13003 over S GRAND RVR

This bridge is no longer in the current National Bridge Inventory database, and has likely been demolished or abandoned.

Map

Coordinates:
+38.44943, -94.10230
38°26'58" N, 94°06'08" W

Facts

Source: National Bridge Inventory. Information not verified; use at your own risk.
Name:13003 over S GRAND RVR
Structure number:15208
Old structure number:0880009 007 (from 1992 edition)
Location:S 10 T 42 N R 29 W
Purpose:Carries highway over waterway
Route classification:Local (Rural) [09]
Length of largest span:60.0 ft. [18.3 m]
Total length:174.9 ft. [53.3 m]
Roadway width between curbs:13.8 ft. [4.2 m]
Deck width edge-to-edge:15.1 ft. [4.6 m]
Owner:County Highway Agency [02]
Year built:1915
Year reconstructed:1950
Historic significance:Historical significance is not determinable at this time [4]
Main span material:Steel [3]
Main span design:Truss - Thru [10]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Wood or Timber [7]

Latest Available Inspection: January 2013

Good/Fair/Poor Condition:Poor
Status:Posted for load [P]
Average daily traffic:35 [as of 2011]
Truck traffic:10% of total traffic
Deck condition:Fair [5 out of 9]
Superstructure condition:Poor [4 out of 9]
Substructure condition:Poor [4 out of 9]
Structural appraisal:Basically intolerable requiring high priority of replacement [2]
Deck geometry appraisal:Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Water adequacy appraisal:Meets minimum tolerable limits to be left in place as is [4]
Roadway alignment appraisal:Basically intolerable requiring high priority of corrrective action [3]
Channel protection:Bank and embankment protection is severely undermined. River control devices have severe damage. Large deposits of debris are in the channel. [4]
Scour condition:Bridge foundations determined to be stable for assessed or calculated scour condition. [5]
Sufficiency rating:18.0
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$699,000

Previous Inspections

DateConditionDeckSuperstructureSubstructureADTSuff. Rating
January 2013PoorFairPoorPoor3518.0
January 2011PoorFairPoorPoor3518.0
February 2009PoorFairPoorPoor3520.0
March 2007PoorFairPoorPoor3520.0
March 2005PoorFairPoorPoor3520.0
March 2003PoorFairFairPoor3534.5
January 2001PoorFairSatisfactoryPoor3534.5
May 1999FairFairSatisfactoryFair3545.5
February 1991FairFairSatisfactorySatisfactory3553.5