Share:

COUNTY RD 27 over ARAPAHOE CR

This bridge is no longer in the current National Bridge Inventory database, and has likely been demolished or abandoned.

Map

Coordinates:
+40.11481, -94.95320
40°06'53" N, 94°57'12" W

Facts

Source: National Bridge Inventory. Information not verified; use at your own risk.
Name:COUNTY RD 27 over ARAPAHOE CR
Structure number:13034
Old structure number:0360004 002 (from 1992 edition)
Location:S 3 T 61 N R 36 W
Purpose:Carries highway over waterway
Route classification:Local (Rural) [09]
Length of largest span:80.1 ft. [24.4 m]
Total length:81.0 ft. [24.7 m]
Roadway width between curbs:15.7 ft. [4.8 m]
Deck width edge-to-edge:16.7 ft. [5.1 m]
Owner:County Highway Agency [02]
Year built:1930
Historic significance:Historical significance is not determinable at this time [4]
Main span material:Steel [3]
Main span design:Truss - Thru [10]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Monolithic Concrete (concurrently placed with structural deck) [1]

Latest Available Inspection: February 2010

Good/Fair/Poor Condition:Fair
Status:Posted for load [P]
Average daily traffic:15 [as of 2008]
Truck traffic:10% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Structural appraisal:Basically intolerable requiring high priority of replacement [2]
Deck geometry appraisal:Equal to present desirable criteria [8]
Water adequacy appraisal:Equal to present desirable criteria [8]
Roadway alignment appraisal:Equal to present desirable criteria [8]
Channel protection:Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. [6]
Scour condition:Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Sufficiency rating:43.3
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$359,000

Previous Inspections

DateConditionDeckSuperstructureSubstructureADTSuff. Rating
February 2010FairSatisfactorySatisfactorySatisfactory1543.3
March 1990FairVery GoodSatisfactoryGood3539.6