HWY ELM ST over WATER TAUNTON RIVER
This bridge is no longer in the current National Bridge Inventory database, and has likely been demolished or abandoned.
Map
Coordinates:
+41.83481, -71.1076141°50'05" N, 71°06'27" W
Facts
Source: National Bridge Inventory. Information not verified; use at your own risk.
Name: | HWY ELM ST over WATER TAUNTON RIVER |
Structure number: | B080013J1MUNNBI |
Old structure number: | MUN605012100 (from 1992 edition) |
Location: | OVER TAUNTON AT DIGHTON |
Purpose: | Carries highway and pedestrian walkway over waterway |
Route classification: | Other Principal Arterial (Urban) [14] |
Length of largest span: | 78.1 ft. [23.8 m] |
Total length: | 320.9 ft. [97.8 m] |
Roadway width between curbs: | 18.4 ft. [5.6 m] |
Deck width edge-to-edge: | 20.3 ft. [6.2 m] |
Vertical clearance above deck: | 16.4 ft. [5.0 m] |
Vertical clearance below bridge: | 6.9 ft. [2.1 m] |
Owner: | Town or Township Highway Agency [03] |
Year built: | 1896 |
Historic significance: | Bridge is eligible for the National Register of Historic Places [2] |
Number of main spans: | 2 |
Main spans material: | Steel continuous [4] |
Main spans design: | Movable - Swing [17] |
Deck type: | Wood or Timber [8] |
Wearing surface: | Bituminous [6] |
Latest Available Inspection: September 2009
Good/Fair/Poor Condition: | Poor |
Status: | Posted for load [P] |
Average daily traffic: | 7,040 [as of 2007] |
Truck traffic: | 1% of total traffic |
Deck condition: | Satisfactory [6 out of 9] |
Superstructure condition: | Critical [2 out of 9] |
Substructure condition: | Poor [4 out of 9] |
Structural appraisal: | Basically intolerable requiring high priority of replacement [2] |
Deck geometry appraisal: | Basically intolerable requiring high priority of replacement [2] |
Water adequacy appraisal: | Equal to present desirable criteria [8] |
Roadway alignment appraisal: | Basically intolerable requiring high priority of corrrective action [3] |
Channel protection: | Bank and embankment protection is severely undermined. River control devices have severe damage. Large deposits of debris are in the channel. [4] |
Pier/abutment protection: | In place and functioning [2] |
Scour condition: | Scour calculation/evaluation has not been made. [6] |
Sufficiency rating: | 18.0 |
Recommended work: | Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31] |
Estimated cost of work: | $8,389,000 |
Previous Inspections
Date | Condition | Deck | Superstructure | Substructure | ADT | Suff. Rating |
---|
September 2009 | Poor | Satisfactory | Critical | Poor | 7040 | 18.0 |
August 1999 | Poor | Good | Critical | Fair | 4720 | 3.0 |
November 1991 | Poor | Fair | Serious | Serious | 7000 | 2.0 |