M-28 over ROCK RIVER
Map
Coordinates:
+46.46382, -86.9160346°27'50" N, 86°54'58" W
Facts
Source: National Bridge Inventory. Information not verified; use at your own risk.
Name: | M-28 over ROCK RIVER |
Structure number: | 000000000000046 |
Old structure number: | 02102041000B030 (from 1992 edition) |
Location: | 5.1 MI NW OF AU TRAIN |
Purpose: | Carries highway over waterway |
Route classification: | Principal Arterial - Other (Rural) [02] |
Length of largest span: | 40.0 ft. [12.2 m] |
Total length: | 40.0 ft. [12.2 m] |
Roadway width between curbs: | 47.9 ft. [14.6 m] |
Deck width edge-to-edge: | 49.5 ft. [15.1 m] |
Owner: | State Highway Agency [01] |
Year built: | 1932 |
Year reconstructed: | 1975 |
Historic significance: | Bridge is not eligible for the National Register of Historic Places [5] |
Design load: | MS 18 / HS 20 [5] |
Main span material: | Steel [3] |
Main span design: | Stringer/Multi-beam or girder [02] |
Deck type: | Concrete Cast-in-Place [1] |
Wearing surface: | Monolithic Concrete (concurrently placed with structural deck) [1] |
Latest Available Inspection: May 2017
Good/Fair/Poor Condition: | Fair |
Status: | Open, no restriction [A] |
Average daily traffic: | 3,093 [as of 2007] |
Truck traffic: | 10% of total traffic |
Deck condition: | Very Good [8 out of 9] |
Superstructure condition: | Good [7 out of 9] |
Substructure condition: | Satisfactory [6 out of 9] |
Structural appraisal: | Equal to present minimum criteria [6] |
Deck geometry appraisal: | Superior to present desirable criteria [9] |
Water adequacy appraisal: | Equal to present desirable criteria [8] |
Roadway alignment appraisal: | Better than present minimum criteria [7] |
Channel protection: | Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7] |
Scour condition: | Bridge foundations determined to be stable for the assessed or calculated scour condition. [8] |
Sufficiency rating: | 90.8 |
Recommended work: | Bridge deck replacement with only incidental widening. [37] |
Estimated cost of work: | $7,000 |
Previous Inspections
Date | Condition | Deck | Superstructure | Substructure | ADT | Suff. Rating |
---|
May 2017 | Fair | Very Good | Good | Satisfactory | 3093 | 90.8 |
May 2015 | Fair | Very Good | Good | Satisfactory | 3093 | 90.8 |
May 2013 | Fair | Very Good | Good | Satisfactory | 3093 | 90.8 |
May 2011 | Fair | Very Good | Satisfactory | Satisfactory | 3093 | 90.8 |
May 2009 | Good | Very Good | Good | Good | 3093 | 90.8 |
May 2007 | Good | Very Good | Good | Good | 3622 | 89.2 |
May 2005 | Good | Very Good | Good | Good | 3400 | 89.8 |
May 2003 | Good | Very Good | Good | Good | 3400 | 89.7 |
May 2001 | Good | Very Good | Good | Good | 3400 | 89.7 |
May 1999 | Good | Very Good | Good | Good | 3400 | 89.7 |
July 1997 | Good | Very Good | Good | Good | 3400 | 87.7 |
October 1995 | Good | Good | Good | Good | 3300 | 88.0 |
September 1993 | Fair | Very Good | Good | Fair | 3300 | 75.5 |
September 1991 | Good | Very Good | Good | Good | 3300 | 88.0 |
Element Data
Source: National Bridge Elements dataset, 2019 edition. This feature is experimental.
Element | Units | Quantity | 1-Good | 2-Fair | 3-Poor | 4-Serious |
---|
Superstructure |
Steel Girder/Beam | linear ft. | 400 | 385 | 15 | 0 | 0 |
Steel Protective Coating | sq. ft. | 2,500 | 2,375 | 125 | 0 | 0 |
Deck |
Reinforced Concrete Deck | sq. ft. | 2,000 | 1,990 | 10 | 0 | 0 |
Wearing Surfaces | sq. ft. | 2,000 | 1,998 | 0 | 2 | 0 |
Substructure |
Reinforced Concrete Abutment | linear ft. | 130 | 82 | 36 | 12 | 0 |
Joints |
Pourable Joint | linear ft. | 92 | 0 | 0 | 92 | 0 |
Bearings |
Movable Bearing | each | 10 | 10 | 0 | 0 | 0 |
Fixed Bearing | each | 10 | 10 | 0 | 0 | 0 |
Bridge Rail |
Reinforced Concrete Bridge Rail | linear ft. | 80 | 75 | 2 | 3 | 0 |