Name:COUNTY RD Z-850 over TURKEY CR
Structure number:16935
Old structure number:1370008 077 (from 1992 edition)
Location:S 17 T 23 N R 15 W
Purpose:Carries highway over waterway
Route classification:Local (Rural) [09]
Length of largest span:25.9 ft. [7.9 m]
Total length:51.8 ft. [15.8 m]
Roadway width between curbs:10.8 ft. [3.3 m]
Deck width edge-to-edge:12.1 ft. [3.7 m]
Owner:County Highway Agency [02]
Year built:1939
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Number of main spans:2
Main spans material:Concrete [1]
Main spans design:Slab [01]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Monolithic Concrete (concurrently placed with structural deck) [1]

Latest Available Inspection: October 2017

Good/Fair/Poor Condition:Fair
Status:Open, no restriction [A]
Average daily traffic:20 [as of 2017]
Truck traffic:10% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Fair [5 out of 9]
Structural appraisal:Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck geometry appraisal:Basically intolerable requiring high priority of replacement [2]
Water adequacy appraisal:Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Roadway alignment appraisal:Meets minimum tolerable limits to be left in place as is [4]
Channel protection:Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. [6]
Scour condition:Bridge foundations determined to be stable for assessed or calculated scour condition. [5]
Sufficiency rating:45.7
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$249,000

Previous Inspections

DateConditionDeckSuperstructureSubstructureADTSuff. Rating
October 2017FairSatisfactorySatisfactoryFair2045.7
October 2015FairSatisfactorySatisfactoryFair2045.7
November 2013FairSatisfactorySatisfactoryGood2055.7
March 2012GoodGoodGoodGood2055.7
March 2010GoodGoodGoodGood2055.7
May 2008GoodGoodGoodGood2055.7
March 2006GoodGoodGoodGood2055.7
April 2004GoodGoodGoodGood2055.7
March 2002GoodGoodGoodGood2055.7
April 2000GoodGoodGoodGood2055.7
March 1998GoodGoodGoodGood2055.7
November 1990GoodGoodGoodGood2051.7