M-64 over POTATO RIVER
Map
Coordinates:
+46.85206, -89.3866246°51'07" N, 89°23'12" W
Facts
Source: National Bridge Inventory. Information not verified; use at your own risk.
Name: | M-64 over POTATO RIVER |
Structure number: | 000000000008476 |
Old structure number: | 66166013000B090 (from 1992 edition) |
Location: | 3.6 MI SW OF US-45 |
Purpose: | Carries highway over waterway |
Route classification: | Minor Arterial (Rural) [06] |
Length of largest span: | 59.7 ft. [18.2 m] |
Total length: | 149.9 ft. [45.7 m] |
Roadway width between curbs: | 27.9 ft. [8.5 m] |
Deck width edge-to-edge: | 33.5 ft. [10.2 m] |
Owner: | State Highway Agency [01] |
Year built: | 1952 |
Historic significance: | Bridge is not eligible for the National Register of Historic Places [5] |
Design load: | MS 18 / HS 20 [5] |
Number of main spans: | 3 |
Main spans material: | Steel [3] |
Main spans design: | Stringer/Multi-beam or girder [02] |
Deck type: | Concrete Cast-in-Place [1] |
Wearing surface: | Bituminous [6] |
Latest Available Inspection: August 2018
Good/Fair/Poor Condition: | Fair |
Status: | Open, no restriction [A] |
Average daily traffic: | 2,025 [as of 2013] |
Truck traffic: | 5% of total traffic |
Deck condition: | Good [7 out of 9] |
Superstructure condition: | Satisfactory [6 out of 9] |
Substructure condition: | Good [7 out of 9] |
Structural appraisal: | Equal to present minimum criteria [6] |
Deck geometry appraisal: | Meets minimum tolerable limits to be left in place as is [4] |
Water adequacy appraisal: | Equal to present minimum criteria [6] |
Roadway alignment appraisal: | Equal to present minimum criteria [6] |
Channel protection: | Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7] |
Scour condition: | Bridge is scour critical; bridge foundations determined to be unstable. [3] |
Sufficiency rating: | 73.7 |
Recommended work: | Bridge deck replacement with only incidental widening. [37] |
Estimated cost of work: | $115,000 |
Previous Inspections
Date | Condition | Deck | Superstructure | Substructure | ADT | Suff. Rating |
---|
August 2018 | Fair | Good | Satisfactory | Good | 2025 | 73.7 |
August 2016 | Fair | Good | Satisfactory | Good | 2025 | 73.7 |
August 2014 | Good | Good | Good | Good | 2025 | 73.7 |
October 2013 | Good | Good | Good | Good | 2025 | 73.7 |
August 2012 | Fair | Good | Satisfactory | Good | 2117 | 73.2 |
August 2010 | Good | Good | Good | Good | 2117 | 73.2 |
August 2008 | Good | Good | Good | Good | 2117 | 73.2 |
August 2006 | Good | Good | Good | Good | 2184 | 72.8 |
August 2004 | Good | Good | Good | Good | 2600 | 70.6 |
August 2002 | Good | Very Good | Good | Good | 2600 | 70.6 |
August 2000 | Good | Good | Good | Good | 2600 | 70.5 |
September 1998 | Good | Good | Good | Good | 2600 | 76.5 |
September 1996 | Good | Good | Good | Good | 2600 | 68.8 |
October 1994 | Poor | Poor | Good | Good | 2100 | 66.9 |
September 1992 | Good | Good | Good | Good | 2100 | 70.4 |
September 1990 | Fair | Good | Good | Satisfactory | 2100 | 70.4 |