LOCAL RD. 16-F.5 over ROSE CREEK
This bridge is no longer in the current National Bridge Inventory database, and has likely been demolished or abandoned.
Map
Coordinates:
+39.92187, -97.6515639°55'19" N, 97°39'06" W
Facts
Source: National Bridge Inventory. Information not verified; use at your own risk.
Name: | LOCAL RD. 16-F.5 over ROSE CREEK |
Structure number: | 000790787003105 |
Location: | 0.5N 6.0W OF MUNDEN |
Purpose: | Carries highway over waterway |
Route classification: | Local (Rural) [09] |
Length of largest span: | 29.9 ft. [9.1 m] |
Total length: | 32.2 ft. [9.8 m] |
Roadway width between curbs: | 16.1 ft. [4.9 m] |
Deck width edge-to-edge: | 16.1 ft. [4.9 m] |
Owner: | County Highway Agency [02] |
Historic significance: | Bridge is possibly eligible for the National Register of Historic Places [3] |
Design load: | M 9 / H 10 [1] |
Main span material: | Steel [3] |
Main span design: | Truss - Thru [10] |
Deck type: | Wood or Timber [8] |
Wearing surface: | Other [9] |
Latest Available Inspection: September 2014
Good/Fair/Poor Condition: | Poor |
Status: | Posted for load [P] |
Average daily traffic: | 10 [as of 2014] |
Deck condition: | Satisfactory [6 out of 9] |
Superstructure condition: | Poor [4 out of 9] |
Substructure condition: | Serious [3 out of 9] |
Structural appraisal: | Basically intolerable requiring high priority of replacement [2] |
Deck geometry appraisal: | Basically intolerable requiring high priority of corrrective action [3] |
Water adequacy appraisal: | Somewhat better than minimum adequacy to tolerate being left in place as is [5] |
Roadway alignment appraisal: | Equal to present desirable criteria [8] |
Channel protection: | Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. [6] |
Scour condition: | Bridge foundations determined to be stable for assessed or calculated scour conditions; field review indicates action is required. [4] |
Sufficiency rating: | 23.5 |
Recommended work: | Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31] |
Estimated cost of work: | $230,000 |
Previous Inspections
Date | Condition | Deck | Superstructure | Substructure | ADT | Suff. Rating |
---|
September 2014 | Poor | Satisfactory | Poor | Serious | 10 | 23.5 |
August 2013 | Poor | Satisfactory | Poor | Serious | 10 | 23.5 |
August 2012 | Poor | Satisfactory | Poor | Serious | 10 | 23.5 |
September 2011 | Poor | Satisfactory | Poor | Serious | 10 | 23.5 |
October 2010 | Poor | Satisfactory | Poor | Serious | 10 | 23.5 |
September 2008 | Poor | Satisfactory | Poor | Serious | 10 | 23.5 |
October 2007 | Poor | Satisfactory | Poor | Poor | 10 | 24.5 |
September 2006 | Poor | Satisfactory | Poor | Poor | 10 | 24.5 |
October 2004 | Poor | Satisfactory | Poor | Fair | 10 | 24.5 |
October 2002 | Poor | Satisfactory | Poor | Fair | 10 | 24.5 |
September 2000 | Poor | Satisfactory | Poor | Fair | 10 | 24.5 |
December 1998 | Poor | Satisfactory | Poor | Fair | 10 | 24.5 |
January 1997 | Poor | Satisfactory | Poor | Poor | 10 | 22.5 |
March 1995 | Poor | Satisfactory | Poor | Good | 10 | 22.5 |
March 1993 | Poor | Fair | Poor | Good | 10 | 21.5 |
March 1991 | Poor | Satisfactory | Poor | Good | 10 | 20.5 |