THURMAN LAKE RD over MERAMEC RVR

Map

Coordinates:
+37.97777, -91.45655
37°58'40" N, 91°27'24" W

Facts

Source: National Bridge Inventory. Information not verified; use at your own risk.
Name:THURMAN LAKE RD over MERAMEC RVR
Structure number:14410
Old structure number:0670000 028 (from 1992 edition)
Location:S 27 T 38 N R 5 W
Purpose:Carries highway over waterway
Route classification:Local (Rural) [09]
Length of largest span:13.1 ft. [4.0 m]
Total length:85.0 ft. [25.9 m]
Roadway width between curbs:9.8 ft. [3.0 m]
Deck width edge-to-edge:9.8 ft. [3.0 m]
Owner:County Highway Agency [02]
Year built:1977
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:M 13.5 / H 15 [2]
Number of main spans:7
Main spans material:Concrete continuous [2]
Main spans design:Slab [01]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Monolithic Concrete (concurrently placed with structural deck) [1]

Latest Available Inspection: February 2017

Good/Fair/Poor Condition:Fair
Status:Posted for load [P]
Average daily traffic:35 [as of 2017]
Truck traffic:10% of total traffic
Deck condition:Fair [5 out of 9]
Superstructure condition:Fair [5 out of 9]
Substructure condition:Fair [5 out of 9]
Structural appraisal:Basically intolerable requiring high priority of replacement [2]
Deck geometry appraisal:Basically intolerable requiring high priority of replacement [2]
Water adequacy appraisal:Meets minimum tolerable limits to be left in place as is [4]
Roadway alignment appraisal:Equal to present minimum criteria [6]
Channel protection:Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. [6]
Scour condition:Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Sufficiency rating:18.0
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$382,000

Previous Inspections

DateConditionDeckSuperstructureSubstructureADTSuff. Rating
February 2017FairFairFairFair3518.0
February 2015FairFairFairFair3518.0
January 2013PoorPoorFairFair3515.0
January 2011PoorPoorFairFair3515.0
February 2009PoorPoorFairFair3515.0
January 2007PoorPoorFairFair3515.0
August 2005PoorPoorFairFair3515.0
April 2003PoorPoorFairFair3515.0
November 2000FairFairFairFair3518.0
July 1999FairFairFairFair3518.0
April 1991FairSatisfactorySatisfactorySatisfactory3551.7