Share:

RT J E over MID FK SALT RVR

Map

Coordinates:
+39.57373, -92.26531
39°34'25" N, 92°15'55" W

Facts

Source: National Bridge Inventory. Information not verified; use at your own risk.
Name:RT J E over MID FK SALT RVR
Structure number:9742
Old structure number:X 624 1 (from 1992 edition)
Location:S 8 T 55 N R 12 W
Purpose:Carries highway over waterway
Route classification:Major Collector (Rural) [07]
Length of largest span:80.1 ft. [24.4 m]
Total length:184.1 ft. [56.1 m]
Roadway width between curbs:20.0 ft. [6.1 m]
Deck width edge-to-edge:23.3 ft. [7.1 m]
Skew angle:30°
Owner:State Highway Agency [01]
Year built:1950
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:M 9 / H 10 [1]
Number of main spans:3
Main spans material:Steel continuous [4]
Main spans design:Stringer/Multi-beam or girder [02]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Bituminous [6]

Latest Available Inspection: October 2018

Good/Fair/Poor Condition:Poor
Status:Posted for load [P]
Average daily traffic:180 [as of 2017]
Truck traffic:12% of total traffic
Deck condition:Poor [4 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Structural appraisal:Meets minimum tolerable limits to be left in place as is [4]
Deck geometry appraisal:Meets minimum tolerable limits to be left in place as is [4]
Water adequacy appraisal:Equal to present minimum criteria [6]
Roadway alignment appraisal:Equal to present minimum criteria [6]
Channel protection:Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. [6]
Scour condition:Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Sufficiency rating:47.9
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$1,015,000

Previous Inspections

DateConditionDeckSuperstructureSubstructureADTSuff. Rating
October 2018PoorPoorSatisfactorySatisfactory18047.9
October 2016PoorPoorSatisfactorySatisfactory17847.9
October 2014PoorPoorSatisfactorySatisfactory23847.5
October 2012FairFairSatisfactorySatisfactory24449.6
December 2010FairFairGoodSatisfactory26048.6
October 2008FairFairGoodSatisfactory22047.4
November 2007FairFairGoodSatisfactory26648.6
November 2005FairSatisfactoryGoodSatisfactory26449.7
November 2003FairSatisfactoryGoodSatisfactory26849.6
October 2002FairSatisfactoryGoodGood27049.6
December 2001FairSatisfactoryGoodGood20648.5
July 2000FairSatisfactoryGoodGood16048.0
November 1999FairSatisfactoryGoodGood15548.0
February 1999FairSatisfactoryGoodGood15548.0
October 1997FairSatisfactoryGoodGood15548.0
January 1997FairSatisfactoryGoodGood24947.6
January 1996FairSatisfactoryGoodGood24949.1
November 1994FairSatisfactoryGoodGood23849.1
December 1993FairSatisfactoryGoodSatisfactory23449.1
November 1992FairSatisfactoryGoodGood23449.1
December 1991FairSatisfactoryGoodGood17749.4