BISHOP RD over MUDDY FK
This bridge is no longer in the current National Bridge Inventory database, and has likely been demolished or abandoned.
Map
Coordinates:
+39.40876, -94.3459039°24'32" N, 94°20'45" W
Facts
Source: National Bridge Inventory. Information not verified; use at your own risk.
Name: | BISHOP RD over MUDDY FK |
Structure number: | 13865 |
Old structure number: | 0500003 024 (from 1992 edition) |
Location: | S 14 T 53 N R 31 W |
Purpose: | Carries highway over waterway |
Route classification: | Local (Rural) [09] |
Length of largest span: | 44.9 ft. [13.7 m] |
Total length: | 75.1 ft. [22.9 m] |
Roadway width between curbs: | 13.5 ft. [4.1 m] |
Deck width edge-to-edge: | 14.4 ft. [4.4 m] |
Owner: | County Highway Agency [02] |
Year built: | 1935 |
Year reconstructed: | 1995 |
Historic significance: | Bridge is not eligible for the National Register of Historic Places [5] |
Design load: | MS 18 / HS 20 [5] |
Main span material: | Steel [3] |
Main span design: | Truss - Thru [10] |
Deck type: | Corrugated Steel [6] |
Wearing surface: | Gravel [8] |
Latest Available Inspection: May 2008
Good/Fair/Poor Condition: | Poor |
Status: | Bridge closed to all traffic [K] |
Average daily traffic: | 55 [as of 2008] |
Truck traffic: | 10% of total traffic |
Deck condition: | Good [7 out of 9] |
Superstructure condition: | Critical [2 out of 9] |
Substructure condition: | Satisfactory [6 out of 9] |
Deck geometry appraisal: | Somewhat better than minimum adequacy to tolerate being left in place as is [5] |
Water adequacy appraisal: | Better than present minimum criteria [7] |
Roadway alignment appraisal: | Equal to present minimum criteria [6] |
Channel protection: | Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. [6] |
Scour condition: | Bridge foundations determined to be stable for the assessed or calculated scour condition. [8] |
Sufficiency rating: | 24.8 |
Recommended work: | Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31] |
Estimated cost of work: | $339,000 |
Previous Inspections
Date | Condition | Deck | Superstructure | Substructure | ADT | Suff. Rating |
---|
May 2008 | Poor | Good | Critical | Satisfactory | 55 | 24.8 |
December 1989 | Poor | Good | Poor | Fair | 127 | 21.4 |