Share:

HWY LAND BLVD over WATER LECHMERE CANAL

Map

Coordinates:
+42.36845, -71.07404
42°22'06" N, 71°04'27" W

Facts

Source: National Bridge Inventory. Information not verified; use at your own risk.
Name:HWY LAND BLVD over WATER LECHMERE CANAL
Structure number:C010013F1DOTNBI
Old structure number:443812022101 (from 1992 edition)
Location:500 FT W OF JCT SR 28
Purpose:Carries highway and pedestrian walkway over waterway
Route classification:Other Principal Arterial (Urban) [14]
Length of largest span:44.0 ft. [13.4 m]
Total length:130.9 ft. [39.9 m]
Roadway width between curbs:44.9 ft. [13.7 m]
Deck width edge-to-edge:60.7 ft. [18.5 m]
Vertical clearance below bridge:6.6 ft. [2.0 m]
Owner:State Highway Agency [01]
Year built:1986
Historic significance:Bridge is possibly eligible for the National Register of Historic Places [3]
Design load:MS 18 / HS 20 [5]
Number of main spans:3
Main spans material:Steel continuous [4]
Main spans design:Stringer/Multi-beam or girder [02]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Bituminous [6]

Latest Available Inspection: March 2018

Good/Fair/Poor Condition:Fair
Status:Open, no restriction [A]
Average daily traffic:53,793 [as of 2018]
Truck traffic:4% of total traffic
Deck condition:Fair [5 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Structural appraisal:Better than present minimum criteria [7]
Deck geometry appraisal:Basically intolerable requiring high priority of replacement [2]
Water adequacy appraisal:Superior to present desirable criteria [9]
Roadway alignment appraisal:Better than present minimum criteria [7]
Channel protection:Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. [6]
Pier/abutment protection:In place and functioning [2]
Scour condition:Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Sufficiency rating:70.4
Recommended work:Widening of existing bridge with deck rehabilitation or replacement. [34]
Estimated cost of work:$10,666,000

Previous Inspections

DateConditionDeckSuperstructureSubstructureADTSuff. Rating
March 2018FairFairGoodGood5379370.4
March 2016FairSatisfactoryGoodGood5680071.1
March 2014FairSatisfactoryGoodGood4050073.1
March 2012FairSatisfactoryGoodGood4050073.1
March 2010GoodGoodGoodGood4030073.1
April 1998GoodVery GoodVery GoodVery Good2560077.9
April 1994GoodVery GoodVery GoodVery Good3650069.4
April 1992GoodVery GoodVery GoodVery Good3480049.8
June 1990GoodVery GoodVery GoodVery Good6890144.4

Element Data

Source: National Bridge Elements dataset, 2019 edition. This feature is experimental.
ElementUnitsQuantity1-Good2-Fair3-Poor4-Serious
Superstructure
Steel Girder/Beamlinear ft.1,9601,60036000
Steel Protective Coatingsq. ft.11,9959,767002,228
Deck
Reinforced Concrete Decksq. ft.14,54813,4791439260
Wearing Surfacessq. ft.10,7147,4873,22520
Substructure
Reinforced Concrete Columneach1401400
Reinforced Concrete Abutmentlinear ft.10498600
Concrete Protective Coatingsq. ft.2,778002,7780
Reinforced Concrete Pier Caplinear ft.234234000
Joints
Compression Jointlinear ft.9209200
Bearings
Movable Bearingeach4543020
Steel Protective Coatingsq. ft.1,472001,4720
Fixed Bearingeach1515000
Steel Protective Coatingsq. ft.490049000
Bridge Rail
Steel or Aluminum Bridge Raillinear ft.261261000
Steel Protective Coatingsq. ft.963963000