ST109 BRIDGE ST over WATER CHARLES RIVER
This bridge is no longer in the current National Bridge Inventory database, and has likely been demolished or abandoned.
Map
Coordinates:
+42.25389, -71.1811142°15'14" N, 71°10'52" W
Facts
Source: National Bridge Inventory. Information not verified; use at your own risk.
Name: | ST109 BRIDGE ST over WATER CHARLES RIVER |
Structure number: | D05004369DOTNBI |
Old structure number: | 369228610004101 (from 1992 edition) |
Location: | 1.3 KM NE OF ST 128 |
Purpose: | Carries highway over waterway |
Route classification: | Other Principal Arterial (Urban) [14] |
Length of largest span: | 20.0 ft. [6.1 m] |
Total length: | 69.9 ft. [21.3 m] |
Roadway width between curbs: | 26.9 ft. [8.2 m] |
Deck width edge-to-edge: | 29.9 ft. [9.1 m] |
Owner: | State Highway Agency [01] |
Year built: | 1921 |
Historic significance: | Bridge is eligible for the National Register of Historic Places [2] |
Design load: | M 18 / H 20 [4] |
Number of main spans: | 3 |
Main spans material: | Masonry [8] |
Main spans design: | Arch - Deck [11] |
Deck type: | Not applicable [N] |
Latest Available Inspection: October 2008
Good/Fair/Poor Condition: | Fair |
Status: | Open, no restriction [A] |
Average daily traffic: | 19,000 [as of 2008] |
Truck traffic: | 4% of total traffic |
Superstructure condition: | Satisfactory [6 out of 9] |
Substructure condition: | Fair [5 out of 9] |
Structural appraisal: | Somewhat better than minimum adequacy to tolerate being left in place as is [5] |
Deck geometry appraisal: | Basically intolerable requiring high priority of replacement [2] |
Water adequacy appraisal: | Equal to present minimum criteria [6] |
Roadway alignment appraisal: | Somewhat better than minimum adequacy to tolerate being left in place as is [5] |
Channel protection: | Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. [6] |
Scour condition: | Bridge with "unknown" foundation that has not been evaluated for scour. [U] |
Sufficiency rating: | 61.6 |
Recommended work: | Bridge rehabilitation because of general structure deterioration or inadequate strength. [35] |
Estimated cost of work: | $835,000 |
Previous Inspections
Date | Condition | Deck | Superstructure | Substructure | ADT | Suff. Rating |
---|
October 2008 | Fair | - | Satisfactory | Fair | 19000 | 61.6 |
October 1998 | Fair | - | Satisfactory | Fair | 11900 | 61.6 |