Share:

CR 500W over SUGAR Creek

This bridge is no longer in the current National Bridge Inventory database, and has likely been demolished or abandoned.

Map

Coordinates:
+40.69889, -87.41972
40°41'56" N, 87°25'11" W

Facts

Source: National Bridge Inventory. Information not verified; use at your own risk.
Name:CR 500W over SUGAR Creek
Structure number:0400004
Location:0.7 S of CR 700N
Purpose:Carries highway over waterway
Route classification:Local (Rural) [09]
Length of largest span:41.0 ft. [12.5 m]
Total length:44.3 ft. [13.5 m]
Roadway width between curbs:18.7 ft. [5.7 m]
Deck width edge-to-edge:20.3 ft. [6.2 m]
Owner:County Highway Agency [02]
Year built:1930
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Main span material:Concrete [1]
Main span design:Stringer/Multi-beam or girder [02]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Bituminous [6]

Latest Available Inspection: May 2009

Good/Fair/Poor Condition:Poor
Status:Posted for load [P]
Average daily traffic:66 [as of 2009]
Truck traffic:8% of total traffic
Deck condition:Fair [5 out of 9]
Superstructure condition:Poor [4 out of 9]
Substructure condition:Poor [4 out of 9]
Structural appraisal:Basically intolerable requiring high priority of replacement [2]
Deck geometry appraisal:Meets minimum tolerable limits to be left in place as is [4]
Water adequacy appraisal:Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Roadway alignment appraisal:Better than present minimum criteria [7]
Channel protection:Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. [6]
Scour condition:Bridge foundations determined to be stable for assessed or calculated scour conditions; field review indicates action is required. [4]
Sufficiency rating:31.9
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$243,000

Previous Inspections

DateConditionDeckSuperstructureSubstructureADTSuff. Rating
May 2009PoorFairPoorPoor6631.9
March 1998PoorSatisfactoryFairPoor5045.2
July 1990PoorSatisfactorySatisfactoryPoor10041.4