Share:

3RD ST over THOMPSON RVR

This bridge is no longer in the current National Bridge Inventory database, and has likely been demolished or abandoned.

Map

Coordinates:
+40.07966, -93.64389
40°04'47" N, 93°38'38" W

Facts

Source: National Bridge Inventory. Information not verified; use at your own risk.
Name:3RD ST over THOMPSON RVR
Structure number:23233
Old structure number:3970008 040 (from 1992 edition)
Location:S 18 T 61 N R 24 W
Purpose:Carries highway over waterway
Route classification:Local (Rural) [09]
Length of largest span:120.1 ft. [36.6 m]
Total length:303.2 ft. [92.4 m]
Roadway width between curbs:18.0 ft. [5.5 m]
Deck width edge-to-edge:18.4 ft. [5.6 m]
Vertical clearance above deck:14.4 ft. [4.4 m]
Owner:County Highway Agency [02]
Year built:1921
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Number of main spans:2
Main spans material:Steel [3]
Main spans design:Truss - Thru [10]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Bituminous [6]

Latest Available Inspection: March 2012

Good/Fair/Poor Condition:Poor
Status:Posted for load [P]
Average daily traffic:100 [as of 2012]
Truck traffic:10% of total traffic
Deck condition:Poor [4 out of 9]
Superstructure condition:Poor [4 out of 9]
Substructure condition:Poor [4 out of 9]
Structural appraisal:Basically intolerable requiring high priority of replacement [2]
Deck geometry appraisal:Meets minimum tolerable limits to be left in place as is [4]
Water adequacy appraisal:Equal to present desirable criteria [8]
Roadway alignment appraisal:Basically intolerable requiring high priority of corrrective action [3]
Channel protection:Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. [6]
Scour condition:Bridge foundations determined to be stable for assessed or calculated scour conditions; field review indicates action is required. [4]
Sufficiency rating:31.8
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$1,115,000

Previous Inspections

DateConditionDeckSuperstructureSubstructureADTSuff. Rating
March 2012PoorPoorPoorPoor10031.8
March 2010PoorPoorPoorFair10031.8
January 2008PoorPoorFairFair10035.7
December 2005PoorPoorFairFair10035.7
August 2004PoorPoorFairFair10035.7
February 2002FairFairFairFair10037.7
March 2000FairSatisfactoryFairFair10038.7
April 1998PoorSatisfactoryFairSerious10034.8
June 1990FairSatisfactorySatisfactorySatisfactory10043.7