KY-90 over DUTCH CREEK
Map
Coordinates:
+36.81833, -85.4483336°49'06" N, 85°26'54" W
Facts
Source: National Bridge Inventory. Information not verified; use at your own risk.
Name: | KY-90 over DUTCH CREEK |
Structure number: | 029B00020N |
Old structure number: | 029*0090*B0020 (from 1992 edition) |
Location: | .35 MI EAST OF JCT KY 100 |
Purpose: | Carries highway over waterway |
Route classification: | Minor Arterial (Rural) [06] |
Length of largest span: | 35.1 ft. [10.7 m] |
Total length: | 151.9 ft. [46.3 m] |
Roadway width between curbs: | 24.0 ft. [7.3 m] |
Deck width edge-to-edge: | 25.9 ft. [7.9 m] |
Owner: | State Highway Agency [01] |
Year built: | 1942 |
Historic significance: | Bridge is not eligible for the National Register of Historic Places [5] |
Design load: | M 13.5 / H 15 [2] |
Number of main spans: | 4 |
Main spans material: | Concrete [1] |
Main spans design: | Tee beam [04] |
Deck type: | Concrete Cast-in-Place [1] |
Wearing surface: | Latex Concrete or similar additive [3] |
Latest Available Inspection: March 2018
Good/Fair/Poor Condition: | Fair |
Status: | Posted for load [P] |
Average daily traffic: | 2,989 [as of 2016] |
Truck traffic: | 5% of total traffic |
Deck condition: | Fair [5 out of 9] |
Superstructure condition: | Fair [5 out of 9] |
Substructure condition: | Satisfactory [6 out of 9] |
Structural appraisal: | Somewhat better than minimum adequacy to tolerate being left in place as is [5] |
Deck geometry appraisal: | Basically intolerable requiring high priority of replacement [2] |
Water adequacy appraisal: | Superior to present desirable criteria [9] |
Roadway alignment appraisal: | Equal to present desirable criteria [8] |
Channel protection: | Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7] |
Scour condition: | Bridge foundations determined to be stable for the assessed or calculated scour condition. [8] |
Sufficiency rating: | 51.9 |
Recommended work: | Widening of existing bridge with deck rehabilitation or replacement. [34] |
Estimated cost of work: | $494,000 |
Previous Inspections
Date | Condition | Deck | Superstructure | Substructure | ADT | Suff. Rating |
---|
March 2018 | Fair | Fair | Fair | Satisfactory | 2989 | 51.9 |
March 2016 | Fair | Fair | Fair | Satisfactory | 2636 | 55.7 |
March 2014 | Fair | Fair | Fair | Satisfactory | 2636 | 55.7 |
March 2012 | Fair | Fair | Fair | Good | 3240 | 52.9 |
March 2010 | Fair | Fair | Fair | Good | 3200 | 53.1 |
March 2008 | Fair | Fair | Fair | Good | 3240 | 52.9 |
March 2006 | Fair | Fair | Fair | Good | 3371 | 52.6 |
March 2004 | Fair | Satisfactory | Fair | Good | 3247 | 54.0 |
March 2002 | Fair | Satisfactory | Satisfactory | Good | 3247 | 65.4 |
March 2000 | Fair | Satisfactory | Satisfactory | Good | 3247 | 65.4 |
March 1998 | Fair | Satisfactory | Satisfactory | Good | 3247 | 62.4 |
March 1996 | Good | Good | Good | Good | 3247 | 62.4 |
March 1994 | Good | Good | Good | Good | 2185 | 66.3 |
March 1992 | Good | Good | Good | Good | 2185 | 66.3 |
March 1990 | Good | Good | Good | Good | 2185 | 66.3 |
Element Data
Source: National Bridge Elements dataset, 2019 edition. This feature is experimental.
Element | Units | Quantity | 1-Good | 2-Fair | 3-Poor | 4-Serious |
---|
Superstructure |
Reinforced Concrete Girder/Beam | linear ft. | 560 | 500 | 36 | 24 | 0 |
Deck |
Reinforced Concrete Top Flange | sq. ft. | 3,937 | 2,473 | 1,400 | 64 | 0 |
Wearing Surfaces | sq. ft. | 3,643 | 2,445 | 1,158 | 40 | 0 |
Substructure |
Reinforced Concrete Column | each | 6 | 2 | 3 | 1 | 0 |
Reinforced Concrete Abutment | linear ft. | 64 | 47 | 14 | 3 | 0 |
Reinforced Concrete Pier Cap | linear ft. | 84 | 52 | 20 | 12 | 0 |
Joints |
Pourable Joint | linear ft. | 63 | 0 | 25 | 32 | 6 |
Bridge Rail |
Reinforced Concrete Bridge Rail | linear ft. | 280 | 231 | 44 | 5 | 0 |