Share:

COUNTY RD 13 over ARAPAHOE CR

This bridge is no longer in the current National Bridge Inventory database, and has likely been demolished or abandoned.

Map

Coordinates:
+40.05936, -95.00622
40°03'34" N, 95°00'22" W

Facts

Source: National Bridge Inventory. Information not verified; use at your own risk.
Name:COUNTY RD 13 over ARAPAHOE CR
Structure number:12546
Old structure number:0130016 002 (from 1992 edition)
Location:S 30 T 61 N R 36 W
Purpose:Carries highway over waterway
Route classification:Local (Rural) [09]
Length of largest span:80.1 ft. [24.4 m]
Total length:83.0 ft. [25.3 m]
Roadway width between curbs:17.7 ft. [5.4 m]
Deck width edge-to-edge:18.4 ft. [5.6 m]
Owner:County Highway Agency [02]
Year built:1920
Historic significance:Historical significance is not determinable at this time [4]
Main span material:Steel [3]
Main span design:Truss - Thru [10]
Deck type:Concrete Cast-in-Place [1]

Latest Available Inspection: February 2010

Good/Fair/Poor Condition:Fair
Status:Posted for load [P]
Average daily traffic:10 [as of 2008]
Truck traffic:10% of total traffic
Deck condition:Very Good [8 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Fair [5 out of 9]
Structural appraisal:Basically intolerable requiring high priority of replacement [2]
Deck geometry appraisal:Basically intolerable requiring high priority of corrrective action [3]
Water adequacy appraisal:Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Roadway alignment appraisal:Basically intolerable requiring high priority of corrrective action [3]
Channel protection:Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. [6]
Scour condition:Bridge foundations determined to be stable for assessed or calculated scour condition. [5]
Sufficiency rating:25.7
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$372,000

Previous Inspections

DateConditionDeckSuperstructureSubstructureADTSuff. Rating
February 2010FairVery GoodSatisfactoryFair1025.7
February 1998FairVery GoodGoodSatisfactory1035.1
March 1990FairSatisfactoryGoodGood3543.4