Share:

COUNTY RD 180 over HOGLES CR

Map

Coordinates:
+37.94087, -93.46211
37°56'27" N, 93°27'44" W

Facts

Source: National Bridge Inventory. Information not verified; use at your own risk.
Name:COUNTY RD 180 over HOGLES CR
Structure number:15457
Old structure number:0940010 043 (from 1992 edition)
Location:S 21 T 37 N R 23 W
Purpose:Carries highway over waterway
Route classification:Local (Rural) [09]
Length of largest span:15.1 ft. [4.6 m]
Total length:29.9 ft. [9.1 m]
Roadway width between curbs:20.7 ft. [6.3 m]
Deck width edge-to-edge:22.3 ft. [6.8 m]
Owner:County Highway Agency [02]
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Number of main spans:2
Main spans material:Concrete continuous [2]
Main spans design:Slab [01]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Monolithic Concrete (concurrently placed with structural deck) [1]

Latest Available Inspection: March 2017

Good/Fair/Poor Condition:Fair
Status:Open, no restriction [A]
Average daily traffic:15 [as of 2015]
Truck traffic:10% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Structural appraisal:Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck geometry appraisal:Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Water adequacy appraisal:Equal to present minimum criteria [6]
Roadway alignment appraisal:Equal to present desirable criteria [8]
Channel protection:Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7]
Scour condition:Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Sufficiency rating:76.8

Previous Inspections

DateConditionDeckSuperstructureSubstructureADTSuff. Rating
March 2017FairSatisfactorySatisfactorySatisfactory1576.8
March 2015FairSatisfactorySatisfactorySatisfactory1576.8
April 2013FairSatisfactorySatisfactorySatisfactory1576.8
April 2011FairSatisfactorySatisfactorySatisfactory1576.8
April 2009FairSatisfactorySatisfactorySatisfactory1576.8
April 2007FairSatisfactorySatisfactorySatisfactory1576.8
June 2005FairSatisfactorySatisfactorySatisfactory1576.8
April 2003FairSatisfactorySatisfactorySatisfactory1576.8
March 2001FairSatisfactorySatisfactorySatisfactory1575.8
March 1999Fair---1565.8
December 1991Fair---1562.8