Share:

MO 127 S over MUDDY CR

This bridge is no longer in the current National Bridge Inventory database, and has likely been demolished or abandoned.

Map

Coordinates:
+38.73249, -93.41995
38°43'57" N, 93°25'12" W

Facts

Source: National Bridge Inventory. Information not verified; use at your own risk.
Name:MO 127 S over MUDDY CR
Structure number:8569
Location:S 35 T 46 N R 23 W
Purpose:Carries highway over waterway
Route classification:Major Collector (Rural) [07]
Length of largest span:47.9 ft. [14.6 m]
Total length:191.9 ft. [58.5 m]
Roadway width between curbs:20.0 ft. [6.1 m]
Deck width edge-to-edge:21.0 ft. [6.4 m]
Skew angle:25°
Owner:State Highway Agency [01]
Year built:1930
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:M 9 / H 10 [1]
Number of main spans:5
Main spans material:Steel [3]
Main spans design:Stringer/Multi-beam or girder [02]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Bituminous [6]

Latest Available Inspection: October 2009

Good/Fair/Poor Condition:Poor
Status:Posted for load [P]
Average daily traffic:948 [as of 2008]
Truck traffic:10% of total traffic
Deck condition:Serious [3 out of 9]
Superstructure condition:Poor [4 out of 9]
Substructure condition:Poor [4 out of 9]
Structural appraisal:Basically intolerable requiring high priority of replacement [2]
Deck geometry appraisal:Basically intolerable requiring high priority of corrrective action [3]
Water adequacy appraisal:Meets minimum tolerable limits to be left in place as is [4]
Roadway alignment appraisal:Equal to present desirable criteria [8]
Channel protection:Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. [6]
Scour condition:Bridge is scour critical; bridge foundations determined to be unstable. [3]
Sufficiency rating:24.2
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$1,179,000

Previous Inspections

DateConditionDeckSuperstructureSubstructureADTSuff. Rating
October 2009PoorSeriousPoorPoor94824.2