RICHWOODS BLVD over BIG HOLLOW CREEK

This bridge is no longer in the current National Bridge Inventory database, and has likely been demolished or abandoned.

Map

Coordinates:
+40.73548, -89.65876
40°44'08" N, 89°39'32" W

Facts

Source: National Bridge Inventory. Information not verified; use at your own risk.
Name:RICHWOODS BLVD over BIG HOLLOW CREEK
Structure number:072300200000000
Old structure number:000072300216493 (from 1992 edition)
Location:W1/2-25-KICKAPOO
Purpose:Carries highway over waterway
Route classification:Local (Urban) [19]
Length of largest span:11.2 ft. [3.4 m]
Total length:82.0 ft. [25.0 m]
Roadway width between curbs:14.1 ft. [4.3 m]
Deck width edge-to-edge:15.1 ft. [4.6 m]
Owner:Town or Township Highway Agency [03]
Year built:1929
Year reconstructed:1961
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Number of main spans:7
Main spans material:Concrete continuous [2]
Main spans design:Slab [01]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Bituminous [6]

Latest Available Inspection: September 2016

Good/Fair/Poor Condition:Poor
Status:Bridge closed to all traffic [K]
Average daily traffic:150 [as of 2012]
Truck traffic:13% of total traffic
Deck condition:Critical [2 out of 9]
Superstructure condition:Critical [2 out of 9]
Substructure condition:Poor [4 out of 9]
Water adequacy appraisal:Meets minimum tolerable limits to be left in place as is [4]
Roadway alignment appraisal:Basically intolerable requiring high priority of corrrective action [3]
Channel protection:Bank protection has failed. River control devices have been destroyed. Stream bed aggradation, degradation or lateral movement has changed the channel to now threaten the bridge and/or approach roadway. [3]
Scour condition:Bridge foundations determined to be stable for assessed or calculated scour conditions; field review indicates action is required. [4]
Sufficiency rating:16.4
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$162,000

Previous Inspections

DateConditionDeckSuperstructureSubstructureADTSuff. Rating
September 2016PoorCriticalCriticalPoor15016.4
October 2014PoorCriticalCriticalPoor15016.4
October 2012PoorCriticalCriticalPoor15016.4
March 2011PoorPoorPoorPoor17539.5
December 2008PoorPoorPoorPoor17539.5
March 2006PoorPoorPoorPoor27539.5
December 2003PoorPoorPoorPoor27539.5
November 2001PoorPoorPoorPoor15039.5
June 2000PoorPoorPoorSatisfactory15039.5
October 1999PoorPoorPoorSatisfactory15039.5
September 1998PoorPoorPoorPoor10041.5
April 1996PoorPoorSeriousPoor10025.5
September 1993PoorPoorSeriousCritical10017.8
March 1991PoorSeriousSeriousCritical10016.7