Share:

US 1 NE XWAY over HWY HYSIL AVE

Map

Coordinates:
+42.41187, -71.03004
42°24'43" N, 71°01'48" W

Facts

Source: National Bridge Inventory. Information not verified; use at your own risk.
Name:US 1 NE XWAY over HWY HYSIL AVE
Structure number:R050283AJDOTNBI
Location:.4 MI NW OF JCT SR16&US1
Purpose:Carries highway over highway
Route classification:Principal Arterial - Other Freeways or Expressways (Urban) [12]
Length of largest span:52.5 ft. [16.0 m]
Total length:58.1 ft. [17.7 m]
Roadway width between curbs:109.9 ft. [33.5 m]
Deck width edge-to-edge:114.5 ft. [34.9 m]
Vertical clearance below bridge:16.4 ft. [5.0 m]
Owner:State Highway Agency [01]
Year built:1956
Year reconstructed:1974
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18 / HS 20 [5]
Main span material:Steel [3]
Main span design:Stringer/Multi-beam or girder [02]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Latex Concrete or similar additive [3]

Latest Available Inspection: September 2018

Good/Fair/Poor Condition:Fair
Status:Open, no restriction [A]
Average daily traffic:66,200 [as of 2016]
Truck traffic:10% of total traffic
Deck condition:Fair [5 out of 9]
Superstructure condition:Fair [5 out of 9]
Substructure condition:Fair [5 out of 9]
Structural appraisal:Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck geometry appraisal:Superior to present desirable criteria [9]
Underclearances appraisal:Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Roadway alignment appraisal:Better than present minimum criteria [7]
Scour condition:Bridge not over waterway. [N]
Sufficiency rating:75.8
Recommended work:Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Estimated cost of work:$3,178,000

Previous Inspections

DateConditionDeckSuperstructureSubstructureADTSuff. Rating
September 2018FairFairFairFair6620075.8
September 2016FairFairFairFair6620074.8
September 2014FairSatisfactorySatisfactorySatisfactory6620087.4
September 2012FairSatisfactorySatisfactorySatisfactory6620087.4
September 2010FairSatisfactorySatisfactorySatisfactory6100088.2
September 2008FairSatisfactoryGoodSatisfactory6100089.2

Element Data

Source: National Bridge Elements dataset, 2019 edition. This feature is experimental.
ElementUnitsQuantity1-Good2-Fair3-Poor4-Serious
Superstructure
Steel Girder/Beamlinear ft.954729150750
Steel Protective Coatingsq. ft.8,224004,1124,112
Deck
Reinforced Concrete Decksq. ft.6,09505,7953000
Wearing Surfacessq. ft.6,095006,0950
Substructure
Reinforced Concrete Abutmentlinear ft.2440651790
Bearings
Movable Bearingeach1801620
Fixed Bearingeach1801620
Bridge Rail
Steel or Aluminum Bridge Raillinear ft.5305300
Steel Protective Coatingsq. ft.318003180
Other Material Bridge Raillinear ft.5353000