DIVISION ST (RIVER over N BR CHI RIVER
Map
Coordinates:
+41.90000, -87.6400041°53'60" N, 87°38'24" W
Facts
Source: National Bridge Inventory. Information not verified; use at your own risk.
Name: | DIVISION ST (RIVER over N BR CHI RIVER |
Structure number: | 016601600000000 |
Old structure number: | 000016601626638 (from 1992 edition) |
Location: | 1129 W DIVISION |
Purpose: | Carries highway over waterway |
Route classification: | Collector (Urban) [17] |
Length of largest span: | 172.3 ft. [52.5 m] |
Total length: | 262.8 ft. [80.1 m] |
Roadway width between curbs: | 36.1 ft. [11.0 m] |
Deck width edge-to-edge: | 60.0 ft. [18.3 m] |
Vertical clearance below bridge: | 16.4 ft. [5.0 m] |
Owner: | City or Municipal Highway Agency [04] |
Year built: | 1904 |
Year reconstructed: | 1992 |
Historic significance: | Bridge is possibly eligible for the National Register of Historic Places [3] |
Design load: | MS 18 / HS 20 [5] |
Main span material: | Steel [3] |
Main span design: | Movable - Bascule [16] |
Deck type: | Open Grating [3] |
Wearing surface: | Other [9] |
Latest Available Inspection: September 2017
Good/Fair/Poor Condition: | Poor |
Status: | Open, no restriction [A] |
Average daily traffic: | 7,950 [as of 2014] |
Truck traffic: | 12% of total traffic |
Deck condition: | Good [7 out of 9] |
Superstructure condition: | Poor [4 out of 9] |
Substructure condition: | Satisfactory [6 out of 9] |
Structural appraisal: | Meets minimum tolerable limits to be left in place as is [4] |
Deck geometry appraisal: | Meets minimum tolerable limits to be left in place as is [4] |
Water adequacy appraisal: | Superior to present desirable criteria [9] |
Roadway alignment appraisal: | Equal to present desirable criteria [8] |
Channel protection: | Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7] |
Pier/abutment protection: | In place and functioning [2] |
Scour condition: | Bridge foundations determined to be stable for the assessed or calculated scour condition. [8] |
Sufficiency rating: | 56.8 |
Recommended work: | Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31] |
Estimated cost of work: | $1,647,000 |
Previous Inspections
Date | Condition | Deck | Superstructure | Substructure | ADT | Suff. Rating |
---|
September 2017 | Poor | Good | Poor | Satisfactory | 7950 | 56.8 |
September 2015 | Fair | Good | Fair | Satisfactory | 15900 | 65.0 |
September 2013 | Fair | Good | Fair | Satisfactory | 15900 | 65.0 |
September 2011 | Fair | Good | Satisfactory | Satisfactory | 16100 | 73.0 |
January 2010 | Good | Good | Good | Good | 16100 | 73.0 |
October 2007 | Good | Good | Good | Good | 16600 | 73.0 |
November 2005 | Good | Good | Good | Good | 13300 | 73.2 |
October 2003 | Good | Good | Good | Good | 13300 | 73.2 |
October 2001 | Good | Good | Good | Good | 13300 | 73.2 |
September 1999 | Good | Good | Good | Good | 38900 | 71.6 |
September 1997 | Good | Good | Good | Good | 38900 | 71.6 |
October 1995 | Good | Excellent | Very Good | Good | 11900 | 72.8 |
April 1994 | Good | Excellent | Very Good | Good | 11900 | 72.8 |
March 1992 | Poor | Serious | Serious | Serious | 16400 | 23.0 |