Share:

RT O E over W FK GRAND RVR

This bridge is no longer in the current National Bridge Inventory database, and has likely been demolished or abandoned.

Map

Coordinates:
+40.32743, -94.54211
40°19'39" N, 94°32'32" W

Facts

Source: National Bridge Inventory. Information not verified; use at your own risk.
Name:RT O E over W FK GRAND RVR
Structure number:8049
Old structure number:R 12 1 (from 1992 edition)
Location:S 30 T 64 N R 32 W
Purpose:Carries highway over waterway
Route classification:Major Collector (Rural) [07]
Length of largest span:140.4 ft. [42.8 m]
Total length:338.9 ft. [103.3 m]
Roadway width between curbs:20.0 ft. [6.1 m]
Deck width edge-to-edge:22.3 ft. [6.8 m]
Owner:State Highway Agency [01]
Year built:1960
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:M 13.5 / H 15 [2]
Main span material:Steel [3]
Main span design:Truss - Thru [10]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Monolithic Concrete (concurrently placed with structural deck) [1]

Latest Available Inspection: November 2009

Good/Fair/Poor Condition:Poor
Status:Posted for load [P]
Average daily traffic:116 [as of 2008]
Truck traffic:10% of total traffic
Deck condition:Serious [3 out of 9]
Superstructure condition:Serious [3 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Structural appraisal:Basically intolerable requiring high priority of replacement [2]
Deck geometry appraisal:Meets minimum tolerable limits to be left in place as is [4]
Water adequacy appraisal:Basically intolerable requiring high priority of corrrective action [3]
Roadway alignment appraisal:Equal to present minimum criteria [6]
Channel protection:Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. [6]
Scour condition:Bridge foundations determined to be stable for assessed or calculated scour condition. [5]
Sufficiency rating:14.3
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$2,194,000

Previous Inspections

DateConditionDeckSuperstructureSubstructureADTSuff. Rating
November 2009PoorSeriousSeriousSatisfactory11614.3
November 1999PoorSeriousSatisfactorySatisfactory13431.4
January 1992FairSatisfactoryGoodSatisfactory10233.2