076.8
November 2010GoodGoodGoodGood117076.8
January 2009GoodGoodGoodGood117092.4
December 2006GoodGoodGoodGood117092.4
November 2004GoodGoodGoodGood120092.4
December 2002GoodGoodGoodGood170092.2
October 2000GoodGoodGoodGood120092.4
February 1999GoodGoodGoodGood120092.4
November 1996GoodVery GoodVery GoodVery Good120092.4
October 1994GoodVery GoodVery GoodVery Good90092.3
December 1992GoodVery GoodVery GoodVery Good89092.3
November 1990GoodVery GoodVery GoodVery Good84092.3

Element Data

Source: National Bridge Elements dataset, 2019 edition. This feature is experimental.
ElementUnitsQuantity1-Good2-Fair3-Poor4-Serious
Superstructure
Reinforced Concrete Girder/Beamlinear ft.576576000
Deck
Reinforced Concrete Top Flangesq. ft.4,5804,580000
Substructure
Reinforced Concrete Columneach22000
Reinforced Concrete Abutmentlinear ft.7474000
Steel Pileeach88000
Steel Protective Coatingsq. ft.454454000
Reinforced Concrete Pier Caplinear ft.105105000
Joints
Pourable Jointlinear ft.1751057000
Bridge Rail
Reinforced Concrete Bridge Raillinear ft.288288000