Source: National Bridge Inventory. Information not verified; use at your own risk.
Name:HWY GROVE ST over WATER NORTH RIVER
Structure number:S010032QGMUNNBI
Old structure number:MUN531007100 (from 1992 edition)
Location:AT NORTH RIVER
Purpose:Carries highway and pedestrian walkway over waterway
Route classification:Collector (Urban) [17]
Length of largest span:7.9 ft. [2.4 m]
Total length:26.9 ft. [8.2 m]
Roadway width between curbs:37.1 ft. [11.3 m]
Deck width edge-to-edge:58.7 ft. [17.9 m]
Skew angle:11°
Owner:City or Municipal Highway Agency [04]
Year built:1950
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Number of main spans:3
Main spans material:Concrete [1]
Main spans design:Culvert [19]
Deck type:Not applicable [N]

Latest Available Inspection: July 2017

Good/Fair/Poor Condition:Fair
Status:Open, no restriction [A]
Average daily traffic:12,450 [as of 2017]
Truck traffic:8% of total traffic
Structural appraisal:Equal to present minimum criteria [6]
Deck geometry appraisal:Meets minimum tolerable limits to be left in place as is [4]
Water adequacy appraisal:Equal to present desirable criteria [8]
Roadway alignment appraisal:Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Channel protection:Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. [6]
Culvert condition:Deterioration or initial disintegration, minor chloride contamination, cracking with some leaching, or spalls on concrete or masonry walls and slabs. Local minor scouring at curtain walls, wingwalls or pipes. Metal culverts have a smooth curvature, non-symmetrical shape, significant corrosion or moderate pitting. [6]
Scour condition:Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Sufficiency rating:86.9
Recommended work:Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Estimated cost of work:$502,000

Previous Inspections

DateConditionCulvert ConditionADTSuff. Rating
July 2017Fair6 out of 101245086.9
July 2015Fair6 out of 101047587.1
July 2013Fair6 out of 10985087.2
July 2011Fair6 out of 10410088.8
July 2009Fair6 out of 10470094.6
July 2007Fair6 out of 10740093.3
July 2005Good7 out of 10550096.5
July 2003Good7 out of 10737596.3
July 2001Good7 out of 10910096.1
July 1999Good7 out of 10250097.8
July 1995Good7 out of 10330088.1
July 1993Good7 out of 10330088.1
August 1990Good7 out of 10765496.4

Element Data

Source: National Bridge Elements dataset, 2019 edition. This feature is experimental.
ElementUnitsQuantity1-Good2-Fair3-Poor4-Serious
Culvert
Reinforced Concrete Culvertlinear ft.173016940