US-31W over GREEN RIVER
Map
Coordinates:
+37.26861, -85.8852837°16'07" N, 85°53'07" W
Facts
Source: National Bridge Inventory. Information not verified; use at your own risk.
Name: | US-31W over GREEN RIVER |
Structure number: | 050B00004N |
Location: | .5 MI SE OF JCT KY 357 |
Purpose: | Carries highway over waterway |
Route classification: | Major Collector (Rural) [07] |
Length of largest span: | 200.1 ft. [61.0 m] |
Total length: | 1467.9 ft. [447.4 m] |
Roadway width between curbs: | 24.0 ft. [7.3 m] |
Deck width edge-to-edge: | 31.2 ft. [9.5 m] |
Owner: | State Highway Agency [01] |
Year built: | 1938 |
Historic significance: | Bridge is eligible for the National Register of Historic Places [2] |
Design load: | M 18 / H 20 [4] |
Number of main spans: | 8 |
Main spans material: | Steel [3] |
Main spans design: | Truss - Deck [09] |
Deck type: | Concrete Cast-in-Place [1] |
Wearing surface: | Monolithic Concrete (concurrently placed with structural deck) [1] |
Latest Available Inspection: August 2017
Good/Fair/Poor Condition: | Fair |
Status: | Open, no restriction [A] |
Average daily traffic: | 9,129 [as of 2014] |
Truck traffic: | 9% of total traffic |
Deck condition: | Satisfactory [6 out of 9] |
Superstructure condition: | Fair [5 out of 9] |
Substructure condition: | Satisfactory [6 out of 9] |
Structural appraisal: | Somewhat better than minimum adequacy to tolerate being left in place as is [5] |
Deck geometry appraisal: | Basically intolerable requiring high priority of replacement [2] |
Water adequacy appraisal: | Equal to present desirable criteria [8] |
Roadway alignment appraisal: | Equal to present minimum criteria [6] |
Channel protection: | Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7] |
Scour condition: | Bridge foundations determined to be stable for the assessed or calculated scour condition. [8] |
Sufficiency rating: | 58.5 |
Recommended work: | Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31] |
Estimated cost of work: | $6,892,000 |
Previous Inspections
Date | Condition | Deck | Superstructure | Substructure | ADT | Suff. Rating |
---|
August 2017 | Fair | Satisfactory | Fair | Satisfactory | 9129 | 58.5 |
December 2016 | Fair | Satisfactory | Satisfactory | Satisfactory | 9129 | 71.3 |
August 2015 | Fair | Satisfactory | Satisfactory | Satisfactory | 9129 | 71.3 |
December 2014 | Fair | Good | Satisfactory | Satisfactory | 9776 | 70.7 |
August 2013 | Fair | Good | Satisfactory | Satisfactory | 9569 | 70.9 |
December 2011 | Fair | Good | Satisfactory | Satisfactory | 9540 | 70.9 |
December 2009 | Fair | Good | Fair | Satisfactory | 10400 | 57.0 |
January 2008 | Poor | Good | Poor | Satisfactory | 8990 | 38.2 |
December 2005 | Fair | Very Good | Satisfactory | Good | 8579 | 72.7 |
Element Data
Source: National Bridge Elements dataset, 2019 edition. This feature is experimental.
Element | Units | Quantity | 1-Good | 2-Fair | 3-Poor | 4-Serious |
---|
Superstructure |
Steel Girder/Beam | linear ft. | 1,519 | 1,084 | 324 | 111 | 0 |
Steel Protective Coating | sq. ft. | 13,310 | 12,037 | 1,198 | 0 | 75 |
Steel Stringer | linear ft. | 6,270 | 6,164 | 12 | 94 | 0 |
Steel Protective Coating | sq. ft. | 30,340 | 30,305 | 0 | 0 | 35 |
Deck |
Reinforced Concrete Deck | sq. ft. | 45,750 | 40,897 | 4,130 | 723 | 0 |
Superstructure |
Steel Truss | linear ft. | 2,508 | 1,887 | 71 | 550 | 0 |
Steel Protective Coating | sq. ft. | 113,900 | 85,704 | 25,000 | 2,846 | 350 |
Steel Floor Beam | linear ft. | 2,220 | 1,364 | 62 | 794 | 0 |
Steel Protective Coating | sq. ft. | 15,910 | 15,517 | 318 | 0 | 75 |
Steel Gusset Plate | each | 230 | 139 | 1 | 84 | 6 |
Steel Protective Coating | sq. ft. | 15,220 | 10,125 | 4,870 | 75 | 150 |
Substructure |
Steel Column | each | 4 | 0 | 0 | 4 | 0 |
Steel Protective Coating | sq. ft. | 506 | 430 | 0 | 51 | 25 |
Reinforced Concrete Column | each | 22 | 5 | 13 | 4 | 0 |
Reinforced Concrete Abutment | linear ft. | 92 | 82 | 5 | 5 | 0 |
Steel Pier Cap | linear ft. | 62 | 10 | 0 | 52 | 0 |
Steel Protective Coating | sq. ft. | 556 | 556 | 0 | 0 | 0 |
Reinforced Concrete Pier Cap | linear ft. | 297 | 169 | 44 | 84 | 0 |
Joints |
Strip Seal Joint | linear ft. | 60 | 26 | 30 | 4 | 0 |
Compression Joint | linear ft. | 270 | 35 | 228 | 7 | 0 |
Bearings |
Movable Bearing | each | 30 | 10 | 16 | 4 | 0 |
Steel Protective Coating | sq. ft. | 160 | 24 | 128 | 5 | 3 |
Fixed Bearing | each | 34 | 17 | 16 | 1 | 0 |
Steel Protective Coating | sq. ft. | 184 | 22 | 153 | 4 | 5 |
Bridge Rail |
Reinforced Concrete Bridge Rail | linear ft. | 2,944 | 2,787 | 155 | 2 | 0 |