Facts
Source: National Bridge Inventory. Information not verified; use at your own risk.
Name: | OLD US 150 over DOCTORS FORK |
Structure number: | 011B00013N |
Old structure number: | 011*0150*B0013 (from 1992 edition) |
Location: | 2 MI W OF JCT KY 1920 |
Purpose: | Carries highway over waterway |
Route classification: | Local (Rural) [09] |
Length of largest span: | 29.9 ft. [9.1 m] |
Total length: | 65.9 ft. [20.1 m] |
Roadway width between curbs: | 23.0 ft. [7.0 m] |
Deck width edge-to-edge: | 25.9 ft. [7.9 m] |
Owner: | State Highway Agency [01] |
Year built: | 1928 |
Historic significance: | Bridge is not eligible for the National Register of Historic Places [5] |
Design load: | M 13.5 / H 15 [2] |
Number of main spans: | 2 |
Main spans material: | Concrete [1] |
Main spans design: | Tee beam [04] |
Deck type: | Concrete Cast-in-Place [1] |
Wearing surface: | Latex Concrete or similar additive [3] |
Latest Available Inspection: October 2008
Good/Fair/Poor Condition: | Fair |
Status: | Open, no restriction [A] |
Average daily traffic: | 2,329 [as of 2006] |
Deck condition: | Satisfactory [6 out of 9] |
Superstructure condition: | Fair [5 out of 9] |
Substructure condition: | Satisfactory [6 out of 9] |
Structural appraisal: | Somewhat better than minimum adequacy to tolerate being left in place as is [5] |
Deck geometry appraisal: | Basically intolerable requiring high priority of replacement [2] |
Water adequacy appraisal: | Better than present minimum criteria [7] |
Roadway alignment appraisal: | Equal to present minimum criteria [6] |
Channel protection: | Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7] |
Pier/abutment protection: | Navigation protection not required [1] |
Scour condition: | Bridge foundations determined to be stable for the assessed or calculated scour condition. [8] |
Sufficiency rating: | 63.8 |
Recommended work: | Widening of existing bridge with deck rehabilitation or replacement. [34] |
Estimated cost of work: | $214,000 |
Previous Inspections
Date | Condition | Deck | Superstructure | Substructure | ADT | Suff. Rating |
---|
October 2008 | Fair | Satisfactory | Fair | Satisfactory | 2329 | 63.8 |
October 1998 | Good | Good | Good | Good | 2245 | 73.4 |
October 1990 | Good | Good | Good | Good | 1996 | 73.7 |