CR 250W over LATTAS CREEK
Map
Coordinates:
+39.03383, -86.9873739°02'02" N, 86°59'15" W
Facts
Source: National Bridge Inventory. Information not verified; use at your own risk.
Name: | CR 250W over LATTAS CREEK |
Structure number: | 2800087 |
Location: | 00.40 N of SR 54 |
Purpose: | Carries highway over waterway |
Route classification: | Local (Rural) [09] |
Length of largest span: | 55.4 ft. [16.9 m] |
Total length: | 60.4 ft. [18.4 m] |
Roadway width between curbs: | 15.7 ft. [4.8 m] |
Deck width edge-to-edge: | 15.7 ft. [4.8 m] |
Owner: | County Highway Agency [02] |
Year built: | 1917 |
Historic significance: | Bridge is not eligible for the National Register of Historic Places [5] |
Main span material: | Steel [3] |
Main span design: | Truss - Thru [10] |
Deck type: | Concrete Cast-in-Place [1] |
Wearing surface: | Monolithic Concrete (concurrently placed with structural deck) [1] |
Latest Available Inspection: July 2018
Good/Fair/Poor Condition: | Poor |
Status: | Posted for load [P] |
Average daily traffic: | 160 [as of 2011] |
Truck traffic: | 2% of total traffic |
Deck condition: | Serious [3 out of 9] |
Superstructure condition: | Poor [4 out of 9] |
Substructure condition: | Satisfactory [6 out of 9] |
Structural appraisal: | Meets minimum tolerable limits to be left in place as is [4] |
Deck geometry appraisal: | Basically intolerable requiring high priority of corrrective action [3] |
Water adequacy appraisal: | Equal to present minimum criteria [6] |
Roadway alignment appraisal: | Equal to present minimum criteria [6] |
Channel protection: | Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. [6] |
Scour condition: | Bridge foundations determined to be stable for assessed or calculated scour condition. [5] |
Sufficiency rating: | 21.3 |
Recommended work: | Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31] |
Estimated cost of work: | $500,000 |
Previous Inspections
Date | Condition | Deck | Superstructure | Substructure | ADT | Suff. Rating |
---|
July 2018 | Poor | Serious | Poor | Satisfactory | 160 | 21.3 |
July 2017 | Poor | Serious | Poor | Satisfactory | 160 | 21.3 |
July 2016 | Poor | Serious | Poor | Satisfactory | 160 | 29.0 |
August 2015 | Poor | Poor | Poor | Satisfactory | 160 | 31.0 |
August 2013 | Poor | Poor | Poor | Satisfactory | 160 | 29.0 |
August 2011 | Poor | Poor | Poor | Satisfactory | 160 | 31.6 |
July 2009 | Poor | Poor | Fair | Satisfactory | 160 | 47.7 |
February 2007 | Fair | Fair | Fair | Satisfactory | 160 | 46.7 |
January 2005 | Fair | Fair | Fair | Satisfactory | 160 | 54.9 |
November 2002 | Fair | Fair | Fair | Satisfactory | 160 | 51.0 |
July 2001 | Fair | Fair | Fair | Satisfactory | 150 | 51.0 |
November 1998 | Fair | Fair | Fair | Satisfactory | 150 | 51.0 |
December 1996 | Fair | Fair | Fair | Satisfactory | 150 | 51.0 |
October 1994 | Fair | Fair | Fair | Satisfactory | 150 | 56.6 |
September 1992 | Fair | Fair | Fair | Satisfactory | 150 | 51.6 |
August 1990 | Poor | Poor | Satisfactory | Good | 200 | 45.0 |