TR 73 over BEAR CRK.
Map
Coordinates:
+40.14557, -91.2325540°08'44" N, 91°13'57" W
Facts
Source: National Bridge Inventory. Information not verified; use at your own risk.
Name: | TR 73 over BEAR CRK. |
Structure number: | 001307100000000 |
Old structure number: | 000001307100712 (from 1992 edition) |
Location: | 0.5 MI SW LORAINE |
Purpose: | Carries highway over waterway |
Route classification: | Local (Rural) [09] |
Length of largest span: | 82.0 ft. [25.0 m] |
Total length: | 85.0 ft. [25.9 m] |
Roadway width between curbs: | 15.7 ft. [4.8 m] |
Deck width edge-to-edge: | 16.1 ft. [4.9 m] |
Owner: | Town or Township Highway Agency [03] |
Year built: | 1905 |
Historic significance: | Bridge is not eligible for the National Register of Historic Places [5] |
Main span material: | Steel [3] |
Main span design: | Truss - Thru [10] |
Deck type: | Concrete Cast-in-Place [1] |
Latest Available Inspection: April 2016
Good/Fair/Poor Condition: | Poor |
Status: | Bridge closed to all traffic [K] |
Average daily traffic: | 50 [as of 2008] |
Truck traffic: | 36% of total traffic |
Deck condition: | Poor [4 out of 9] |
Superstructure condition: | Poor [4 out of 9] |
Substructure condition: | Serious [3 out of 9] |
Deck geometry appraisal: | Equal to present desirable criteria [8] |
Water adequacy appraisal: | Somewhat better than minimum adequacy to tolerate being left in place as is [5] |
Roadway alignment appraisal: | Basically intolerable requiring high priority of corrrective action [3] |
Channel protection: | Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. [6] |
Scour condition: | Bridge foundations determined to be stable for assessed or calculated scour condition. [5] |
Sufficiency rating: | 24.1 |
Recommended work: | Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31] |
Estimated cost of work: | $180,000 |
Previous Inspections
Date | Condition | Deck | Superstructure | Substructure | ADT | Suff. Rating |
---|
April 2016 | Poor | Poor | Poor | Serious | 50 | 24.1 |
April 2014 | Poor | Serious | Serious | Critical | 50 | 23.1 |
March 2012 | Poor | Serious | Serious | Critical | 50 | 23.1 |
March 2010 | Poor | Serious | Serious | Critical | 50 | 23.1 |
February 2008 | Poor | Serious | Serious | Critical | 25 | 23.2 |
March 2005 | Poor | Serious | Serious | Critical | 25 | 23.2 |
March 2003 | Poor | Serious | Serious | Critical | 25 | 23.2 |
February 2002 | Poor | Poor | Serious | Critical | 25 | 24.2 |
January 2000 | Poor | Poor | Serious | Critical | 50 | 24.1 |
2000 | Poor | Poor | Serious | Critical | 50 | 24.1 |
January 1998 | Poor | Poor | Serious | Critical | 50 | 24.1 |
February 1996 | Poor | Poor | Serious | Serious | 50 | 19.2 |
February 1994 | Poor | Poor | Serious | Poor | 175 | 18.2 |
February 1992 | Poor | Fair | Poor | Poor | 175 | 34.2 |