Share:

TERLAND RD over BRIDGER CREEK 053

Map

Coordinates:
+45.72474, -109.68980
45°43'29" N, 109°41'23" W

Facts

Source: National Bridge Inventory. Information not verified; use at your own risk.
Name:TERLAND RD over BRIDGER CREEK 053
Structure number:L49124000+02001
Location:5M SE GREYCLIFF
Purpose:Carries highway over waterway
Route classification:Local (Rural) [09]
Length of largest span:40.0 ft. [12.2 m]
Total length:42.0 ft. [12.8 m]
Roadway width between curbs:15.7 ft. [4.8 m]
Deck width edge-to-edge:15.7 ft. [4.8 m]
Owner:County Highway Agency [02]
Year built:1975
Year reconstructed:2012
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Main span material:Steel [3]
Main span design:Stringer/Multi-beam or girder [02]
Deck type:Steel plate (includes orthotropic) [5]

Latest Available Inspection: November 2017

Good/Fair/Poor Condition:Fair
Status:Open, no restriction [A]
Average daily traffic:100 [as of 2003]
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Good [7 out of 9]
Structural appraisal:Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck geometry appraisal:Equal to present desirable criteria [8]
Water adequacy appraisal:Better than present minimum criteria [7]
Roadway alignment appraisal:Equal to present minimum criteria [6]
Channel protection:Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. [8]
Scour condition:Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Sufficiency rating:67.1

Previous Inspections

DateConditionDeckSuperstructureSubstructureADTSuff. Rating
November 2017FairSatisfactorySatisfactoryGood10067.1
November 2015FairSatisfactorySatisfactoryGood10067.1
December 2013FairSatisfactorySatisfactoryGood10067.3
April 2012FairSatisfactorySatisfactoryGood10067.3
December 2011----10013.6
November 2009PoorSatisfactoryGoodPoor10027.7
December 2007FairSatisfactorySatisfactoryFair10027.7
December 2005FairVery GoodVery GoodFair10027.7
October 2003FairVery GoodVery GoodSatisfactory10036.0
March 2002FairVery GoodVery GoodSatisfactory10036.0
April 2000PoorSatisfactorySeriousSatisfactory10027.7
May 1998PoorSatisfactorySeriousSatisfactory10027.7
December 1995PoorSatisfactorySeriousSatisfactory3131.6
January 1992PoorSatisfactoryPoorVery Good3131.6
December 1989FairSatisfactoryFairVery Good3164.7

Element Data

Source: National Bridge Elements dataset, 2019 edition. This feature is experimental.
ElementUnitsQuantity1-Good2-Fair3-Poor4-Serious
Superstructure
Steel Girder/Beamlinear ft.331033100
Substructure
Steel Columneach1001000
Timber Abutmentlinear ft.7979000
Steel Pier Caplinear ft.3303300
Deck
Open Grid Decksq. ft.667066700
Wearing Surfacessq. ft.168165300
Steel Protective Coatingsq. ft.667006670
Bearings
Fixed Bearingeach1601600