TH 7 over CHIPPEWA RIVER
This bridge is no longer in the current National Bridge Inventory database, and has likely been demolished or abandoned.
Map
Coordinates:
+44.94036, -95.7308144°56'25" N, 95°43'51" W
Facts
Source: National Bridge Inventory. Information not verified; use at your own risk.
Name: | TH 7 over CHIPPEWA RIVER |
Structure number: | 9114 |
Location: | 0.1 MI NW OF JCT TH 59 |
Purpose: | Carries highway and pedestrian walkway over waterway |
Route classification: | Other Principal Arterial (Urban) [14] |
Length of largest span: | 149.9 ft. [45.7 m] |
Total length: | 182.1 ft. [55.5 m] |
Roadway width between curbs: | 29.9 ft. [9.1 m] |
Deck width edge-to-edge: | 32.8 ft. [10.0 m] |
Vertical clearance above deck: | 16.1 ft. [4.9 m] |
Owner: | State Highway Agency [01] |
Year built: | 1932 |
Historic significance: | Bridge is not eligible for the National Register of Historic Places [5] |
Design load: | MS 18 / HS 20 [5] |
Main span material: | Steel [3] |
Main span design: | Truss - Thru [10] |
Deck type: | Concrete Cast-in-Place [1] |
Wearing surface: | Low slump Concrete [4] |
Latest Available Inspection: June 2013
Good/Fair/Poor Condition: | Poor |
Status: | Posted for load [P] |
Average daily traffic: | 2,200 [as of 2008] |
Truck traffic: | 12% of total traffic |
Deck condition: | Fair [5 out of 9] |
Superstructure condition: | Poor [4 out of 9] |
Substructure condition: | Fair [5 out of 9] |
Structural appraisal: | Meets minimum tolerable limits to be left in place as is [4] |
Deck geometry appraisal: | Meets minimum tolerable limits to be left in place as is [4] |
Water adequacy appraisal: | Equal to present desirable criteria [8] |
Roadway alignment appraisal: | Somewhat better than minimum adequacy to tolerate being left in place as is [5] |
Channel protection: | Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. [8] |
Scour condition: | Bridge foundations determined to be stable for the assessed or calculated scour condition. [8] |
Sufficiency rating: | 43.7 |
Recommended work: | Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31] |
Estimated cost of work: | $1,467,000 |
Previous Inspections
Date | Condition | Deck | Superstructure | Substructure | ADT | Suff. Rating |
---|
June 2013 | Poor | Fair | Poor | Fair | 2200 | 43.7 |
June 2012 | Poor | Fair | Poor | Fair | 2200 | 43.7 |
September 2011 | Poor | Fair | Poor | Fair | 2200 | 43.7 |
September 2010 | Poor | Fair | Poor | Fair | 2200 | 43.5 |
September 2009 | Poor | Fair | Poor | Fair | 2200 | 43.5 |
September 2008 | Poor | Fair | Poor | Fair | 1850 | 44.6 |
August 2007 | Fair | Fair | Fair | Fair | 1850 | 63.6 |
December 2006 | Fair | Satisfactory | Satisfactory | Satisfactory | 1850 | 75.7 |
October 2005 | Fair | Satisfactory | Satisfactory | Satisfactory | 1850 | 75.7 |
September 2004 | Fair | Satisfactory | Satisfactory | Satisfactory | 2000 | 75.7 |
December 2003 | Fair | Satisfactory | Satisfactory | Satisfactory | 2000 | 75.7 |
October 2002 | Fair | Satisfactory | Satisfactory | Satisfactory | 1750 | 75.7 |
December 2001 | Fair | Satisfactory | Satisfactory | Satisfactory | 1750 | 70.7 |
November 2000 | Fair | Satisfactory | Satisfactory | Satisfactory | 1750 | 75.4 |
November 1999 | Fair | Satisfactory | Satisfactory | Satisfactory | 1750 | 75.4 |
September 1998 | Fair | Satisfactory | Satisfactory | Satisfactory | 2050 | 74.4 |
October 1997 | Fair | Satisfactory | Satisfactory | Satisfactory | 2050 | 72.0 |
October 1996 | Fair | Satisfactory | Satisfactory | Satisfactory | 1600 | 73.0 |
December 1995 | Fair | Satisfactory | Satisfactory | Satisfactory | 1600 | 70.0 |
October 1994 | Fair | Satisfactory | Good | Satisfactory | 1600 | 70.0 |
September 1993 | Fair | Satisfactory | Good | Satisfactory | 1600 | 70.0 |
October 1992 | Fair | Satisfactory | Good | Satisfactory | 1800 | 70.9 |
November 1991 | Fair | Satisfactory | Good | Satisfactory | 1800 | 70.9 |