Facts

Source: National Bridge Inventory. Information not verified; use at your own risk.
Name:RT H S over W FK GRAND RVR
Structure number:9078
Old structure number:T 332 1 (from 1992 edition)
Location:S 32 T 63 N R 31 W
Purpose:Carries highway over waterway
Route classification:Major Collector (Rural) [07]
Length of largest span:69.9 ft. [21.3 m]
Total length:340.9 ft. [103.9 m]
Roadway width between curbs:20.0 ft. [6.1 m]
Deck width edge-to-edge:22.3 ft. [6.8 m]
Owner:State Highway Agency [01]
Year built:1947
Historic significance:Historical significance is not determinable at this time [4]
Design load:M 9 / H 10 [1]
Number of main spans:6
Main spans material:Steel continuous [4]
Main spans design:Stringer/Multi-beam or girder [02]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Bituminous [6]

Latest Available Inspection: October 2009

Good/Fair/Poor Condition:Poor
Status:Posted for load [P]
Average daily traffic:334 [as of 2009]
Truck traffic:11% of total traffic
Deck condition:Serious [3 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Poor [4 out of 9]
Structural appraisal:Basically intolerable requiring high priority of replacement [2]
Deck geometry appraisal:Meets minimum tolerable limits to be left in place as is [4]
Water adequacy appraisal:Basically intolerable requiring high priority of corrrective action [3]
Roadway alignment appraisal:Equal to present desirable criteria [8]
Channel protection:Bank and embankment protection is severely undermined. River control devices have severe damage. Large deposits of debris are in the channel. [4]
Scour condition:Bridge is scour critical; bridge foundations determined to be unstable. [3]
Sufficiency rating:2.0
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$1,735,000

Previous Inspections

DateConditionDeckSuperstructureSubstructureADTSuff. Rating
October 2009PoorSeriousSatisfactoryPoor3342.0
November 1999FairFairSatisfactorySatisfactory40827.7
January 1992FairFairSatisfactorySatisfactory33330.6