SR 284 over CHATT RIV (LAKE LANIER)
This bridge is no longer in the current National Bridge Inventory database, and has likely been demolished or abandoned.
Map
Coordinates:
+34.34942, -83.7947434°20'58" N, 83°47'41" W
Facts
Source: National Bridge Inventory. Information not verified; use at your own risk.
Name: | SR 284 over CHATT RIV (LAKE LANIER) |
Structure number: | 000000013900360 |
Location: | 4 MI N OF GAINESVILLE |
Purpose: | Carries highway over waterway |
Route classification: | Major Collector (Rural) [07] |
Length of largest span: | 99.7 ft. [30.4 m] |
Total length: | 834.0 ft. [254.2 m] |
Roadway width between curbs: | 24.0 ft. [7.3 m] |
Deck width edge-to-edge: | 29.9 ft. [9.1 m] |
Skew angle: | 99° |
Owner: | State Highway Agency [01] |
Year built: | 1958 |
Historic significance: | Bridge is not eligible for the National Register of Historic Places [5] |
Design load: | M 13.5 / H 15 [2] |
Number of main spans: | 11 |
Main spans material: | Steel continuous [4] |
Main spans design: | Stringer/Multi-beam or girder [02] |
Deck type: | Concrete Cast-in-Place [1] |
Wearing surface: | Monolithic Concrete (concurrently placed with structural deck) [1] |
Latest Available Inspection: June 2013
Good/Fair/Poor Condition: | Fair |
Status: | Open, no restriction [A] |
Average daily traffic: | 6,050 [as of 2012] |
Truck traffic: | 1% of total traffic |
Deck condition: | Fair [5 out of 9] |
Superstructure condition: | Satisfactory [6 out of 9] |
Substructure condition: | Fair [5 out of 9] |
Structural appraisal: | Meets minimum tolerable limits to be left in place as is [4] |
Deck geometry appraisal: | Basically intolerable requiring high priority of replacement [2] |
Water adequacy appraisal: | Superior to present desirable criteria [9] |
Roadway alignment appraisal: | Better than present minimum criteria [7] |
Channel protection: | Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. [8] |
Scour condition: | Bridge with "unknown" foundation that has not been evaluated for scour. [U] |
Sufficiency rating: | 42.0 |
Recommended work: | Widening of existing bridge with deck rehabilitation or replacement. [34] |
Estimated cost of work: | $4,888,000 |
Previous Inspections
Date | Condition | Deck | Superstructure | Substructure | ADT | Suff. Rating |
---|
June 2013 | Fair | Fair | Satisfactory | Fair | 6050 | 42.0 |
June 2012 | Fair | Fair | Satisfactory | Fair | 6130 | 41.9 |
May 2011 | Fair | Fair | Satisfactory | Fair | 6130 | 41.9 |
June 2009 | Fair | Fair | Satisfactory | Fair | 8080 | 39.3 |
May 2007 | Fair | Fair | Satisfactory | Fair | 7140 | 40.5 |
May 2005 | Fair | Fair | Good | Fair | 7850 | 39.6 |
June 2003 | Fair | Fair | Good | Satisfactory | 8200 | 48.6 |
June 2001 | Fair | Fair | Good | Satisfactory | 8000 | 48.8 |
August 1999 | Fair | Fair | Good | Satisfactory | 6900 | 49.9 |
July 1997 | Fair | Fair | Good | Satisfactory | 6100 | 50.8 |
June 1995 | Fair | Fair | Satisfactory | Satisfactory | 5700 | 50.8 |
May 1993 | Fair | Fair | Satisfactory | Satisfactory | 4930 | 52.8 |
May 1991 | Fair | Satisfactory | Satisfactory | Fair | 4930 | 45.5 |