SR1405 over POLECAT CREEK
Map
Coordinates:
+35.44685, -77.5370335°26'49" N, 77°32'13" W
Facts
Source: National Bridge Inventory. Information not verified; use at your own risk.
Name: | SR1405 over POLECAT CREEK |
Structure number: | 000000000790057 |
Old structure number: | 000000000079057 (from 1992 edition) |
Location: | 0.3 MI.W. OF JCT.SR1407 |
Purpose: | Carries highway over waterway |
Route classification: | Local (Rural) [09] |
Length of largest span: | 17.1 ft. [5.2 m] |
Total length: | 51.8 ft. [15.8 m] |
Roadway width between curbs: | 27.9 ft. [8.5 m] |
Deck width edge-to-edge: | 29.2 ft. [8.9 m] |
Owner: | State Highway Agency [01] |
Year built: | 1967 |
Historic significance: | Bridge is not eligible for the National Register of Historic Places [5] |
Design load: | M 9 / H 10 [1] |
Number of main spans: | 3 |
Main spans material: | Wood or timber [7] |
Main spans design: | Stringer/Multi-beam or girder [02] |
Deck type: | Concrete Cast-in-Place [1] |
Wearing surface: | Monolithic Concrete (concurrently placed with structural deck) [1] |
Latest Available Inspection: January 2018
Good/Fair/Poor Condition: | Poor |
Status: | Posted for load [P] |
Average daily traffic: | 270 [as of 2013] |
Truck traffic: | 6% of total traffic |
Deck condition: | Poor [4 out of 9] |
Superstructure condition: | Fair [5 out of 9] |
Substructure condition: | Satisfactory [6 out of 9] |
Structural appraisal: | Somewhat better than minimum adequacy to tolerate being left in place as is [5] |
Deck geometry appraisal: | Somewhat better than minimum adequacy to tolerate being left in place as is [5] |
Water adequacy appraisal: | Better than present minimum criteria [7] |
Roadway alignment appraisal: | Equal to present desirable criteria [8] |
Channel protection: | Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. [6] |
Pier/abutment protection: | Navigation protection not required [1] |
Scour condition: | Bridge with "unknown" foundation that has not been evaluated for scour. [U] |
Sufficiency rating: | 69.2 |
Recommended work: | Bridge rehabilitation because of general structure deterioration or inadequate strength. [35] |
Previous Inspections
Date | Condition | Deck | Superstructure | Substructure | ADT | Suff. Rating |
---|
January 2018 | Poor | Poor | Fair | Satisfactory | 270 | 69.2 |
January 2016 | Fair | Fair | Fair | Satisfactory | 310 | 71.0 |
January 2014 | Fair | Fair | Fair | Satisfactory | 310 | 71.0 |
January 2012 | Fair | Fair | Fair | Fair | 230 | 74.0 |
January 2010 | Fair | Satisfactory | Fair | Satisfactory | 280 | 67.1 |
May 2008 | Fair | Fair | Satisfactory | Fair | 340 | 66.0 |
March 2006 | Fair | Fair | Satisfactory | Fair | 340 | 52.4 |
December 2003 | Fair | Fair | Satisfactory | Fair | 370 | 56.2 |
July 2002 | Fair | Fair | Satisfactory | Fair | 270 | 58.9 |
September 2000 | Fair | Fair | Satisfactory | Fair | 270 | 58.9 |
August 1998 | Fair | Fair | Satisfactory | Fair | 280 | 58.8 |
September 1996 | Fair | Fair | Satisfactory | Fair | 310 | 65.2 |
April 1994 | Poor | Fair | Serious | Poor | 290 | 38.1 |
March 1992 | Poor | Fair | Poor | Fair | 500 | 45.1 |
February 1990 | Poor | Fair | Poor | Poor | 650 | 44.2 |