M-48 over BIG MUNUSCONG RIVER
Map
Coordinates:
+46.18720, -84.4976346°11'14" N, 84°29'51" W
Facts
Source: National Bridge Inventory. Information not verified; use at your own risk.
Name: | M-48 over BIG MUNUSCONG RIVER |
Structure number: | 000000000001588 |
Old structure number: | 17117042000B010 (from 1992 edition) |
Location: | 2.9 MI E OF I-75 |
Purpose: | Carries highway over waterway |
Route classification: | Major Collector (Rural) [07] |
Length of largest span: | 48.9 ft. [14.9 m] |
Total length: | 147.0 ft. [44.8 m] |
Roadway width between curbs: | 27.9 ft. [8.5 m] |
Deck width edge-to-edge: | 35.1 ft. [10.7 m] |
Owner: | State Highway Agency [01] |
Year built: | 1955 |
Historic significance: | Bridge is not eligible for the National Register of Historic Places [5] |
Design load: | MS 18 / HS 20 [5] |
Number of main spans: | 3 |
Main spans material: | Steel [3] |
Main spans design: | Stringer/Multi-beam or girder [02] |
Deck type: | Concrete Cast-in-Place [1] |
Wearing surface: | Latex Concrete or similar additive [3] |
Latest Available Inspection: May 2018
Good/Fair/Poor Condition: | Fair |
Status: | Open, no restriction [A] |
Average daily traffic: | 605 [as of 2007] |
Truck traffic: | 27% of total traffic |
Deck condition: | Good [7 out of 9] |
Superstructure condition: | Satisfactory [6 out of 9] |
Substructure condition: | Satisfactory [6 out of 9] |
Structural appraisal: | Equal to present minimum criteria [6] |
Deck geometry appraisal: | Somewhat better than minimum adequacy to tolerate being left in place as is [5] |
Water adequacy appraisal: | Equal to present desirable criteria [8] |
Roadway alignment appraisal: | Better than present minimum criteria [7] |
Channel protection: | Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. [8] |
Scour condition: | Bridge foundations determined to be stable for the assessed or calculated scour condition. [8] |
Sufficiency rating: | 92.2 |
Recommended work: | Bridge deck replacement with only incidental widening. [37] |
Previous Inspections
Date | Condition | Deck | Superstructure | Substructure | ADT | Suff. Rating |
---|
May 2018 | Fair | Good | Satisfactory | Satisfactory | 605 | 92.2 |
May 2016 | Fair | Good | Satisfactory | Satisfactory | 605 | 92.2 |
May 2014 | Fair | Good | Satisfactory | Satisfactory | 605 | 92.2 |
May 2012 | Fair | Good | Satisfactory | Satisfactory | 605 | 92.2 |
May 2010 | Fair | Good | Satisfactory | Satisfactory | 605 | 92.2 |
May 2008 | Fair | Good | Satisfactory | Satisfactory | 605 | 92.2 |
May 2006 | Fair | Good | Satisfactory | Satisfactory | 469 | 92.6 |
October 2004 | Fair | Good | Satisfactory | Satisfactory | 480 | 92.6 |
May 2002 | Fair | Satisfactory | Satisfactory | Fair | 480 | 81.3 |
May 2000 | Fair | Satisfactory | Satisfactory | Good | 480 | 92.6 |
December 1998 | Fair | Satisfactory | Satisfactory | Good | 480 | 97.6 |
September 1996 | Fair | Satisfactory | Satisfactory | Good | 480 | 92.6 |
October 1994 | Fair | Good | Satisfactory | Good | 400 | 93.8 |
September 1992 | Fair | Good | Satisfactory | Satisfactory | 400 | 93.8 |
October 1990 | Fair | Good | Good | Satisfactory | 400 | 93.8 |