LA0315 over PROVOST BAYOU
Map
Coordinates:
+29.46290, -90.7511029°27'46" N, 90°45'04" W
Facts
Source: National Bridge Inventory. Information not verified; use at your own risk.
Name: | LA0315 over PROVOST BAYOU |
Structure number: | 025502459001261 |
Location: | 8.6 MI SOUTH OF LA 661 |
Purpose: | Carries highway over waterway |
Route classification: | Minor Collector (Rural) [08] |
Length of largest span: | 136.2 ft. [41.5 m] |
Total length: | 175.9 ft. [53.6 m] |
Roadway width between curbs: | 24.0 ft. [7.3 m] |
Deck width edge-to-edge: | 28.9 ft. [8.8 m] |
Owner: | State Highway Agency [01] |
Year built: | 1953 |
Historic significance: | Bridge is not eligible for the National Register of Historic Places [5] |
Design load: | M 13.5 / H 15 [2] |
Number of main spans: | 3 |
Main spans material: | Steel [3] |
Main spans design: | Movable - Swing [17] |
Deck type: | Concrete Cast-in-Place [1] |
Latest Available Inspection: January 2018
Good/Fair/Poor Condition: | Poor |
Status: | Open, no restriction [A] |
Average daily traffic: | 2,400 [as of 2016] |
Truck traffic: | 12% of total traffic |
Deck condition: | Satisfactory [6 out of 9] |
Superstructure condition: | Fair [5 out of 9] |
Substructure condition: | Poor [4 out of 9] |
Structural appraisal: | Meets minimum tolerable limits to be left in place as is [4] |
Deck geometry appraisal: | Basically intolerable requiring high priority of replacement [2] |
Water adequacy appraisal: | Meets minimum tolerable limits to be left in place as is [4] |
Roadway alignment appraisal: | Better than present minimum criteria [7] |
Channel protection: | Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. [6] |
Scour condition: | Bridge foundations determined to be stable for the assessed or calculated scour condition. [8] |
Sufficiency rating: | 29.8 |
Recommended work: | Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31] |
Estimated cost of work: | $802,000 |
Previous Inspections
Date | Condition | Deck | Superstructure | Substructure | ADT | Suff. Rating |
---|
January 2018 | Poor | Satisfactory | Fair | Poor | 2400 | 29.8 |
January 2017 | Poor | Satisfactory | Fair | Poor | 2400 | 29.8 |
January 2016 | Poor | Satisfactory | Fair | Poor | 2400 | 29.5 |
January 2015 | Fair | Satisfactory | Fair | Fair | 2400 | 45.5 |
September 2013 | Fair | Satisfactory | Fair | Fair | 1780 | 45.5 |
October 2012 | Fair | Satisfactory | Satisfactory | Fair | 1780 | 45.5 |
November 2010 | Fair | Satisfactory | Satisfactory | Satisfactory | 2100 | 44.5 |
December 2008 | Fair | Satisfactory | Satisfactory | Satisfactory | 2100 | 43.5 |
November 2007 | Fair | Fair | Satisfactory | Satisfactory | 2600 | 42.5 |
December 2006 | Fair | Fair | Satisfactory | Satisfactory | 2800 | 42.5 |
April 2005 | Fair | Fair | Satisfactory | Fair | 2700 | 41.5 |
March 2004 | Fair | Fair | Satisfactory | Fair | 3300 | 41.5 |
April 2002 | Fair | Fair | Satisfactory | Fair | 3000 | 41.5 |
July 2000 | Fair | Fair | Satisfactory | Fair | 2436 | 41.5 |
August 1998 | Fair | Fair | Satisfactory | Fair | 2094 | 41.5 |
September 1996 | Fair | Satisfactory | Satisfactory | Satisfactory | 2791 | 43.5 |
September 1994 | Fair | Satisfactory | Satisfactory | Good | 2644 | 45.5 |
May 1992 | Fair | Satisfactory | Satisfactory | Good | 2167 | 48.5 |
Element Data
Source: National Bridge Elements dataset, 2019 edition. This feature is experimental.
Element | Units | Quantity | 1-Good | 2-Fair | 3-Poor | 4-Serious |
---|
Superstructure |
Steel Girder/Beam | linear ft. | 434 | 284 | 150 | 0 | 0 |
Steel Protective Coating | sq. ft. | 5,282 | 0 | 0 | 5,282 | 0 |
Steel Stringer | linear ft. | 405 | 205 | 200 | 0 | 0 |
Steel Protective Coating | sq. ft. | 2,339 | 0 | 0 | 2,339 | 0 |
Deck |
Reinforced Concrete Deck | sq. ft. | 4,400 | 4,385 | 15 | 0 | 0 |
Superstructure |
Steel Floor Beam | linear ft. | 125 | 25 | 75 | 25 | 0 |
Steel Protective Coating | sq. ft. | 2,231 | 0 | 0 | 2,231 | 0 |
Substructure |
Reinforced Concrete Pier Wall | linear ft. | 1 | 1 | 0 | 0 | 0 |
Reinforced Concrete Abutment | linear ft. | 70 | 0 | 0 | 70 | 0 |
Prestressed Concrete Pile | each | 12 | 11 | 0 | 1 | 0 |
Reinforced Concrete Pier Cap | linear ft. | 50 | 50 | 0 | 0 | 0 |
Joints |
Pourable Joint | linear ft. | 50 | 50 | 0 | 0 | 0 |
Open Joint | linear ft. | 100 | 100 | 0 | 0 | 0 |
Bearings |
Movable Bearing | each | 24 | 0 | 0 | 24 | 0 |
Steel Protective Coating | sq. ft. | 20 | 0 | 0 | 0 | 20 |
Other Bearing | each | 1 | 0 | 1 | 0 | 0 |
Steel Protective Coating | sq. ft. | 36 | 0 | 0 | 0 | 36 |
Bridge Rail |
Reinforced Concrete Bridge Rail | linear ft. | 352 | 352 | 0 | 0 | 0 |